• 제목/요약/키워드: Construction Resource Management

검색결과 496건 처리시간 0.023초

CONSTRUCTION BUSINESS PROCESS AUTOMATION USING WORKFLOW TECHNOLOGY

  • Dong-Eun Lee
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.569-574
    • /
    • 2005
  • This paper presents the core technology of Construction Business Process Automation to model and automate construction business processes. Business Process Reengineering (BPR) and Automation (BPA) have been recognized as one of the important aspects in construction business management. However, BPR requires a lot of efforts to identify, document, implement, execute, maintain, and keep track thousands of business processes to deliver a project. Moreover, existing BPA technologies used in existing Enterprise Resource Planning (ERP) systems do not lend themselves to effective scalability for construction business process management. Application of Workflow and Object Technologies would be quite effective in implementing a scalable enterprise application for construction community. This paper present the technologies and methodologies for automating construction business processes by addressing how: 1) Automated construction management tasks are developed as software components, 2) The process modeling is facilitated by dragging-and dropping task components in a network, 3) Raising business requests and instantiating corresponding process instances are delivered, and 4) Business process instances are executed by using workflow technology based on real-time simulation engine. This paper presents how the construction business process automation is achieved by using equipment reservation and cancellation processes simplified intentionally.

  • PDF

이산 사건 시뮬레이션을 활용한 건설공정 CO2 배출량 추정 시스템 (An Estimating System for the CO2 Emissions using Discrete Event Simulation)

  • 이창용;곽한성;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.196-197
    • /
    • 2014
  • Low carbon construction is an important operation management goal such as cost, time, and quality in construction community. This paper introduces a system which measures the variability of carbon dioxide amounts. First, this system allows creating construction operation models of which the level of detail is breakdown into the work task level. Second, the system implements sensitivity analysis along with a ranges of resources that are allocated in an operation model. It facilitates to find the optimal resource combination using the operation performances such as the amount of emissions, operation completion time, and cost. Lastly, it identifies the best fit probability distribution functions of performance criteria given a certain resource combination. It allows project manager to query the percentages to complete the operation within a limitation specified by the system users.

  • PDF

건설전문기술자의 경영마인드 정립에 관한 연구 (Build up management mind of the construction expert engineer)

  • 전진구;김병수
    • 한국건설관리학회논문집
    • /
    • 제7권3호
    • /
    • pp.45-55
    • /
    • 2006
  • 본 연구는 건설경영자의 경영Mind정립과 합리적 의사결정에 필요한 사고체계 구축에 필요한 논리와 기업경영에서 돌출될 수 있는 외부적 간섭인자를 효과적으로 분석할 수 있는 방향을 제시하는 것이 목적이다. 따라서 경영Mind 정립에 적용되는 간섭인자들이 경영 의사결정에 많은 영향을 주기 때문에 Mind정립과 경영환경에 대한 합리적 접근방법을 제시하고, 시간의 동태성에 따른 환경 요인들을 경영학, 심리학, 철학적 개념에서 논리적 단계로 분석했다. 끝으로 의사결정 요소에 대한 원칙적 한계 및 접근단계와 평가기준을 정립해보았다. 본 연구를 수행한 결과를 다음과 같이 요약해 본다. (1) 경영자의 의사결정 접근방법 (3) 시간의 동태성과 경영Mind (3) 의사결정의 외부 환경적 요인 (4) 경영Mind의 Synergy화 방법 (5) Mind 정립의 기대효과.

건설산업에서의 가치경영 프로세스 효율적 활용 방안 (Optimal Implementation of the Value Management Processes for Capital Facility Projects)

  • Cha, Hee-Sung
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.89-94
    • /
    • 2004
  • Many innovative management processes, which are also termed as best practices or value improving practice, have been proven to successfully improve the value of capital facility projects. With a lack of any guidance on how to implement the most suitable value management process for a particular project, the objective of this paper is to facilitate the VMP implementation. A CII (Construction Industry Institute)'s recent study, titled as 'Development of the Value Management Toolkit,' encompasses a comprehensive structure of value management and provides a new methodology in optimizing the implementation of the value management processes in order to leverage the unique project circumstances, such as project objectives, resource availability, and site limitations, etc. As a pioneering study, the findings contribute to the expedition of implementing value management processes in the industry and maximize the potential benefits in applying the most benefiical value management process for a particular capital facility project.

  • PDF

건축공사의 현장관리 인력에 대한 생산성 분석 (A Productivity Analysis for Management Manpower of Building Construction Projects)

  • 이현민;이동훈;정기;김선국
    • KIEAE Journal
    • /
    • 제10권1호
    • /
    • pp.45-55
    • /
    • 2010
  • While Korean construction companies are adapting themselves to rapidly changing business landscape at home and abroad, intensifying competition among competitors in local as well as global market deteriorates the profitability of construction industry, which leads to another problem. In response to such challenges, many construction companies continue to innovate their business portfolio and organization structure, with strong commitment to business process innovation. Furthermore, they need to analyze the productivity of project site management manpower overhauling business processes systematically and develop effective alternative strategies. This research aims to analyze the productivity of project site management manpower. Current operational practices of construction site organizations have been analyzed with focus on large construction companies in Korea and data gathered from project sites have been analyzed from a wide range of perspectives, In so doing, this research is expected to provide basic inputs for any subsequent attempt to estimate proper resource requirement for site management tasks in construction projects and analyze the management productivity of such resources by enabling construction companies to better understand the current operational status of site organization.

Organizational Transformation Strategies for Adopting Building Information Modeling in the Engineering-Construction Industry

  • Yong Han Ahn;Young Hoon Kwak;Sung Jun Suk
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.94-102
    • /
    • 2013
  • The architecture, engineering and construction (AEC) industry is beginning to utilize Building Information Modeling (BIM), benefiting from the resulting improved visualization and productivity, better coordination of construction drawings, building documents that contain embedded links to virtual information, faster delivery, and lower costs. However, construction firms often face challenges when reorganizing their company structure to take full advantage of these benefits. This paper proposes an organizational structure that will enable engineering-construction firms to successfully adopt and implement BIM for major construction projects. A case study research method is utilized based on in-depth interviews with four BIM directors and vice presidents charged with BIM adoption, implementation and education. Organizational transformation challenges and recommendations are discussed in detail for those considering implementing BIM in the engineering-construction industry. Topics such as organizational changes in the firm, costs and benefits of BIM implementation, strategies of BIM implementation (execution) plan, BIM education, risks and opportunities associated with BIM, BIM software, contract methods, human resource management and new hires, and the future implementation and direction of BIM are discussed in detail.

  • PDF

A Comprehensive Cash Management Model for Construction Projects Using Ant Colony Optimization

  • Mohamed Abdel-Raheem;Maged E. Georgy;Moheeb Ibrahim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.243-251
    • /
    • 2013
  • Cash management is a major concern for all contractors in the construction industry. It is arguable that cash is the most critical resource of all. A contractor needs to secure sufficient funds to navigate the project to the end, while keeping an eye on maximizing profits along the way. Past research attempted to address such topic via developing models to tackle the time-cost tradeoff problem, cash flow forecasting, and cash flow management. Yet, little was done to integrate the three aspects of cash management together. This paper, as such, presents a comprehensive model that integrates the time-cost tradeoff problem, cash flow management, and cash flow forecasting. First, the model determines the project optimal completion time by considering the different alternative construction methods available for executing project activities. Second, it investigates different funding alternatives and proposes a project-level cash management plan. Two funding alternatives are considered; they are borrowing and company own financing. The model was built as a combinatorial optimization model that utilizes ant colony search capabilities. The model also utilizes Microsoft Project software and spreadsheets to maintain an environment that incorporates activities, their durations, and other project data, in order to estimate project completion time and cost. Ant Colony Optimization algorithm was coded as a Macro program using VBA. Finally, an example project was used to test the developed model, where it acted reliably in maximizing the contractor's profit in the test project.

  • PDF

건설공사 현장소장 직무스트레스 측정 시스템 개발 (Development of job stress measurement system for construction field managers)

  • 이태신;양진국;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.121-122
    • /
    • 2022
  • Recently, the scale of construction project is getting bigger compared to previous projects. Therefore, the job stress of the field manager responsible for the construction project is getting more and more intense. Therefore, construction companies should establish a job stress management plan for stable human resource management of the field managers. From this perspective, in this study was developed a job stress measurement system in connection with MBTI personality types. The developed system allows the job stress of the field manager to be judged on a scale from 1 to 9 points. Accordingly, it is expected that construction companies will contribute to the effective management of field managers in the future.

  • PDF

비용$\cdot$일정 통합관리를 이용한 자원소요계획에 관한 연구 (A Study on Material Requirement Planning by Integrating Schedule and Cost)

  • 송영웅;최윤기
    • 한국건설관리학회논문집
    • /
    • 제4권1호
    • /
    • pp.106-113
    • /
    • 2003
  • 건설 프로젝트의 자원관리는 공사원가의 절감, 건축물의 공정 및 품질확보에 직접적으로 관계되어 이외의 공사관리요소와 함께 매우 중요한 요소를 차지하고 있다. 하지만 자원소요계획은 공사초기에 수립되고 고려요소가 다양하여 전사적 차원의 자원소요계획을 수립하기에는 한계가 있고, 관리자간의 정보단절로 실적정보관리가 불가능하다. 건설공사의 유기적 관리를 위해서는 각 관리요소의 체계적 구성이 필요하며, 각 관리간의 사업수행정보와 실적자료의 주기적인 갱신으로 이루어져야 한다. 이에 현장변동상창을 반영하고 효과적인 자원소요계획을 수립하기 위해서는 비용 일정 통합관리의 실적 데이터를 이용하여 자원소요량 산출근거를 명확히 하고, 효율적인 자원소요계획체계를 구성하여야 한다. 본 논문에서는 비용$\cdot$일정 통합관리를 이용한 자원소요량 산출방법을 제시하였으며, 비용$\cdot$일정 통합관리를 이용한 자원 조달관리 업무프로세스를 분석하여 체계적인 자원소요계획 체계를 마련하였다.

위치추적기술을 이용한 BIM기반 건설현장 안전관리 시스템 (A Construction safety management system based on Building Information Modeling and Real-time Locating System)

  • 이현수;이광표;박문서;김현수;이사범
    • 한국건설관리학회논문집
    • /
    • 제10권6호
    • /
    • pp.135-145
    • /
    • 2009
  • 과거 건설공사의 목표는 원가절감과 공기단축을 통한 효율성 증진이었다. 이에 비하여 안전관리는 오랜 기간 동안 소홀히 되어온 것이 사실이다. 하지만 최근 건설 산업 내에서 안전관리로 패러다임 전환이 일어나고 있으며, 이에 따라 안전관리의 중요성이 부각되고 있다. 또한 건설공사가 보다 대형화, 복잡화됨에 따라 사고의 규모가 더욱 더 커지고 있어, 건설현장에서는 보다 확실한 안전관리가 요구되고 있다. 이러한 배경 하에 본 연구는 작업자 중심의 현장 안전관리 시스템을 제안하고자 한다. 시스템 요소기술로는 위치 추적 기술(RTLS-Real Time Locating System), BIM(Building Information Modeling)기반의 모니터링 시스템(BIM Based Monitoring System), 데이터 마트(Data Mart), 알람 기술(Alarm System)이 복합적으로 적용된다. 본 시스템을 통하여 현장에서는 가변적인 상황 및 작업자에 대한 관리가 가능하게 됨으로써 기존의 정적인 관리 형태에서 벗어나 보다 폭 넓은 안전관리가 가능해 질 것이다. 또한 작업자 중심의 안전관리를 통하여 보다 체계적이고, 발전된 형태의 실시간 안전관리를 하고자 한다.