실내건축의 작업환경 개선을 위한 기본적 관리방안에 관한 연구 (A Study on the Environmental Improvement in the Interior Construction Fields with the check-list)

  • 이용의
    • 한국실내디자인학회논문집
    • /
    • 제9호
    • /
    • pp.10-17
    • /
    • 1996
  • With the ever-increasing important of high-speed information in society as we move towards the 21 st century. Interior design and it's working condition has been changed a great deal included a sort of each special character and make a difference against the others. It used to be find a great poles asunder of worker's safety and project quality according to the environmental dimension of interior construction field as if they should be a pleasantness or poor condition. This research aimed to improvement of environmental construction field of interior with construction engineers and particular interior labors in 4 phases as : ⅠThe preparatory phase : -Secure a Budget, Environmental safety supervisor -Fix of Design quality, Construction period. -Choice of Construction method, Sub constructing Ⅱ. Starting work phase ; -Capacity , Safety of temporary power line. -Carriage, Stock of Material -Safety of Electronic tools, -Personal protector. Ⅲ. Working period ; -Ventilation, I illumination of working place. -Measurement of environmental working condition Ⅳ.Finish working phase ; -Analysis of measurement data. -Evaluation and making up for the weak point. -Keeping data.

  • PDF

친환경적 설계인자를 적용한 생태복원공사의 시공성 평가 - 거제시 구천천 생태하천 조성공사를 중심으로 - (The Constructability Evaluation of Ecological Restoration Construction Using Environment-friendly Design Factor - In the case of Construction of Gucheon Eco-River in Geoge City -)

  • 안병철
    • 한국환경복원기술학회지
    • /
    • 제16권4호
    • /
    • pp.99-114
    • /
    • 2013
  • In this study, constructability of ecologocal stream restoration process was evaluated and improved approaches for habitat were suggested. The study site is Gucheon River in Geoje city where conducted ecologocal restoration work within maintaining its flood control function. Application of ecological design factors and constructability in the process from planning to construction was analyzed and its results are as follows: In the process of planning and designing, it was focused more on the naturality of Gucheon River rather than the human convinience and ecological design factors were applied within the ecological capacity of the site. First, the indexes for constructability evaluation is selected. It was classified into three major categories as construction quality, design quality and construction administration system. Each index has details, so there are twenty sub indexes for contractibility evaluation. Second, the evaluation results shows that the index most in need of improvement was plumbing construction, followed by Stone construction and pavement construction. design concept was evaluated as appropriate in entire categories. Finally it is suggested that it can be improved in both process of design to enhance the technology and process of construction to enhance the quality management. The constructability of ecological stream needs adaptive management and it must be discussed with its designing which is at the stage before construction. Also it needs discussion with its designer constantly and feed-back process.

건설공사 안전관리 및 시공 업무의 중요도 분석에 관한 연구 (Analysis of Construction Safety Management and Execution Tasks for Performance Improvement)

  • 강상훈;김대영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 추계 학술논문 발표대회
    • /
    • pp.130-131
    • /
    • 2018
  • The main purpose of this study is to analyze the importance of the construction work of apartment buildings. The construction work operation was divided into five major tasks, which include: Schedule Control (P'1 - P5) Construction Management (C'1 - C'5), Environmental Management (E'1 - E'3), and Quality Management. Finally, this study derived major construction execution tasks through correlation between construction work and the original index and t-test.

  • PDF

건설산업 공공데이터 개방의 현황과 과제 (The Current Status and Problems of Open Government Data on the Construction Sector and Its Improvement Plan)

  • 김성환;최석인;유위성
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.219-220
    • /
    • 2022
  • In order to meet the trend, construction public data are already disclosing not only data generated at the construction site but also various data ranging from inspection reports and public construction contracts through multiple portals. However, unlike the excellence of the open performance evaluated by the number of data, it is difficult to evaluate the specific level of disclosure because there is no case of analyzing the quality, ease of use, and possibility of further opening of the public construction data set. On the other hand, performance measurement is already performed using an internationally agreed evaluation method in different fields such as real estate, population, and environment. So it is essential to analyze the current status of public data openings in the construction field and to derive improvement tasks. Therefore, this study conducted a survey of researchers with the highest system utilization targeting representative public data open systems in the construction field, such as E-AIS(세움터) and KISCON. To ensure fairness and increase comparability, the questionnaire was composed using evaluation items on implementing public data conducted annually by the World Wide Web Foundation, an international non-profit organization. With these responses, we investigated the status of public data disclosure and opinions on data quality and derived tasks to improve public data disclosure in construction through the analysis of the results.

  • PDF

SAFETY MANAGEMENT ON CONSTRUCTION MANAGEMENT: A CASE STUDY REVIEW

  • Eric Chan
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.249-255
    • /
    • 2011
  • Poor safety management in construction management may adversely affect cost, schedule and quality of a project. Heavy fines upon safety offence becomes a burden to the budget; losing working hours as a result of safety incident impacts on the schedule, and compromising quality is always an indirect consequence when workers perform duties in an unsafe site environment. Therefore, promotion of safety management becomes the top priority in any construction manager's agenda. Working safely will benefit construction project and lead to a "real" success. This paper is a case study, based upon "Geller's 10 principles for achieving a total safety culture", reviewing how a Hong Kong leading construction company fosters the safety culture and possesses a pleasant safety record over years. Its safety performance is not only well ahead the local industry, but also ranges top within the Asia Pacific region and comparable to those mature Western industries. The review concluded that safety culture is one of the major components in construction management and collaboration is the essence to realize this positive culture within an organization. Safety management is not merely a "top down" approach, but requires the positive "bottom up" actions from the other end. The successful story of this company can demonstrate the contribution of safety management in construction management.

  • PDF

맞춤형 테트라블록을 이용한 야계사방공작물이 계류생태계에 미치는 영향 (Influences of the Construction of the Torrent Control Structure Using Customized Tetrapods on the Stream Water Ecology at Valley)

  • 박재현;마호섭;김기흥
    • 한국산림과학회지
    • /
    • 제101권1호
    • /
    • pp.113-120
    • /
    • 2012
  • 이 연구는 경상남도 산청군 홍계 계곡에 설치한 맞춤형 테트라블록을 이용한 야계사방공작물의 설치 전 후의 계류수질, 어류, 수서생물 등 계류생태계의 변화를 밝힘으로써 산림내 계류수질 보전 및 관리방안 마련을 위한 기초 자료를 제공하기 위하여 수행하였다. 연구결과, 맞춤형 테트라블록을 이용한 야계사방공작물은 시공 후 2년이 경과한 뒤에도 계류수의 pH는 하천수질환경기준 상수원수 1급수의 범위 내였다. 맞춤형 테트라블록을 이용한 야계사방공작물의 시공 후 2년이 경과하는 동안 계류수의 용존산소량은 거의 변화하지 않았으며, 전기전도도는 오염원이 없는 맑고 깨끗한 일반적인 계류수에서의 전기전도도의 범위 내에 포함되었다. 맞춤형 테트라블록을 이용한 야계사방공작물은 어류 및 다슬기가 소상하는데 아무런 영향을 주지 않은 것으로 나타났다. 아울러 맞춤형 테트라블록을 이용한 야계사방공작물을 설치한 계류수는 오염되지 않은 일반적인 계류수질과 유사하고 어류 및 다슬기의 소상에 영향하지 않아, 이러한 야계사방공작물 설치에 따른 계류수질 오염 및 계류생태계의 영향은 나타나지 않은 것으로 분석되었다.

모바일 BIM기반 현장 감리업무 지원도구 - 품질관리업무를 중심으로 - (On-site Quality Control Support Tools Based on Mobile BIM - Focusing on Quality Management Work -)

  • 송경욱;유정호;김경
    • 한국건설관리학회논문집
    • /
    • 제21권6호
    • /
    • pp.27-37
    • /
    • 2020
  • 본 연구에서는 현장 품질관리 업무에서 나타나는 문제들을 해소하기 위해 모바일 BIM기반 품질관리 지원도구를 개발하였다. 본 연구의 도구를 개발하기 위해 국내 품질관리 업무의 절차를 분석하고 존재하는 문제를 해결하기 위해 12개 기능을 도출하여 공종별체크리스트와 BIM모델 객체 매핑과정을 수행하였다. 그리고 도구 유용성 설문조사를 통해 개발된 도구가 품질관리업무에 존재하는 문제를 해결할 수 있다고 확인하였다.

국내외 BIM가이드 분석을 통한 BIM 품질관리기준의 제안 (Proposal of BIM Quality Management Standard by Analyzing Domestic and International BIM Guides)

  • 권오철;조찬원
    • 한국건축시공학회지
    • /
    • 제11권3호
    • /
    • pp.265-275
    • /
    • 2011
  • 건설 산업에서 BIM의 도입과 활용이 증가하면서 BIM모델의 작성과 관리, 납품, 품질검토 등에 대한 요구가 늘어나고 있다. 이를 위해서는 BIM과 관련된 각종 지침이나 기준, 매뉴얼, 가이드라인 등의 개발과 보급, 확산 등이 필요한 상황이다. 또한 BIM을 활용한 발주가 증가함에 따라 BIM모델에 대한 품질의 검증과 평가의 정량화에 대한 요구가 증대되고 있다, 이에 본 논문에서는 BIM의 품질에 대한 정의와 특징을 이해하고 BIM기준에 대한 국내외 현황을 파악하였으며, 특히 BIM의 품질과 관련된 내용을 중점적으로 조사, 분석함으로써 향후 BIM의 품질을 관리하는데 필요한 최소한의 기준을 설정하였다.

저속습식마쇄기를 이용한 고품질 순환잔골재 제조에 관한 기초적 연구 (A Fundamental Study on Manufacturing Condition the High Quality Recycled Fine Aggregate by Low Speed Wet Rotary Mill)

  • 김하석;이경현;라정민;박효진;임대빈;김진만
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.65-68
    • /
    • 2009
  • Recycled aggregate by the recycling construction waste has a lot of advantage such as the developing the alternative resource and protecting of environment. However, recycled aggregate is used as the low quality grade, because the technic to remove old mortar from aggregate is low level. To use the recycled aggregate as high quality grade, it is important to develop the technic to produce the high quality recycled aggregate. To manufacture the high quality recycled aggregate, old mortar attached on the aggregates should remove efficiently. Therefore, in this study, we suggested the optimum condition to remove old mortar effectively using sulfuric acid and low speed wet rotary mill for high quality recycled fine aggregate. The results shows that the recycled aggregate satisfy on the standards of KS F 2573 in density, absorption and solid volume when, adequate condition of sulfuric mole ratio and aggregate ratio are make.

  • PDF