• 제목/요약/키워드: Construction Stage

검색결과 2,329건 처리시간 0.037초

지속가능한 도시기반시설 건설을 위한 잠재적 환경영향 발생 특성 평가 - 하수처리시설, 하수관거, 방수로를 중심으로 - (The Environmental Impact Assessment for Sustainable Urban Infrastructure Construction - A Case Study on Wastewater Treatment Plant, Sewerage System and Tailrace -)

  • 박광호;김창희;황용우
    • 상하수도학회지
    • /
    • 제20권6호
    • /
    • pp.919-926
    • /
    • 2006
  • In this study, environmental impact assessments of wastewater treatment plant (WWTP), sewerage system, and tailrace were performed using LCA methodology. The life cycle stages were divided into 3 categories; construction stage, maintenance stage and demolition & disposal stage. As a tool of impact assessment, Ecoindicator99 containing fate analysis, exposure & effect analysis and damage analysis, was used. As tile results of WWTP LCA, more than 80% of environmental impact was produced from maintenance stage. On the other hand, most of environmental impact was produced from construction stage in the case of tailrace and sewerage system construction.

Support Vector Machine을 이용한 교육시설 초기 공사비 예측에 관한 연구 (A Study on Predicting Construction Cost of School Building Projects Based on Support Vector Machine Technique at the Early Project Stage)

  • 신재민;박현영;신윤석;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.153-154
    • /
    • 2012
  • The accuracy of cost estimation at an early stage in school building project is one of the critical factors for successful completion. So many method and techniques have developed that can estimate construction cost using limited information available in the early stage. Among the techniques, Support Vector Machine(SVM) has received attention in various field due to its excellent capacity for self-learning and generalization performance. Therefore, the purpose of this study is to verify the applicability of cost prediction model based on SVM in school building project at the early stage. Data used in this study are 139 school building cost constructed from 2004 to 2007 in Gyeonggi-Do. And prediction error rate of 7.48% in support vector machine is obtained. So the results showed applicability of using SVM model for predicting construction cost of school building projects.

  • PDF

국내 건설공사 초기단계에서의 참여주체별 중점안전관리항목 조사연구 (Safety Management Priority Classified by Participants in Planning & Design Stages)

  • 송도흠;여상구;고성석
    • 한국안전학회지
    • /
    • 제25권1호
    • /
    • pp.50-56
    • /
    • 2010
  • The safety accidents of domestic construction happened more than other industries is performed only under the construction stage. In the foreign countries, however, owners and designers play an important role on safety in an early stage. Therefore, numerous studies were carried out by getting rid of accident risks and institutionalizing prevention activities in an construction stages. Accordingly, this study have performed to deduce the pivotal point of safety management items classified by the subject suitable for construction by introducing of safety conception of domestic and international design and suggested the improvement methods of safety management plans of the planning design stage so as to perform more efficient safety management.

The global standard realizing process of the Tire Production Facility and Process Line

  • Suzuki, Takeshi
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.28-29
    • /
    • 2015
  • The tire production facility is a large-scale construction with the complexity of a manufacturing process. The process utilities should be wide-ranging as an effective arrangement of them is highly important. All the necessary information should be clarified together with the manufacturer at the basic planning stage, and this design should be developed to comply with the local culture and regulations. It is important to carry out more advanced engineering in terms of process, cost and quality, even if it is difficult to standardize due to the cultural and geographical conditions and regulations. The key point is to reflect all the given conditions and make a clear design during the design stage, to eliminate the problems after the construction has begun. Another key point is the delivery system, which must be totally managed from the initial design stage until the construction stage by proven companies. Flexibility, quick action, and single responsibility will be the fundamental features in all the steps of the project.

  • PDF

An Information Model to Facilitate Sustainable Design of Building Projects in the UAE

  • Zaneldin, Essam
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.544-548
    • /
    • 2015
  • As urbanization increases in UAE, the demand for housing and infrastructures also grows. The challenge is to continue to build but in a different way considering more energy-efficient sustainable buildings. Producing a sustainable design is highly dependent upon effective participation among the diverse parties involved. In the construction industry in the UAE, these parties are fragmented due to the multistage nature of construction projects and multidisciplinary participants, particularly during the design stage. The decisions made during this stage have an extensive impact on subsequent stages of a project's life cycle. Having a sustainability expert during the design stage is important and the awareness of sustainability requirements by all design participants is of equal importance. In this research, recent advances in information technology are used to develop an information model that will improve the sustainability of building during the design stage. An information framework for storing design information and sustainability performance criteria is developed, allowing design participants to collaborate in an integrated environment. This research is expected to help designers produce sustainable designs for building projects.

  • PDF

MOVEMENT CONTROL OF HIGH-RISE BUILDINGS DURING CONSTRUCTION

  • Taehun Ha;Sungho Lee;Bohwan Oh
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.46-51
    • /
    • 2011
  • High-rise buildings are widely being constructed in the Middle-East, South-East, and East Asia. These buildings are usually willing to stand for the landmark of the region and, therefore, exhibit some extraordinary features such as super-tall height, elevation set-backs, overhangs, or free-form exterior surface, all of which makes the construction difficult, complex, and even unsafe at some construction stages. In addition to the elaborately planned construction sequence, prediction and monitoring of building's movement during construction and after completion are required for precise and safe construction. This is often called the Building Movement Control during construction. This study describes Building Movement Control of the KLCC Tower, a 58-story office building currently being built right next to the famous PETRONAS Twin Towers. The main items of the Building Movement Control for the KLCC Tower are axial shortening and verticality. Preliminary prediction of these items are already carried out by the structural design team but more accurate prediction based on construction stage analysis and combined with time-dependent material testing, field monitoring, and site survey is done by the main contractor. As of September 2010, the Tower is under construction at level 30, where the plan abruptly changes from rectangle to triangle. Findings and troubleshooting until the current construction stage are explained in detail and implementations are suggested for future applications.

  • PDF

BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구 (Development of Construction Schedule Management System based on BIM)

  • 박소현;송정화;오건수
    • 대한건축학회논문집:구조계
    • /
    • 제34권3호
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

현수교의 시공절차와 인위적 불확실성을 고려한 구조신뢰성 평가 (Structural Reliability Evaluation Considering Construction Stage and Epistemic Uncertainty of Suspension Bridges)

  • 한성호;신재철
    • 대한토목학회논문집
    • /
    • 제29권3A호
    • /
    • pp.181-188
    • /
    • 2009
  • 본 연구에서는 현수교의 합리적인 시공방안 결정 및 구조안전성 평가에 대한 기초자료를 제시하였다. 기 연구된 현수교의 해석모델 및 신뢰성이론을 바탕으로 초기형상해석, 자유진동해석, 시공변수를 고려한 시공단계해석 및 신뢰성해석 등을 수행 할 수 있는 수치해석프로그램을 개발하였다. 현수교의 시공방안은 보강형의 시공순서, 시공방향 및 주경간과 측경간의 동시 시공성 등의 다양한 시공변수를 고려하여 설정하였다. 시공방안에 따른 동적시공단계해석은 작성된 해석프로그램에 의해 수행하였으며 주요부재의 응답특성을 검토하여 각각의 시공방안에 대한 장 단점을 제시하였다. 시공단계별 구조신뢰성해석은 자연적 불확실성을 고려하여 신뢰성지수 및 파괴확률을 산정함으로써, 설정된 시공방안에 따른 현수교의 안전성을 정량적으로 평가하였다. 아울러, 인위적 불확실성을 고려하여 산정된 해석결과에 대해 재평가하였으며, 시공단계 위험성의 주요 퍼센트 분포를 빈도수 히스토그램을 이용하여 제시하였다.

주거용 RC 벽식 건물의 시공 중 재현주기에 따른 지진하중의 영향 (Effects of Seismic Loads with Different Return Period on Residential Building with RC Shear Wall Structure under Construction)

  • 최성현;김재요
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제26권2호
    • /
    • pp.43-50
    • /
    • 2022
  • 설계단계에서 구조적 안전성을 확인하더라도, 시공단계에서는 구조시스템이 완전히 형성되지 않아 구조적 안전성이 보장되지 않는다. 또한 시공 기간은 완공된 이후의 건물의 사용기간보다 짧기 때문에 설계단계에서와 같은 지진하중을 시공단계에 적용하는 것은 과다하다. ASCE 37-14는 시공 중 지진하중 저감계수의 개념을 제시하고 있지만, 명확한 적용 방법을 제공하지 않고 있다. 따라서, 이 연구에서는 재현주기에 따라 저감한 지진하중을 주거용 중층 RC건물의 예제 모델에 적용하였다. 예제모델의 시공단계를 5층 단위로 구분하였으며, 시공단계 모델들에 재현주기 변화에 따른 지진하중을 적용하여 시공 중 지진하중을 분석하고 구조 부재의 단면성능 검토를 수행하였다. 설계단계와 시공단계에서의 전단벽 설계강도비를 비교하여, 주거용 중층 RC 건물의 시공 중 안전성을 확보할 수 있는 지진하중 크기의 범위를 재현주기의 관점에서 분석하였다.

시공단계 구조해석을 통한 적층형 모듈러주택의 시공조건 검토 (A Study on Construction Condition of Modular System by Structural Analysis of Construction Stage)

  • 조민주;김종성;유성용;최기봉
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제19권2호
    • /
    • pp.143-150
    • /
    • 2015
  • 현재 국내 모듈러 구조물은 저층의 단독주택 및 군 병영생활관에 한정되어 있는 실정이며, 적층식 모듈러 구조물에 대한 표준화된 구조설계 방법이 없으므로 구조물의 시공과정에서 모듈의 양중이나 운송 시 발생되는 관성력, 양중 시 구조물에 대한 풍하중의 영향, 모듈의 적층 설치 시 충격력 등에 대한 검토가 일반적으로 이루어지고 있지 않다. 따라서 본 연구에서는 대상 모듈러 시스템에 대한 단계별 시공방법을 살펴보고, 각 시공단계에 대한 구조해석 시 경계조건 및 하중 작용위치를 결정하였다. 또한 모듈의 양중 및 차량운반 시 각각의 속도에 따른 관성력을 산정하였으며 모듈의 적층설치 작업 시 양중속도에 따른 충격하중과 양중에 의한 설치작업 시 순간풍속에 의한 풍하중을 산정하였다. 제안된 방법을 토대로 대상 모듈러 시스템에서 양중 시와 운송 시, 설치 시 등 시공단계별 하중크기 결정조건을 변화시켜 구조검토를 수행하였으며 구조적으로 안전성이 확보되는 시공조건을 도출하였다.