• Title/Summary/Keyword: Construction Processes Improvement

Search Result 137, Processing Time 0.029 seconds

A CONSTRUCTION PROCESS IMPROVEMENT MODEL USING CONSTRUCTION FAILURE INFORMATION

  • Yongseok Jeon;Chansik Park
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1065-1069
    • /
    • 2005
  • The construction failures can be decreased through continuous improvement of construction process based upon the information of construction failures. Herein, the information of construction failures can be utilized as the key factor for identifying and enhancing various ineffective construction processes that can prevent failures. This research proposes a process model for the continuous improvement of construction processes by using construction failure information. Extensive reviews and analyses of literatures related to construction failures are performed to investigate its definition, type, cause, and lessons learned. This research adapts process modeling methodology and case-based reasoning for the development of the proposed CIMCP(continuous improvement model of construction process), and then suggests its framework that contains modules of case retrieval, case index, and case adaptation.

  • PDF

A Study on the Improving Construction Processes through the Cooperative Design (협력설계를 통한 건설 프로세스 개선 방안)

  • Na Kyung-Chul;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.144-156
    • /
    • 2001
  • This study aims at improving the limitations of current construction processes. Previous solutions to improve construction processes have been focused on the improvement of local processes. This paper proposes a method to improve global effectiveness of construction processes through ascertainment of communication among the process participants. This paper provides two case studies: Deck plate installation processes and Duct installation processes. The case study illustrates a way to improve global effectiveness by incorporating downstream participants such as specialty contractors in upstream construction processes such as design and planning.

  • PDF

Diagnosing communication management using SW-CMM concept (SW-CMM 개념을 활용한 의사전달관리의 진단)

  • Lee, Seon-Gi;Park, Jeong-Ha
    • 시스템엔지니어링워크숍
    • /
    • s.1
    • /
    • pp.15-20
    • /
    • 2003
  • Construction industry recognizes the necessity to manage is business from viewpoint of processes, and consider developing, evaluating and improving standard processes as important managerial target. SW-CMM provides basic framework for this process management. However, appropriate tailoring and adjustment are essential for SW-CMM concept to be applied to construction business. SW-CMM makes construction manager understand the capability of business process, based on which the priority of process improvement is judged. The capability is prescribed by common features. This paper introduces the basic frame for diagnosing construction business processes with SW-CMM, and presents the case study of analysing processes focusing on communication management.

  • PDF

A Study on the Improvement of Processes of Verification for Construction Firm's Records of Performance (건설공사 실적증명 프로세스 개선에 관한 연구)

  • Lee Hong-Jae;Cheon Bong-Gi;Kim Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.369-372
    • /
    • 2001
  • The processes for verification of performance records in construction have many problems according to construction firm's participating in some of the processes. This study analyzed about current processes and provided improved processes with IDEF method. As the result of this study, it was found that 'As-Is' model has many repetition of activities and 'To-Be' model has three times more effective than 'As-Is' model has. The data modeling which is available for 'To-Be' model was also suggested.

  • PDF

A Study on the Improvement of Management of Historical Data in Construction (건설공사 실적관리 개선에 관한 연구)

  • Cheon Bong-Gi
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.107-113
    • /
    • 2002
  • The processes for management of historical data in construction have many problems according to construction firm$^{\circ}{\phi}$s participating in some of the processes. This study analyzed about current process and provided improved processes with IDEF method and simulation. The proposed $\lceil$To-Be$\rfloor$ model is more effective than $\lceil$As-Is$\rfloor$ model according to the result of simulation performance. It is revealed that the productivity in the construction company is more improved than that of the owner from the results of the system simulation.

Analysis of Quality Improvement Priority for Construction PMIS

  • An, Hyo-Kyung;Lee, Seul-Ki;Lee, Hyoung-Lak;Yu, Jung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.10-21
    • /
    • 2012
  • As one of the key IT applications, the project management information system (PMIS) played a significant role in construction management processes in Korea. On increasing use of PMIS, regular quality assessment to identify user's requirements of PMIS is necessary. However, there have been rare research efforts for quality assessment for the construction PMIS. This paper aims to propose a priority index of quality improvement for construction PMIS using the importance and satisfaction measures and to verify the discrimination power of the priority index by comparing it with other quality improvement priority index. In addition, this paper discusses some possible ways of PMIS quality improvement. The analysis of quality improvement priority was based on a questionnaire responded by 253 PMIS users (construction managers and constructors). The methods of PMIS improvement were based on the interviews with eight experts. These findings would be the foundation of further researches on PMIS quality improvement. However, more efforts are required to enhance the priority index, in terms of reflecting weighted values of quality assessment factors.

A Framework of Function Analysis for the Construction Robotics Design

  • Yi, Chang-Yong;Park, Young-Jun;Park, Jin-Young;Park, Chan-Young;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.370-374
    • /
    • 2022
  • Construction is a labor-intensive industry that heavily relies on skilled construction workers. However, the aging of the workforce is rapidly growing, and the shortage of skilled workers is intensifying. The application of construction robotics technology can solve the problem of workforce shortage and guarantee construction productivity, safety, and quality improvement. This study presents a framework of the functional analysis for construction processes and work tasks that classifies and analyzes processes and work tasks for construction robotics design. The framework presents the functional analysis process, which analyzes workers' attributes and identifies functions of construction robotics.

  • PDF

A FRAMEWORK FOR SIMULATING CONSTRUCTION PROCESSES FOR OPTIMIZING THE FLOOR CONSTRUCTION CYCLE USING BIM

  • Seung-Jun Ahn;Hyun-Soo Lee;Moonseo Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.835-840
    • /
    • 2009
  • Lately, Building Information Modeling (BIM) emerges as the most promising technology, now is expected to bring a great deal of improvement of productivity in every aspect of the construction industry. One of the BIM based scheduling is to use BIM model as a base for applying to schedule analysis and simulation tools. This type of tools may incorporate a various types of information such as the building model, construction method information, resource information, productivity information, rules and constraints to optimize activity sequencing. This paper proposes a framework of BIM based simulating system which can be used to optimize construction processes, especially for the floor construction cycle. For the purpose, all of the necessary components of the system will be defined and represented, and next an algorithm will be introduced to demonstrate the principle of simulating operation. The benefits of this technique are basically two : to test and optimize construction methods in respect of the construction duration and to reduce the floor construction cycle.

  • PDF

CONCEPTUAL MODEL OF RFID APPLICATION IN PREFABRICATION INSTALLATION PROCESS

  • V. Peansupap;T. Tongthong;B. Hasiholan
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.279-288
    • /
    • 2007
  • Attempts to achieve a higher productivity have led studies to focus on process improvement. Information has been found as an essential element for process improvement. This research has introduced and focused on two types of information, namely: related jobsite information along the process and feedback information. Related jobsite information along the process which needs to be processed and delivered in a timely manner, accurate, and real time is required to streamline the decision making process. Whereas feedback information about process' current practices which have to be captured and stored is a useful for continuous improvement in identifying the problem origin and determining corrective action. In the current practices, although these two types of information are essential for process improvement, construction process has faced barriers in obtaining that information. Therefore, this research will propose a new information system to overcome the aforementioned barriers. The new information system consists of RFID as an automatic identification and data collection device integrated with database to support construction processes. The new system attempts to provide related jobsite information along the process and feedback information to support decision making process and continuous process improvement respectively. A case study of prefabrication installation process in housing projects has been selected to be implemented in conceptual model of RFID application in construction industry. Conceptual model will be presented in this paper as an initial stage of this ongoing research. Expected outcomes of the new system and future works will be discussed briefly.

  • PDF

Development of Standard Estimates for Garden Construction: Focused on Planting

  • Hong, Kwang-Pyo;Lee, Hyukjae
    • Journal of People, Plants, and Environment
    • /
    • v.22 no.5
    • /
    • pp.467-480
    • /
    • 2019
  • Standard estimates are the numerical data of a unit quantity required for construction work such as the amount of materials, manpower, and the use of equipment required and are also a basis to calculate construction costs. Unfortunately, standard estimates for construction have also been used for garden construction these days as no standard estimates for garden construction have been developed or documented until now. As a result, many problems have arisen at garden construction sites since landscape construction and garden construction differ in terms of scope, size, design and construction methods. The purpose of this study was to develop standard estimates for garden construction for proper calculation of the cost of garden construction and to ensure gardens are created following appropriate construction processes. In order to develop standard estimates for garden construction, a preliminary survey was conducted on experts to understand current issues at first. After that, a questionnaire survey was done to examine problems of construction processes and ways of improvement, and on-site inspections were conducted utilizing CCTVs at construction sites to identify the actual amount of manpower required on site. Based on the results of the surveys and on-site inspections, a draft version of standard estimates for 5 types of planting work for garden construction was developed. Developing standard estimates for garden construction will serve as a stepping stone for the transparent and proper compensation for garden construction work, which will not only contribute to addressing issues between consumers and construction companies, but also to the stabilization of market economy and job creation.