• Title/Summary/Keyword: Construction Project

Search Result 5,545, Processing Time 0.035 seconds

Application of Construction Management techniques in Small Construction Projects (소규모 프로젝트의 효율적인 공사관리방안)

  • Lee, Sang-Beom;Lee, Dong-Un
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.4
    • /
    • pp.95-102
    • /
    • 2003
  • A construction project's period is limited by the order manufacture. And a construction project is requested a specific place, and has the characteristic to be irregular. Today, construction is to be representative high-cost and low-efficiency. This kind of problems appears in small construction projects more often than large construction projects. According to this facts, we recognized necessity of making practical application in methods of construction management. Also, we suggest application and establishment of integrated responsibility management department, PMIS(Project Management Information System) and Data Base. From now on, methods of construction management could be good opportunities for small construction projects and local construction companies. Therefore, small and local construction companies should try to improve their abilities. Likewise, the countries systematize to constitute the relation laws.

Case Study of Local Government Homepage for Integrated Construction Information Management (건설정보공유를 위한 정부기관 통합 홈페이지 구축사례 연구)

  • Kang, Leen-Seok;Lee, Hong-Gi;Kim, Hyun-Soo;Kwon, Jung-Hui
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.563-566
    • /
    • 2006
  • Generally, integrated information of construction project is managed by government. However, homepage cases for operating each construction project by government are still unusual in the construction site. This study introduces a case study of construction project homepage for the integrated project information, and then suggests an improved functions that need in homepage for using construction information in common in local area. The homepage used in the study is operated by Gyeongsangnam-do. The results can be used as improved contents of construction project homepage by local government.

  • PDF

TOTAL RISK INDEX FOR ASSESSING RISK LEVELS OF OVERSEAS CONSTRUCTION PROJECTS

  • Du Yon Kim;Seung Heon Han;Heedae Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1414-1418
    • /
    • 2009
  • International construction projects typically manifest difficult, complex, and varied types of risk exposures; because of this, there is a need for accurate evaluation of risk-integrated performances during the timeframe of project execution. Given the financial crisis currently affecting the world economy recession, risk management has become a more crucial part for the success of international project management. However, the majority of risk management approaches, particularly for overseas projects, are focused primarily on simple forms of checklists, formalization of risk variables affecting project performance for a specific phase, or more complicated computational methods that restricting practical utilization in real-world projects; moreover, these methods lack the conceptual basis to broadly visualize the level of risk over all phases of a project. This study suggests an efficient, yet simple risk-integrated total index to successfully assess the risk levels of overseas construction projects. To this end, this paper first investigates the life cycles and key processes of decision-making for a given project and then derives formulas to represent the total risk index (TRI) along the key decision-making processes. In addition, the study examines the relationships between TRI and performance levels based on the analysis of 126 real-world project samples. Validations using the proposed TRI showed a high correlation to project performance, signifying the usefulness of the proposed approach for construction firms when investigating the level of risks and key areas for management focus.

  • PDF

Analysis of the Impact of Enterprise Risk Management (ERM) on the Project Success through PRM Process: Focused on the Overseas Construction Projects (전사적 리스크 관리(ERM)가 프로젝트 리스크 관리(PRM) 향상을 통해 프로젝트 성과에 미치는 영향 분석: 해외 건설사업을 중심으로)

  • Sullim Jung;Seung-Chul Kim;Dae-Cheol Kim
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.47 no.2
    • /
    • pp.93-106
    • /
    • 2024
  • As the complexity and uncertainty of international construction projects increase, the importance of risk management capabilities in the construction industry has become more pronounced. Accordingly, Enterprise Risk Management (ERM) has become a widely adopted approach among organizations as a new way for more effective risk management. Despite its growing application, research related to ERM is still in its infancy, and most of the existing studies have been limited to financial industries. Therefore, this study aims to empirically examine the influence of ERM's core elements on project risk management (PRM) and project performance within construction firms. Our findings indicate that the key ERM components-organization, policy, and culture-significantly enhance PRM processes, underscoring their critical role and importance. Additionally, effective PRM positively affects project outcomes, highlighting its significance for construction companies engaged in international projects. While ERM does not directly impact project performance, it indirectly improves outcomes through enhanced PRM capabilities. It suggests that ERM will contribute to the firm's performance by improving the firm's PRM capability through policies and a risk-focused culture corresponding to the adopted ERM organization and system..

MEASURING AND COMPARING PROFIT PATTERNS OF TRADITIONAL CONSTRUCTION COMPANIES EXTENDING TO HIGH-TECH CONSTRUCTION

  • Jieh-Haur Chen;Chung-Fah Huang;S. C. Hsu
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.360-365
    • /
    • 2005
  • The need of constructing high-tech facilities is one of the important issues concerning the competitiveness by the high-tech companies. It, simultaneously, offers a magnificent opportunity for construction participants. Nevertheless, the high-tech construction is experience-based, resulting in little related construction knowledge that has been statistically analyzed and documented. This study measures and confers with the profit patterns causing the disparity between the traditional and high-tech construction. The database was the result of collecting detailed information of 65 construction projects from eight construction companies, including detailed records of over 20 main construction operations in each project. All of these were performed during the recent 10 years and encompassed in the project types of the high-tech construction, residential building, and commercial building. Rendering suggestions regarding profit management and expecting to economize cost of learning from inexperience while extending to the high-tech construction were both presented.

  • PDF

Factors Affecting the Work Motivation of the Construction Project Manager

  • PHAN, Phuong Thanh;PHAM, Cuong Phu;TRAN, Nhu Thi Quynh;LE, Hang Thi Thu;NGUYEN, Hanh Thi Hong;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.12
    • /
    • pp.1035-1043
    • /
    • 2020
  • Project manager plays a very important role in the success of any project. The primary duty of the project manager is to combine the outcomes or results of the various processes and activities of project management into a systematic project management strategy or plan for the project. In the construction industry, a lack of motivation is an urgent problem for many project managers in construction and engineering projects. Lack of motivation affects the quality and productivity of jobs, reducing profits and growth for companies, businesses, contractors or organizations that rely on human resources. The reasons for this lack of motivation are diverse ranging from salary to culture to life and working environment, among others. Through surveys and data analysis using Cronbach's Alpha reliability and EFA (Exploratory Factor Analysis), our research scaled the factors affecting work motivation of project managers in the construction industry in Vietnam. The research results identified six major groups of relevant factors including (i) salary and benefits, (ii) work environment, (iii) promotion opportunities, (iv) organizational culture, (v) interest in the job, and (vi) relationship with the organization. From there, this paper contributed useful information as well as measures for businesses, companies, contractors or organizations in the construction industry.

Earned Value based Construction Project Control System (Earned Value 기반 프로젝트 관리체계 및 사례연구)

  • Lee Yoo-Seob;Cho Chang-Yon;Oh Kyu-Hoan;Kim Jung-Hun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.123-130
    • /
    • 2002
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

  • PDF

Earned Value based Construction Project Control System (EV기반 공사관리시스템 기능의 비교분석 연구)

  • Lee Yoo-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.168-174
    • /
    • 2004
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

Perception Based Definition of Construction Quality in Pakistan

  • Awan, Muhammad Yousaf Sadiq;Awan, Dr Muhammad Maqbool Sadiq
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.24-34
    • /
    • 2015
  • The complexity arises in defining the construction quality due to its perception, based on inherent market conditions and their requirements, the diversified stakeholders itself and their desired output. A quantitative survey based approach was adopted in this constructive study. A questionnaire based survey was conducted, for the assessment of construction quality perception and expectations in the context of quality improvement technique. The survey feedback of professionals, from the leading construction organizations/companies of Pakistan were analyzed. The financial capacity, organizational structure, and construction experience of the construction firms formed basis for their selection. After statistical analysis of survey feedback it was found reliable and valid for the inferential purpose to the target population of construction professionals. The quality perception was found to be project scope oriented, considered as an excess cost for a construction project and keeping the rework minimum by qualifying the required quality tests, keeping the defects minimum by ensuring the specifications of supplied material. Any quality improvement technique was expected to address the financial aspects of the construction project for the employer and contractor, by increasing the profitability through reduction in overall cost, reduction in time, reduction in defects and improving the productivity in a construction project. The study is beneficial for the construction professionals to assess the prevailing construction quality perception and the expectations from implementation of any quality improvement technique in construction projects.

A Study on the Prediction Model of Total Construction Period according to the Type of Machine Learning Regression (머신러닝 회귀분석 유형에 따른 총 공사기간 예측 모델에 관한 연구)

  • Kang, Yun-Ho;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.361-362
    • /
    • 2023
  • In construction work, there is often a difference between the estimated construction period and the actual construction period. Accordingly, the project may be delayed from the scheduled date, leading to huge losses due to problems such as increased costs during construction. In this way, it is important to calculate the appropriate construction period at the project planning stage in construction work. To solve this problem, we would like to study a model that will increase the accuracy of the scheduled construction period at the project planning stage. This study compared and analyzed linear regression, Lasso regression, Ridge regression among the types of regression analysis to select an appropriate construction period prediction model to secure an appropriate construction period at the project planning stage to reduce problems during construction.

  • PDF