• Title/Summary/Keyword: Construction Stage Analysis

Search Result 927, Processing Time 0.028 seconds

Analysis of Irrigation Efficiency and Pattern in Galshin Pumping District (갈신양수장 관개지구의 관개효율과 관개패턴분석)

  • Ryu, Bumhee;Park, Seungki
    • Journal of Korean Society of Rural Planning
    • /
    • v.26 no.3
    • /
    • pp.91-102
    • /
    • 2020
  • The purpose of study was analyze the pumping characteristics, Irrigation Efficiency(IE), and irrigation pattern by period of rice growing stage with based on the performance of design irrigation water requirement and operational Galshin Pumping(GP) station in GP irrigation district constructed under rural water development project master plan. GP station was located in Yedang reservoir, Yesan-gun, Chungcheongnam-do and has been supplying irrigation water since 2006. The research data are the Irrigation Water Requirement(IWR) and the Pumping Water Amount(PWA) from 2006 to 2015 at the GP station, which is the supplied amount. The IWR were calculated using the Blaney-Criddle formula of the HOMWRS program, Hydrological Operation Model for Water Resource System, developed by Korea Rural Community Corporation. The Blaney-Criddle formula was used to calculate design irrigation water requirement of Galshin rural water development project master plan. During 2006-2015, the study period, the annual average IWR is 763.2(±149.1)mm, the annual PWA of the GP station is 397.4mm to 1,056.9mm, and those average annual PWA is 643.4(±208.4)mm. The annual IE of GP station 96.5% to 169.0%, and the average annual IE is 124.3%, which is higher than the research results conducted in other pumping stations. Analyzing the irrigation patterns of the GP irrigation district, the IWR Ratio per 10days(IWRR) and the PWA Ratio per 10days(PWAR) of the G P station were obtained. The IWRR is the percentage of IWR for each 10 days of a month to total IWR per year, and the PWAR is the percentage of PWA for each 10 days of a month to total PWA per year. The Kolmogorov- Smirnov(K-S) test results of IWRR and PWAR showed the characteristics classification by rice growing stage and stable normal distribution characteristics. Average IWRR(AIWRR) and Average PWAR(APWAR) are presented as irrigation patterns. Irrigation pattern analysis will be able to standardize comparison, analysis and probability calculation of the pumping station characteristics of different pumping stations and apply to objective evaluation of the pumping station district.

Post-yielding tension stiffening of reinforced concrete members using an image analysis method with a consideration of steel ratios

  • Lee, Jong-Han;Jung, Chi-Young;Woo, Tae-Ryeon;Cheung, Jin-Hwan
    • Advances in concrete construction
    • /
    • v.7 no.2
    • /
    • pp.117-126
    • /
    • 2019
  • When designing reinforced concrete (RC) members, the rebar is assumed to resist all tensile forces, but the resistance of the concrete in the tension area is neglected. However, concrete can also resist tensile forces and increase the tensile stiffness of RC members, which is called the tension stiffening effect (TSE). Therefore, this study assessed the TSE, particularly after yielding of the steel bars and the effects of the steel ratio on the TSE. For this purpose, RC member specimens with steel ratios of 2.87%, 0.99%, and 0.59% were fabricated for uniaxial tensile tests. A vision-based non-contact measurement system was used to measure the behavior of the specimens. The cracks on the specimen at the stabilized cracking stage and the fracture stage were measured with the image analysis method. The results show that the number of cracks increases as the steel ratio increases. The reductions of the limit state and fracture strains were dependent on the ratio of the rebar. As the steel ratio decreased, the strain after yielding of the RC members significantly decreased. Therefore, the overall ductility of the RC member is reduced with decreasing steel ratio. The yielding plateau and ultimate load of the RC members obtained from the proposed equations showed very good agreement with those of the experiments. Finally, the image analysis method was possible to allow flexibility in expand the measurement points and targets to determine the strains and crack widths of the specimens.

A Study on the Improvement for Design VE Job Plan through the Benchmarking (벤치마킹을 통한 설계VE 추진절차 개선에 관한 연구)

  • Um Ik-Jun;Jung Young-Il;Kim Chul-Woong;Hyun Chang-Teak
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.88-95
    • /
    • 2001
  • To convert the construction industry from 'the high cost, the low efficiency' to 'the low cost, the high efficiency and value-added industry' and to enhance the performance and quality of products while reducing the cost, the related law and guideline were established and promulgated, which regulate that value engineering workshop during the preliminary design and the detail design stage should be a mandatory process. But VE practitioners are still confusing in choosing the proper value engineering process, because processes those are described in the various references use the different terms, steps and activities, even though they have their own specific characteristics. To resolve these confusions, the existing steps and activities of three kinds of the literature, four kinds of the organization's policy and other four kinds of study examples relating to the design VE were examined. And then, the differences and expecting problems were extracted through the comparison and analysis of those materials. After that, VE specialists' opinion through the questionnaire survey were grasped. Based on those studies the improved design VE Job Plan and activity statements were suggested.

  • PDF

A Study of FEED Verification process of Small Utility Equipment in Offshore plant (해양플랜트 소형 유틸리티장비의 FEED 검증 프로세스에 대한 연구)

  • Han, Seong-Jong;Park, Beom
    • Plant Journal
    • /
    • v.13 no.2
    • /
    • pp.39-45
    • /
    • 2017
  • This paper is a study on FEED validation model that can be used in the bidding stage of small utility equipment in offshore plant industry using system engineering technique. Currently, domestic marine plant equipment industry companies are faced with the financial risk of project execution as they enter marine plant. The major cause was the insufficient ability to verify the FEED output from the contractor (Engineering or Procurement and Construction) of the equipment manufacturer (COMPANY or EPC). Therefore, we propose FEED design verification method that simplifies the system engineering method that sequentially applies requirements analysis, function, performance analysis and physical architecture building process. Also, we verified the suitability of the developed model by comparing the results of applying the developed FEED verification model and the verification method that depends on the existing experience for the small utility equipment (Air Compressor).

  • PDF

Multi-layered Ground Back Analysis of Retaining Wall Using Differential Evolution Algorithm : Basic Research of Digital Twin (차분진화 알고리즘을 이용한 흙막이 벽체의 다층지반 역해석 : 디지털 트윈 기초연구)

  • Lee, Donggun;Kang, Kyungnam;Song, Kiil
    • Journal of the Korean GEO-environmental Society
    • /
    • v.23 no.1
    • /
    • pp.25-30
    • /
    • 2022
  • It is very important to investigate the ground properties of a construction site for the stability during the construction of the retaining wall. In the retaining wall construction stage, ground properties are checked through ground investigation, but the actual ground properties may be different from the ground investigation result. In order to analyze the stability of the retaining wall in real time, it is important to reflect the properties of the actual ground. Also, when it is judged that the wall is unstable, an appropriate solution must be provided for the stability of the wall. This study aims to present a technique for predicting the actual ground properties through a differential evolution algorithm and judging the stability of the earth wall in real time through the digital twin of the retaining wall.

Prediction of squeezing phenomenon in tunneling projects: Application of Gaussian process regression

  • Mirzaeiabdolyousefi, Majid;Mahmoodzadeh, Arsalan;Ibrahim, Hawkar Hashim;Rashidi, Shima;Majeed, Mohammed Kamal;Mohammed, Adil Hussein
    • Geomechanics and Engineering
    • /
    • v.30 no.1
    • /
    • pp.11-26
    • /
    • 2022
  • One of the most important issues in tunneling, is the squeezing phenomenon. Squeezing can occur during excavation or after the construction of tunnels, which in both cases could lead to significant damages. Therefore, it is important to predict the squeezing and consider it in the early design stage of tunnel construction. Different empirical, semi-empirical and theoretical-analytical methods have been presented to determine the squeezing. Therefore, it is necessary to examine the ability of each of these methods and identify the best method among them. In this study, squeezing in a part of the Alborz service tunnel in Iran was estimated through a number of empirical, semi- empirical and theoretical-analytical methods. Among these methods, the most robust model was used to obtain a database including 300 data for training and 33 data for testing in order to develop a machine learning (ML) method. To this end, three ML models of Gaussian process regression (GPR), artificial neural network (ANN) and support vector regression (SVR) were trained and tested to propose a robust model to predict the squeezing phenomenon. A comparative analysis between the conventional and the ML methods utilized in this study showed that, the GPR model is the most robust model in the prediction of squeezing phenomenon. The sensitivity analysis of the input parameters using the mutual information test (MIT) method showed that, the most sensitive parameter on the squeezing phenomenon is the tangential strain (ε_θ^α) parameter with a sensitivity score of 2.18. Finally, the GPR model was recommended to predict the squeezing phenomenon in tunneling projects. This work's significance is that it can provide a good estimation of the squeezing phenomenon in tunneling projects, based on which geotechnical engineers can take the necessary actions to deal with it in the pre-construction designs.

Development of Extraction Method of Slab Curling Shape of jointed Concrete Pavement Using Profile Data (줄눈 콘크리트포장의 프로파일 데이터를 이용한 슬래브의 컬링형상 추출기법 개발)

  • Chon, Beom-Jun;Lee, Seung-Woo;Mun, Sung-Ho
    • International Journal of Highway Engineering
    • /
    • v.10 no.4
    • /
    • pp.9-18
    • /
    • 2008
  • Curling is caused by the difference in the temperature and humidity by the depth of the slab in Jointed Plain Concrete Pavement. Slab curvature shape and size change due to curling exert a profound influence on the internal stress and roughness of the pavement, affecting structural and functional performance of the pavement. Direct measurement of the slab curvature entails many problems. Many measuring instruments have to be installed at the early-stage of the pavement construction, and the behavior of the slab curvature needs to be measured accurately from the early-stage. Moreover, the cost and technical difficulty are very formidable to measure the slab curvature. This study develops a measurement method for slab curvature in jointed concrete pavement at any given time by applying Power Spectrum Density Analysis and Inverse Fast Fourier Transformation to the profile data, that can be easily obtained at the construction field site. The effectiveness of this developed method is verified by measuring the profile data of the test road of jointed concrete pavement at an inland central expressway by the hour and by examining the result of extracting the slab curvature shape from this profile data. Additionally, the profile data of CRCP(Continuously Reinforced Concrete Pavement) sections on the same expressway were obtained and analyzed at the same time. The validity of the method developed for the slab curvature shape extraction is verified by comparing the result from the analysis of the profile data of CRCP sections with that from the analysis of the prof1Ie data of jointed concrete pavement sections.

  • PDF

Implementation of Constructor-Oriented Visualization System for Occluded Construction via Mobile Augmented-Reality (모바일 증강현실을 이용한 작업자 중심의 폐색된 건축물 시각화 시스템 개발)

  • Kim, Tae-Ho;Kim, Kyung-Ho;Han, Yunsang;Lee, Seok-Han;Choi, Jong-Soo
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.51 no.2
    • /
    • pp.55-68
    • /
    • 2014
  • Some infrastructure these days is usually constructed under the ground for it to not interfere the foot-traffic of pedestrians, and thus, it is difficult to visually confirm the accurate location of the site where the establishments must be buried. These technical difficulties increase the magnitude of the problems that could arise from over-reliance on the experience of the worker or a mere blueprint. Such problems include exposure to flood and collapse. This paper proposes a constructor-oriented visualization system via mobile gadgets in general construction sites with occluded structures. This proposal is consisted with three stages. First, "Stage of detecting manhole and extracting features" detects and extracts the basis point of occluded structures which is unoccluded manhole. Next, "Stage of tracking features" tracks down the extracted features in the previous stage. Lastly, "Stage of visualizing occluded constructions" analyzes and synthesizes the GPS data and 3D objects obtained from mobile gadgets in the previous stages. This proposal implemented ideal method through parallel analysis of manhole detection, feature extraction, and tracking techniques in indoor environment, and confirmed the possibility through occluded water-pipe augmentation in real environment. Also, it offers a practical constructor-oriented environment derived from the augmented 3D results of occluded water-pipings.

Analysis of Water Quality Characteristics According to Short-term Fluctuation of Water Level in the New Dam: Focused on the Upstream Watershed of Yeongju Multipurpose Dam (신규 댐 건설 전후의 수질변동 분석: 영주댐 상류유역을 중심으로)

  • Lee, Saeromi;Park, Jae Roh;Hwang, Tae Mun;Ahn, Chang Hyuk
    • Journal of Korean Society on Water Environment
    • /
    • v.36 no.5
    • /
    • pp.431-444
    • /
    • 2020
  • The relationship between dam construction and water quality has recently come to be considered an important issue. A dam is a physical factor which causes changes to the river system around it. Considering these points, this study was conducted to obtain basic data by analyzing the relationship between water level fluctuations and water quality parameters in the short-term. In terms of methodology, the new construction of the Yeongju Dam (M5) in 2016 was divided into Stage 1 as the lotic system and Stage 2 as the lentic system, with four years in each period, and the water level fluctuations and water quality were analyzed using official data. As a result of this study, M5, a stagnant area in which organic matter and nutrients accumulate, was found to be an important factor in water quality management. In addition, the water level changed rapidly (0.9±0.2 m → 10.9±7.1 m) as the river environment condition was converted from the lotic system to the lentic system. In addition, water quality parameters such as BOD, COD, TOC, and Chl-a significantly changed in the short-term. Further, since the transport of organic matter and nutrients occurred well in the lotic system, sedimentation was expected to be dominant in the lentic system. Therefore, it was determined that when the river flow is blocked, autochthonous organic matter is an important factor for long-term water quality management in the future. This process can increase the trophic state of the water body. As a result of this study, the TSIKO value was converted from mesotrophic in Stage 1 to eutrophic in Stage 2. Eventually, short-term changes in the river environment will affect not only changes in water level but also changes in water quality. Thus, a comprehensive and strategic approach is needed for long-term water quality management in the future.

A Study on the Displacement Behavior according to the Analysis Model of Ground Excavation (지반굴착 해석모델에 따른 변위거동에 관한 연구)

  • Chung, Jeeseung;Shin, Youngwan;Kim, Manhwa;Kook, Yunmo;Jeong, Kyukyung;Kim, Pilsoo;Lee, Sanghwan
    • Journal of the Korean GEO-environmental Society
    • /
    • v.19 no.4
    • /
    • pp.27-32
    • /
    • 2018
  • There were many ground excavation projects from past to present to make effective use of the limited land. And it is very important to predict the ground behavior depending on construction stage for ground excavation. Excavation of the ground involves changes in the stress and displacement of the ground around the excavated surface. Thus it affects the stability of the adjacent structure as well as the excavated surface. Therefore, it is very important to predict the ground behavior and stability of adjacent structure. And nowadays, numerical analysis methods are most often used to predict the effects of ground excavation. Recent, improvements of numerical analysis programs, along with improved computer performance, have helped solve complicated ground problems. However, except some specialized numerical analysis, most numerical analysis often predicts larger excavation floor displacement than field data due to adopt the Mohr-Coulomb analysis model. As a result, it raise the problem that increasing the amount of support on ground and structure. In this study, ground behavior analysis depending on analysis model (Mohr-Coulomb, Duncan-Chang, Modified Mohr-Coulomb and Hardening Soil model) has been carried out through the numerical analysis. When numerical analysis is carried out, this study is expected to be used as a basic data for adopting a suitable analysis model in various ground excavation project.