• 제목/요약/키워드: Construction Planning

검색결과 2,752건 처리시간 0.031초

보용 시스템 거푸집의 전용계획 자동화 알고리즘 기초연구 (Basic study of reuse planning automation algorithms on system forms that are used on girders and beams)

  • 임채연;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.7-8
    • /
    • 2015
  • Formwork accounts for 10% of the total construction cost and 30~40% of the framework cost, which is a fairly large part. Various system forms were developed for improved economic feasibility and constructability of formwork and for reduced construction duration. In general, the price of system forms per unit area is higher than that of the conventional method, yet the total construction cost can be reduced through higher reusability and constructability. However, if the reusability of forms is excessively increased to cut down the material cost, it may increase the construction duration, which will result in cost increase. On the other hand, if the reusability is decreased for reduction of construction duration, it may lead to cost increase caused by excessive input of materials. To solve such a problem, an algorithm for simplified reuse planning that meets the requirements of construction duration, cost, quality and safety is required. In this regard, the study intends to perform a fundamental research for development of reuse planning automation algorithms on system forms that are used on girders and beams.

  • PDF

초고층 건물의 구조체 공사의 작업계획방법에 관한연구 (A Study on the Work-Planning Method of High-rise Building)

  • 김대길;황재우;정호근;김주환;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2006년도 춘계학술논문 발표대회 제6권1호
    • /
    • pp.129-132
    • /
    • 2006
  • Recently, Society increasingly need the hish-rise building because of urban population concentration. and The hish-rise building need new systematic work-planning method. but it didn't use the construction project's work plan and management. his paper investigated efficient work-planning method. and the work-planning method in using domestic High-rise building's structure work. A investigated result is TACT, DOC LOB etc. and domestic using method is 3day and 4day-Cycle among the Tact. This paper is to compare and analysis two method. a purpose of paper is to analyse application through the case of using the work-planning method. also To find efficient method.

  • PDF

Global Collaboration During Front End Planning of Capital Projects

  • Gibson, G. Edward Jr.
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.15-18
    • /
    • 2015
  • Front end planning is arguably the most impactful process in the successful delivery of capital projects. Organizations expend substantial effort in this planning process, intending to minimize risk and promote project success. This process has been well documented, including critical technical components, as well as the importance of team collaborative components. As organizations continue to pursue large projects with multi-national participation from sponsors, designers, contractors and suppliers, the importance of collaboration on a global scale during front end planning becomes more important, not less. This paper will outline research performed over the past two decades giving the basic components of the process and the value of global collaboration. It will provide guidance to project participants in pursuing successful planning.

  • PDF

Suggestion and Verification of Assessment model on Construction-Cost of Steel Bridge in Project Performance Phases

  • Kab-Soo Kyung;Hye-Yeon Park;Sin-Hwa Kang;Eun-Kyoung Jeon
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.606-615
    • /
    • 2009
  • Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.

  • PDF

AUTOMATED CONSTRUCTION PLANNING AND VISUALIZATION

  • M. Kataoka
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.61-68
    • /
    • 2007
  • There has been a lot of research on and release of commercial systems that enable evaluation and visualization of construction methods. These have enabled the selection of good construction plans. However, the process in which engineers build 3D geometry, formulate a schedule and eventually synchronize them is still a time-consuming process. Changing any aspect of the geometry or the schedule and re-linking them is also time-consuming. Therefore, the engineers may compromise on getting the best solution. This paper describes a technique to automate the generation of multiple sets of schedules, quantity takeoffs and 4D visualization from a single 3D model.

  • PDF

성공적인 해외 건설 프로젝트 수행을 위한 리스크 관리 계획·절차 구축 및 활용 방안에 대한 연구 - 영국의 사업관리 기법인 PRINCE2를 기반으로 - (A Study on Composition and Application of Risk Management Planning and Procedure for Successful Overseas Construction Projects - Based on the PRINCE2 Methodology in the UK -)

  • 강신봉;김승철
    • 한국건설관리학회논문집
    • /
    • 제17권1호
    • /
    • pp.48-55
    • /
    • 2016
  • 본 연구는 성공적인 해외건설프로젝트 수행을 위한 리스크 관리 계획 절차를 구축하여 활용방안을 제안하는 것을 목적으로 한다. 접근방법은 해외건설산업의 현황을 살펴보고, 영국의 프로젝트관리 체계인PRINCE2의 리스크 관리 기법의 적용과 국내 해외 건설사들의 리스크 관리 수행사례를 분석하였다. 이를 토대로 리스크 관리를 위한 해외건설사의 조직 구성과 업무프로세스를 제안하고, 리스크 관리 계획. 절차를 개발하여, 해외건설 프로젝트에 적용하였다. 그 결과, 리스크 관리와 계약관리를 효과적으로 수행할 수 있게 되었다. 본 연구의 결과는 향후 글로벌 건설기업으로 진화를 위한 해외건설사의 해외건설프로젝트 사업 능력 향상을 위해 유용하게 활용 될 수 있을 것으로 판단된다

INTEGRATED CONSTRUCTION PROJECT PLANNING USING 3D INFORMATION MODELS

  • Chang-Su Shim;Kwang-Myong Lee;Deok-Won Kim;Yoon-Bum Lee;Kyoung-Lae Park
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.928-934
    • /
    • 2009
  • Although the evolution and deployment of information technologies will undoubtedly play an important role in the current construction industry, many engineers are still unsure of the economic value of using these technologies. Especially for the planning of a construction project, a collaboration system to utilize the whole resources is a essential tool for the successful outcome. A detailed, authoritative, and readily accessible information model is needed to enable engineers to make cost-effective decisions among established and innovative plan alternatives. Most engineers rely on limited private experiences when they create solutions or design alternatives. Initial planning is crucial for the success of the construction project. Most construction projects are done through collaboration of engineers who have different specialized knowledge. Information technologies can dramatically enhance the performance of the collaboration. For the information delivery, we need a mediator between engineers. Object-based 3-D models are useful for the communication and decision assistance for the intelligent project design. In this paper, basic guidelines for the 3-D design according to different construction processes are suggested. Adequate interoperability of 3-D objects from any CAD system is essential for the collaboration. Basic architectures of geometry models and their information layer were established to enable interoperability for design checks, estimation and simulation. A typical international project for roadway was chosen for the pilot project. 3-D GIS model was created and bridge information models were created considering several requirements for planning and decision making of the project. From the pilot test, the integrated construction project planning using 3-D information models was discussed and several guidelines were suggested.

  • PDF

성미산마을 공동체주거 계획과정의 거주자와 코디네이터의 의견조정 사례연구 (Case Study of Opinion Coordination between Residents and Coordinators on the Planning Process of Community Housing in Sungmisan Village)

  • 박경옥;류현수
    • 한국주거학회논문집
    • /
    • 제23권3호
    • /
    • pp.1-11
    • /
    • 2012
  • The purpose of this study was to make clear considerations in the planning of community housing and the roles of coordinators. Seongmisan village, a representative urban community village in Seoul, was selected for this study on problem solving between residents and opinion coordination between residents and coordinators. For this qualitative research, 2 residents and 2 coordinators answered 'open questionnaires' on prior basic planning, land purchase, financing, architectural planning, construction and inspection, and actual living conditions thereafter. They were each interviewed for 2 hours at a time that was 14-16 months after the residents started living in the new houses, and the records were transcribed. The following was the result. 1) The residents, who ruled the steps of prior basic planning and land purchase, did not have sufficient information or knowledge of the construction of community housing, so that they faced difficulties especially in the legal and financial aspects. 2) The coordinators participated in the project at the steps of architectural planning and construction. The residents accepted the coordinators' opinions on the choice of floor and position, and the coordinators listened to the residents' opinions on individual plans and finishing materials. In the construction step, however, there was conflict between them, and dissatisfaction occurred on the completion time and construction cost. For the successful construction of community housing, a professional coordination company needs to join the project to establish a system of opinion coordinating from the step of prior basic planning to the step of afterconstruction management.

건설계획 수립시 계층분석적 의사결정법 적용방안에 관한 연구 -철도노선 선정시 활용사례 연구- (A Study on Analytic Hierarchy Proces for Construction Planning -Research on Examples of Railway Route Selection-)

  • 손진현;차철
    • 한국산업융합학회 논문집
    • /
    • 제10권4호
    • /
    • pp.249-254
    • /
    • 2007
  • Recently, the items of construction planning have magnified and specialized and the problems occurring at the first step of the construction planing process have complicated. In this research, AHP(Analytic Hierarchy Process) method which is simple to apply and clear to decide has been proposed when a people making a plan at the first step of the construction planing process. As an example, the best solution has been obtained in a railway construction line choice that consist of various items by applying for this method, which proves the possibility of application of this method to the complicated problems.

  • PDF

이산사건 시뮬레이션과 BIM을 활용한 설계대안 평가에 관한 연구 (Design Alternative Assessment Method using Discrete Event Simulation and Building Information Model)

  • 이창용;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.158-159
    • /
    • 2016
  • Construction project consists of several stages such as planning, design, construction, operation/maintain, etc. Decisions made in the planning and design stage have a significant impact on the construction and operation/maintain stages. Identifying key resources contributing to duration and cost of design alternatives is an important measure to achieve effective coordination between design and construction. This study proposes a method which finds an optimal design alternative by taking into account of resource planning, expected duration, and cost in construction stage. Base on literature review relative to the assessment of design alternatives, a method which predicts required resources, duration, and cost of the design alternative is established. Then, a method that identifies an optimal design alternative based on the preference of a certain project criteria is developed. Finally, a case study is presented.

  • PDF