• Title/Summary/Keyword: Construction Quality

Search Result 4,686, Processing Time 0.031 seconds

The Establishing of the Self-regulation System for Quality and Safety Management (현장(現場) 자율(自律) 품질안전관리(品質安全管理) 시스템 구축(構築))

  • Baik, In-Whee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.81-87
    • /
    • 2007
  • PMIS (Project Management Information System) has been applied in the R4-PROJECT This construction project has been controlled and managed by PMIS for the whole process of project. Moreover, this PMIS is updated to the Self-regulation System for Quality and Safety Management which is integrated and developed from PMIS in R4-PROJECT. So, The Self-regulation System for Quality and Safety Management has been delivering effective communication and information distribution with various stakeholders related to project and also brought the achievement of efficient construction management. As the system is successfully utilize, the satisfaction of costumer request and the performance of no accident for 550 million hours could be attained.

  • PDF

A Study on the Analysis of Current Situation and the Deduction of Improvement Measure Regarding the Scaffolding and the Related Components at Construction Site (건설 현장 가설기자재 운영현황 분석 및 개선 방안 도출 연구)

  • Jeong, Jin Woo;Kim, Yong Gon
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.5
    • /
    • pp.63-71
    • /
    • 2019
  • Work Guideline of Construction Quality Management was revised in July 2017, and it has changed the perception of scaffolding in South Korea. The on site investigation and survey was performed on manufacturers, leasing companies, and quality inspection agencies regarding the compliance with the guideline for the scaffolding and the related components brought to the site. Moreover, the related guidelines and identified unsatisfactory quality management items were analyzed by each subject. As a result, the major factors that cause the problems were reasonably deducted. The related regulations to prohibit the delivery of faulty scaffolding components to the construction site in order to secure the safety of the temporary structure was suggested.

Construction Company TQM Impact on the Activities Performance (건설회사 TQM 활동이 성과에 미치는 영향)

  • Kim, Ja-Yeon;Kang, In-Won
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.319-330
    • /
    • 2015
  • This study examines the factors configuration management quality of the construction company, and to analyze the impact of these factors on Project Performance and Company Performance. That quality construction management configuration factors, chief executives, corporate strategy, organizational management, information technology, and partners five variables, Project Performance variables, process management, quality management, cost management, safety management, environmental management five variables, and Company Performance parameters of financial competence and organizational satisfaction, quality of work three variables, the overall causal relationship between the presence of specific activities and management quality, classified according to the size of the company were verified by the difference in impact between the two groups.

Development of Sliding Roof System for High-rise Construction Factory Using Quality Function Deployment (품질기능전개를 이용한 고층건물 건설공장 구조체의 개폐식 지붕 시스템 개발)

  • Kim, Chang-Won;Kim, Baek-Joong;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.131-132
    • /
    • 2011
  • Non-working days owing to climatic factors have been negatively affected in productivity of construction, such as delays of project completion times, decrease productivity of construction. Especially non-working days of steel erection work is about 58 days, it is influenced deleteriously to estimating uncertain construction duration. To solve this problem, Construction Factory(CF) and sliding roof system installed CF's upper side are developed in korea recently. This study is proposed the design of sliding roof system through assess relation of requirements and technical characteristics using Quality Function Deployment(QFD). The basis data for applying QFD is collected from literature reviews and questionnaires/interviews targeting system developer, experts and researchers.

  • PDF

A Study on the Selection of Waterproofing Construction Firms using Fuzzy-AHP Model (퍼지 계층분석 모형을 이용한 최적 방수 시공업체 선정에 관한 연구)

  • Shin, Jin-Hak;Lee, Sun-Gyu;Song, Je-Young;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.11-14
    • /
    • 2012
  • The category for waterproofing is one of construction process most affected by falling-off in price competitiveness, construction quality, and material performance. Therefore, in order to select of waterproofing construction firms, it is necessary to consider Incorporating both price competitiveness and construction quality. In this article, I would like to analyze 10 Factors for Selecting using fuzzy-AHP model, including the survey of the waterproofing experts. This fuzzy-AHP model can be shown to calculate the fuzzy trigonometrical function to reflect weights for preference of 10 factors for the waterproofing construction firms. It was found from the result that waterproofing construction firms was searched order of priority for select by fuzzy-AHP model.

  • PDF

PERFORMANCE EVALUATION INDEX FOR COMPARING TRADITIONAL CONSTRUCTION METHODS WITH A ROBOT-BASED AUTOMATED CONSTRUCTION METHOD

  • Donguk Oh;Younghoon Lee;Ung-Kyun Lee;Nakju Lett Doh;Hunhee Cho;Kyung-In Kang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1088-1093
    • /
    • 2009
  • To improve construction productivity and quality, and to make the construction environment safe, a new system, Robot-based Construction Automation (RCA), is currently being developed in Korea. To determine whether RCA is an improvement over traditional construction methods (TCMs), an evaluation method, called the Performance Evaluation Index (PEI), is suggested for RCA. The PEI considers the relationships among the factors influencing the performance of the system obtained using the Delphi method and the analytic hierarchy process (AHP). As the evaluation shows, RCA is much better than TCM except for three factors: the rate of work success, quality improvement by learning experience, and construction duration.

  • PDF

The Present Status of Quality Management Information System in Domestic General Contractors (국내 종합 건설회사의 품질관리 정보시스템 동향 분석 -국내 6개사의 사례를 중심으로-)

  • Do Young-Suk;Baek Jong-Kun;Kim Jae-Joon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.137-145
    • /
    • 2004
  • Owing to the growth of Information Technology, some of big general contractors have been interested in the development of Quality Management Information Systems to integrate the information of quality in planning, design, procurement, construction, and maintenance phases, and tried to maximize the usefulness of it. But the trend has confined only to some big general contractors. The purpose of this paper is to put together and analyze the character of Quality Management Information Systems of big general construction companies and classfy them into a result-focused system and a process-focused system in order to provide primary information for both of development and adoption of the systems.

A Study on Construction and Quality in accordance with the Field Application of Hwangto Concrete (황토콘크리트의 현장적용에 따른 시공 및 품질 특성에 관한 연구)

  • Hwang, Hey Zoo;Moon, Je Chun;Kang, Nam Yi
    • KIEAE Journal
    • /
    • v.9 no.1
    • /
    • pp.91-97
    • /
    • 2009
  • In this thesis presents the application to the field of Hwangto-used concrete highlighted as an eco-friendly material and performs an experiment in the aspect of construction and quality on the construction for all parts of buildings, rather than for some parts of buildings as shown from existing application and got the conclusion as followings. 1) It was turned out that Hwangto concrete showed lower hydrated heat and arid contraction comparing to those of cement concrete. And this phenomenon is judged to appear high when applied to mass building and huge span structures. 2) The construction of Hwangto concrete is judged to be possible in applying to constructions since the mechanical construction seems to be possible by using pump car and ready-mixed concrete which are used at the practical sites at the moment. 3) The pockmarks appearing on the exposure surface were about 2% of total area. This has great cohesion by Hwangto concrete but is judged that it will be improved through enough vibration stamping. Through the experiments of quality and construction of Hwangto concrete as environment-friendly construction materials, it is possible to judge modernized application of Hwangto concrete. It is in need of more studies about economical efficiency, structural stability, design application, etc. afterwards.

Analysis of the Causes of Defects in Fenestration Construction and Their Impacts on Construction Quality - Focused on Door Hardware - (창호철물공사 하자발생 원인과 시공품질 영향분석에 관한 연구 - 문(Door)에 사용되는 창호철물 중심으로 -)

  • Moon, Sang-Deok;Chung, Jae-Min;Ock, Jong-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.341-350
    • /
    • 2013
  • For this study, a series of interviews with engineers in the Korean construction industry was carried out through a formal workshop format to analyze the causes of the inferior quality of builders' hardware. The authors established the causes of defects in window hardware construction in relation to the three aspects of system, design, and construction as involving the following seven factors: lack of system (including low ability to create construction specifications); low social awareness of the importance of window hardware; low technical capability to create design drawings; low design costs; small manufacturing capacity; low construction cost; and short duration of construction. Among the seven causes, the biggest cause of defects in window hardware construction is the lack of a system (low ability to create construction specifications), followed by low technical capability to create design drawings. In addition, this study carried out basic research to create measures to prevent defects in window hardware construction by analyzing how such causes of defects are distributed depending on the scale of architectural firms and construction companies during actual projects.

Camber Management of Continuous Preflex Girder Bridges (연속형 프리플렉스 합성거더 교량의 캠버 관리)

  • Kim, Jong-In;Choi, Young-Wha
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.7 no.4
    • /
    • pp.433-441
    • /
    • 2004
  • This paper presents a strategy for the quality assurance of the continuous preflex composite girder bridge through the camber management of the girder during construction. The construction stages which require welding, balanced preflexion loads at the ends, etc. may cause unexpected large deformation to the preflex girder. Furthermore, these defects can be detected by measurements and analyses of the girder behavior which is sometimes time consuming. In the present study, preflex girder's camber data at equally spaced nodes in each construction stage are obtained and analyzed for the quality control of thee span continuous preflex girder composite bridge.

  • PDF