A Study on the Improving Construction Processes through the Cooperative Design (협력설계를 통한 건설 프로세스 개선 방안)

  • Na Kyung-Chul;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.144-156
    • /
    • 2001
  • This study aims at improving the limitations of current construction processes. Previous solutions to improve construction processes have been focused on the improvement of local processes. This paper proposes a method to improve global effectiveness of construction processes through ascertainment of communication among the process participants. This paper provides two case studies: Deck plate installation processes and Duct installation processes. The case study illustrates a way to improve global effectiveness by incorporating downstream participants such as specialty contractors in upstream construction processes such as design and planning.

  • PDF

ICT Implementation for Materials Management in Construction Projects: Case Studies

  • Kasim, Narimah
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.1
    • /
    • pp.31-36
    • /
    • 2011
  • Construction materials usually constitute a major portion of the total cost in a building construction project. Materials management Is made problematic by materials shortages, delays in supply, price fluctuations, damage and wastage, and lack of storage space. Despite the potential benefit of ICT, convincing construction organisations to embrace its use and implementation has proved a difficult task. This study seeks to identify the implementation of ICT for materials management processes in construction projects. The findings from the case studies reveal that the implementation of ICT in the materials management processes for construction projects in Malaysia Is at early stage. Microsoft Excel Spreadsheet and handheld devices are found to be the common ICT tools adopted in the materials management processes. The main barrier is found to be the cost involvement at the initial stage or overall implementation of ICT in the materials management processes. Finally, this paper concludes the finding from interviews towards the ICT implementation of materials management in the construction projects.

ICT IMPLEMENTATION FOR MATERIALS MANAGEMENT IN CONSTRUCTION PROJECTS

  • N.B. Kasim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.195-200
    • /
    • 2011
  • Construction materials usually constitute a major portion of the total cost in a building construction project. Despite the potential benefit of ICT, convincing construction organisations to embrace its use and implementation has proved a difficult task. This study seeks to identify the implementation of ICT for materials management processes in construction projects. The findings from the interviews reveal that the implementation of ICT in the materials management processes for construction projects in Malaysia is at early stage. Microsoft Excel Spreadsheet and handheld devices are found to be the common ICT tools adopted in the materials management processes. The main barrier is found to be the cost involvement at the initial stage or overall implementation of ICT in the materials management processes. Finally, this paper concludes the finding from interviews towards the ICT implementation of materials management in the construction projects.

  • PDF

Basic Research on Nuclear Power Plant Construction Claims and Dispute Management Processes Development

  • Son, HyeJin;Lee, SangHyun;Byon, SuJin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.710-711
    • /
    • 2015
  • A nuclear power plant construction is a complex form of construction which comprises various stakeholders and contractors. Therefore, contract disputes will occur due to conflicting interests of contracting parties and unpredictable factors which arise during construction work. Even if the contract is well prepared, it cannot fully prepare for future situations in actuality. Claims management is very important in carrying out construction management. This study intends to define claim, and delve into development of claims management processes from the viewpoint of owners and contractor through consideration on international contract terms on claims management and the details of the claims management of the Construction Extension to the PMBOK. In addition, it is needed to accumulate and manage data on claims that have occurred so that they can be referenced in the future. As information should be accumulated so that type classification can be carried out and that lessons can be learned on claims that have occurred in each business site, study on establishing data-based systems relating to claims processes will be needed in the future.

  • PDF

Diagnosing communication management using SW-CMM concept (SW-CMM 개념을 활용한 의사전달관리의 진단)

  • Lee, Seon-Gi;Park, Jeong-Ha
    • 시스템엔지니어링워크숍
    • /
    • s.1
    • /
    • pp.15-20
    • /
    • 2003
  • Construction industry recognizes the necessity to manage is business from viewpoint of processes, and consider developing, evaluating and improving standard processes as important managerial target. SW-CMM provides basic framework for this process management. However, appropriate tailoring and adjustment are essential for SW-CMM concept to be applied to construction business. SW-CMM makes construction manager understand the capability of business process, based on which the priority of process improvement is judged. The capability is prescribed by common features. This paper introduces the basic frame for diagnosing construction business processes with SW-CMM, and presents the case study of analysing processes focusing on communication management.

  • PDF

New Concept of Construction Business Process Modeling Connected with Information Technology (IT와 연계된 건설분야 신개념 BPR 모형 구성)

  • Kwak Joong-Min;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.151-158
    • /
    • 2003
  • Recently, the off-line processes in the construction industry are being changed to the electronic processes by several information technology (IT) tools including CALS. To improve the business processes to on-line processes, the business process reengineering (BPR) is a representative methodology for reviewing unnecessary and additional processes from the established business procedure. This study suggests a new process modeling method for construction BPR (CBPR) that consists of object-related process model (ORPM). In suggested modeling method, the connection with IT tools such as Workflow, enterprise resource planning (ERP), construction CALS, and business breakdown structure (BBS) was considered. The ORPM in the study is the main model for representing the detailed construction processes. It consists of nine relationship and six diagrams to represent the relationship between construction activities and the direction within the process model. Those models suggested from this study can be a useful tool for the CBPR because the researches and the practical applications related to the BPR of construction project are insufficient in our construction industry.

  • PDF

CONSTRUCTION BUSINESS PROCESS AUTOMATION USING WORKFLOW TECHNOLOGY

  • Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.569-574
    • /
    • 2005
  • This paper presents the core technology of Construction Business Process Automation to model and automate construction business processes. Business Process Reengineering (BPR) and Automation (BPA) have been recognized as one of the important aspects in construction business management. However, BPR requires a lot of efforts to identify, document, implement, execute, maintain, and keep track thousands of business processes to deliver a project. Moreover, existing BPA technologies used in existing Enterprise Resource Planning (ERP) systems do not lend themselves to effective scalability for construction business process management. Application of Workflow and Object Technologies would be quite effective in implementing a scalable enterprise application for construction community. This paper present the technologies and methodologies for automating construction business processes by addressing how: 1) Automated construction management tasks are developed as software components, 2) The process modeling is facilitated by dragging-and dropping task components in a network, 3) Raising business requests and instantiating corresponding process instances are delivered, and 4) Business process instances are executed by using workflow technology based on real-time simulation engine. This paper presents how the construction business process automation is achieved by using equipment reservation and cancellation processes simplified intentionally.

  • PDF

BUSINESS PROCESS ENGINEERING IN THE CONSTRUCTION INDUSTRY

  • Brenda L. P. Yip;Ping Yung
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.622-627
    • /
    • 2009
  • Business process engineering (BPE) is a top-down management approach for increasing efficiency and productivity through radical and fundamental changes to the business processes of the organization. BPE requires firms to initially develop a model of the existing business processes of the firm to distinguish functional tasks from processes used for coordinating inputs, activities and outputs. The model is used for understanding the business processes in the organization and to simulate the effect of changes to the processes. The model can also be used to justify business processes, which involves assessing whether the business process provides value to the customer in its current configuration. Justification requires a careful examination of the key business processes used by the firm to identify systemic shortcomings in the process and to create a new business process to produce greater efficiency. BPE also considers automating as many business processes as possible to increase operational efficiency and the integration of business process tasks. The construction industry has been slow to adopt BPE because of its project approach in which a major firm contracts with various functional service providers and regards each project as unique. The industry focuses on functional task efficiency rather than business process efficiency. There is no formal methodology or criteria for determining whether a business process is effective for a construction firm in its current configuration. The use of performance measures such as costs, task duration times or other metrics can be useful in evaluating the effectiveness of an existing business process and for modeling the possible outcome of a fundamental and radical change to the process.

  • PDF

Understanding Collaborative Working Processes within Construction Project Teams Using Agent-Based Modeling and Simulation (에이전트기반 시뮬레이션을 활용한 건설프로젝트 조직 내 협업과정의 이해)

  • Son, JeongWook;Shin, Seung-Woo;Yi, June-Seong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.70-77
    • /
    • 2014
  • Collaborative processes among team members including communication, coordination, and information-handling processes either during pre-construction or project execution are required in order to accomplish the objectives of construction projects. However, current construction management practice does not explicitly take the effect of organizational aspects on project performance into account. This paper introduces a method to understand collaborative processes in an explicit and systematic fashion. An agent-based simulation of collaborative working processes within construction project teams was designed from game theory perspective and implemented. The simulation produced both individual behavior and network dynamics. Individuals represented as agents made efforts to improve performance by communication and coordinating with other members, and overall team network was emerged as a result of interactions among members. Interestingly, it was found that the tendency of forming cohesive subgroups increased when sustaining relations with between-group partners incurs higher cost. The primary contribution of this paper is that it presented an explicit approach to examining collaborative working processes in construction project teams and it extended existing computational organization and network studies by integrating individual behavior models and network models.

INTEGRATION OF SSM AND IDEF TECHNIQUES FOR ANALYZING DOCUMENT MANAGEMENT PROCESSES

  • Vachara Peansupap;Udtaporn Theingkuen
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.725-731
    • /
    • 2009
  • Construction documents are recognized as an essential component for making a decision and supporting on construction processes. In construction, the management of project document is a complex process due to different factors such as document types, stakeholder involvement, document flow, and document flow processes. Therefore, inappropriate management of project documents can cause several impacts on construction work processes such as delay or poor quality of work. Several information and communication technologies (ICT) were proposed to overcome problems concerning document management practice in construction projects. However, the adoption of ICT may have some limitation on the compatibility of specific document workflow. Lack of understanding on designing document system may cause many problems during the use and implementation phase. Thus, this paper proposes the framework that integrates Soft System Methodology (SSM) concept and Integrated Definition Modeling Technique (IDEF) for analyzing document management system in construction project. Research methodology is classified as the case study. Five main construction building projects are selected as case studies. The qualitative data related to problems and processes are collected by interviewing construction project participants such as main contractors, owners, consultants, and designers. The findings from case study show the benefits of using SSM and IDEF. The use of SSM can help identify the problems in managing construction document in rich picture view whereas IDEF can illustrate the document flow in construction project in details. In addition, the idea of integrating these two concepts can be used to identify the root causes of process problems at the information level. As the results, this idea can be applied to analyze and design web-based document management system in the future.

  • PDF