• Title/Summary/Keyword: Construction Processes

Search Result 1,309, Processing Time 0.027 seconds

A Study on IDM Development for Automation of BIM-based Architectural Facade Design - Focused on Musical Proportion - (BIM기반 건축 파사드 디자인 자동화를 위한 IDM 개발에 관한 연구 - 음계비례를 중심으로 -)

  • Heo, Kyu-Souk;Choo, Seung-Yeon
    • Korean Journal of Computational Design and Engineering
    • /
    • v.15 no.5
    • /
    • pp.393-402
    • /
    • 2010
  • Existing construction industry is composed of several processes with various characteristics. The tendency of current construction industry is getting complicated and diversified; it has limitation to solve problems through existing processes. As a problem-solving method, BIM (Building Information Modeling), environment to manage building life cycle from design and construction to management, is being suggested. Currently, BIM is only focused on technology development by engineers, and the automation of architectural theories is insufficiency except architectural design modeling. Therefore, this research aims to back up theses drawbacks through intellectual curtain wall arrangement by using musical proportions. In order to apply to construction automation, analysised of musical proportions method are performed. The BPMN-based Process Map is listed to develop IDM for the application to BIM Software.

A Case on Application of the PMBOK(Project Management Body of Knowledge) Guide in Nuclear Power Plant Architect Engineering (PMBOK Guide 지식영역 적용 사례 -원전종합설계를 중심으로-)

  • Im, Jae-Min;Kim, Seong-Su
    • Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.41-45
    • /
    • 2012
  • Nowadays the Project Management is increasingly adapted into almost all the fields in business management processes among leading companies both in Korea and overseas. However its actual practices are rare to be found. Among the Project Life Cycle, this report covers the real cases of the PMBOK knowledge areas in NPP Architect Engineering. The areas of the Construction, Start-up and Operation will be exception of the cases. By way of analyzing the KEPCO ENC's Processes/Procedures/Systems and the ones in PMBOK Guide, this report will show the contents in the PMBOK Guide is rather practical than theoretical. Meanwhile, implications whether the conclusions of this report might be applied to other industries such as general construction, non-nuclear plants, etc. should be left behind to follow-up studies.

Application of storm water management model to designing the sponge city facilities in the Athletes Village of Military World Games in Wuhan

  • Liu, Jian;Liu, Yan;Liu, Ru;Li, Sixin;Wu, Lingyi
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.346-352
    • /
    • 2017
  • This study discusses application of the storm water management model (SWMM) to designing the sponge city facilities in the Athletes Village of Military World Games in Wuhan in October 2019. The SWMM was used to simulate the runoff processes and reduction efficiencies of the sponge city facilities. The runoffs of the sponge city facilities were compared with those of traditional drainage system for the design rainfall of 35.2mm and the rainfalls with different recurrence periods. The results show that the hign density sponge city facilities could meet the requirements for 80% of annual runoff control rate, SWMM can determine the scales of the sponge city facilities and effectively simulate the hydrological processes for different layout schemes. The simulation model is also helpful to making optimization of the sponge city facility layout.

  • PDF

TOTAL RISK INDEX FOR ASSESSING RISK LEVELS OF OVERSEAS CONSTRUCTION PROJECTS

  • Du Yon Kim;Seung Heon Han;Heedae Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1414-1418
    • /
    • 2009
  • International construction projects typically manifest difficult, complex, and varied types of risk exposures; because of this, there is a need for accurate evaluation of risk-integrated performances during the timeframe of project execution. Given the financial crisis currently affecting the world economy recession, risk management has become a more crucial part for the success of international project management. However, the majority of risk management approaches, particularly for overseas projects, are focused primarily on simple forms of checklists, formalization of risk variables affecting project performance for a specific phase, or more complicated computational methods that restricting practical utilization in real-world projects; moreover, these methods lack the conceptual basis to broadly visualize the level of risk over all phases of a project. This study suggests an efficient, yet simple risk-integrated total index to successfully assess the risk levels of overseas construction projects. To this end, this paper first investigates the life cycles and key processes of decision-making for a given project and then derives formulas to represent the total risk index (TRI) along the key decision-making processes. In addition, the study examines the relationships between TRI and performance levels based on the analysis of 126 real-world project samples. Validations using the proposed TRI showed a high correlation to project performance, signifying the usefulness of the proposed approach for construction firms when investigating the level of risks and key areas for management focus.

  • PDF

CONSTRUCTION OF SOME PROCESSES ON THE WIENER SPACE ASSOCIATED TO SECOND ORDER OPERATORS

  • Cruzeiro, A.B.
    • Journal of the Korean Mathematical Society
    • /
    • v.38 no.2
    • /
    • pp.311-319
    • /
    • 2001
  • We show that it is possible to associate diffusion processes to second order perturbations of the Ornstein-Uhlenbeck operator L on the Wiener space of the form L = L + 1/2∑L$^2$(sub)ξ(sub)$\kappa$ where the ξ(sub)$\kappa$ are "tangent processes" (i.e., semimartingales with antisymmetric diffusion coefficients).

  • PDF

ON THE EMPIRICAL MEAN LIFE PROCESSES FOR RIGHT CENSORED DATA

  • Park, Hyo-Il
    • Journal of the Korean Statistical Society
    • /
    • v.32 no.1
    • /
    • pp.25-32
    • /
    • 2003
  • In this paper, we define the mean life process for the right censored data and show the asymptotic equivalence between two kinds of the mean life processes. We use the Kaplan-Meier and Susarla-Van Ryzin estimates as the estimates of survival function for the construction of the mean life processes. Also we show the asymptotic equivalence between two mean residual life processes as an application and finally discuss some difficulties caused by the censoring mechanism.

건설 CALS 구현을 위한 한일 접근 방법에 관한 연구

  • 오세정;김연응;최돈승
    • Proceedings of the CALSEC Conference
    • /
    • 1999.07b
    • /
    • pp.663-676
    • /
    • 1999
  • Construction CALS is actively being pursued in Korea and Japan. This paper overviews the similarities and differences between both CALS. And this paper reveals both countries have a common ultimate goal of construction CALS, but a slight differences in their implementing processes. Lately Korean construction CALS places much emphasis upon supporting construction management for contractors and project owner, while Japanese construction CALS has made an great efforts in the electronic bidding system and implementing intelligent CAD system and its application. With a firm support and active involvement of enterprises, both countries will flexibly adapt their construction CALS to the changes in future technological trends and build-up of information infrastructure.

  • PDF

A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Lee, Jae-Hong;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.12
    • /
    • pp.1-15
    • /
    • 2020
  • In this paper, we propose a novel method for converting the existing 2D processes in the design and construction phase of civil engineering, to the future BIM-based processes. First, we compare and analyze the actual application processes of the outputs of the existing 2D method and the outputs of the 3D BIM method, for the whole process of BIM design of earthworks and road structures and integrated utilization of quantity, process(4D) and construction cost(5D), in view of life-cycle. The proposed method acquire the outputs of the design phase integrating IFC international common standard file information and CBS/OBS/WBS standard classification scheme information, and acquire the outputs of the construction stage by using an integrated utilization module for quantity, process(4D) and construction cost(5D). Ultimately, we intend to commercialize the step by step technologies for BIM design and construction in civil engineering by using the proposed method.