• Title/Summary/Keyword: Construction Operation Model

Search Result 612, Processing Time 0.028 seconds

A Basic Study on the Development of O&M Cost Assessment Model to Improve Operational Efficiency of Large Public Research Infrastructures (CAM) (대형 공공연구인프라의 운영 효율성 제고를 위한 운영 및 유지관리비 평가모델 개발 기초연구)

  • Choi, Sun-Ah;Son, Seung-Hyun;Lee, Sung-Ho;Oh, Oum-Joong;Han, Bum-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.93-94
    • /
    • 2021
  • The Korean government has invested a tremendous amount of money in the last 10 years to build large public research infrastructures (LPRI). For efficient operation and maintenance of LPRI built with expensive equipment and professional engineers, reasonable budget needs to be allocated. However, it is difficult to fulfill sustainable operation and maintenance (O&M) because there is no standard on budgeting for efficient LPRI operation, including expensive equipment and manpower allocation. There have been a lot of cost assessment studies regarding O&M of high-demand facilities such as hospitals, hotels and residential buildings, but a very few on sustainable O&M of LPRI. Therefore, mid/long-term budget establishment plans for efficient LPRI O&M are required from the initial planning stage and a cost assessment model to support the plans should be developed. The objective of this paper is to propose a cost assessment model for sustainable operation and maintenance of large public research infrastructures. To do so, actual O&M data of 6 LPRI types in operation are collected, and regression analysis model (RAM) is used for development and evaluation a cost assessment model. The study result will support sustainable operation of LPRI from a business perspective and be used as basic data for continuous development of cost assessment models to establish budgets for LPRI operation from an academic perspective.

  • PDF

A Relation between Financing Conditions and Business Operation of a Construction Company (자금조달환경과 건설업체 경영상태 간의 관계성 분석 연구)

  • Seo, Jeong-Bum;Lee, Sang-Hyo;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.1
    • /
    • pp.61-70
    • /
    • 2012
  • A construction project is very costly and takes a long time to make investment and yield profit. For this reason, financial institutions are cautious about financing construction projects. Meanwhile, a construction company needs financing from financial institutions to cover a large expense of a construction project. Thus, there is likely to be a close correlation between financing conditions and business operation of a construction company. To examine the relationship, variables were identified that are related to insolvency of a construction company and changes in financing conditions. The analysis period is between the second quarter of 2001 and the fourth quarter of 2010. Data was retrieved from TS2000 established by Korea Listed Companies Association (KLCA), Statistics Office, and Construction Economy Research Institute of Korea (CERIK). In terms of methodology, VECM (Vector Error Correction Model) was used to analyze dynamic relationship between changes in financing conditions and insolvency of a construction company based on the identified variables. The hypothesis was that changes in financing conditions would significantly affect business of a construction company, but, the analysis did not find a close relation between the two factors. However, it was shown that poor business of a construction company affects financing conditions adversely.

A basic study 3D model advancement method for nuclear power plant (원자력 발전설비의 3D 모델 상세화 방안에 대한 기초 연구)

  • Lim, Byung-Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.37-38
    • /
    • 2018
  • BIM(Building Information Modeling) in the architecture, VDC(Virtual Design and Construction) defined CIFE(Center for Integrated Facility Engineering) of Stanford university in USA, and Data-driven design definition issued by TECDOC-1284 of IAEA are doing data-level design generated by 3D CAD technology, integrating and managing related information based on the 3D model, and Using 3D models effectively during nuclear power plant life cycle. 3D model of domestic nuclear power industry is using interference review between design fields, 4D system linked 3D construction model and schedule activity, but the 3D model generated in the design phase is effectively not utilized during the construction, operation, decommissioning. therefore, This study is aimed to suggest 3D model LOD(Level of Detail) advancement method through the analysis of existing literature, 2D drawings, and 3D models throughout nuclear power plant lifecycle.

  • PDF

A STUDY ON CYCLONE SYSTEM ASSISTING FOR THE REVISION OF CONSTRUCTION STANDARD PRODUCTION UNIT SYSTEM

  • Tae-Kyung Lim;Han-Seong Gwak;Won-Sang Shin;Chang-Baek Son;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.583-586
    • /
    • 2013
  • Construction processes are highly repetitive. A resource entity continuously cycles through work tasks that processes or uses resources. Web-CYCLONE (Halpin 1992) has been accepted as a useful tool for modeling and analyzing a specific operation. However the system has a lack of practicality as follows: (1) it does not efficiently record and keep track of operation models in a database; (2) it does not provide the functions which facilitate to retrieve corresponding model and to update local variables of the model using observed data; (3) it does not automate the complex process that executes simulation experiment, analyzes simulation outputs and generates a report on behalf of the practitioners. Therefore, practitioners have a difficulty in reusing, modifying and analyzing the existing operation models. This study introduces a Client/Server based CYCLONE that improves above-mentioned limitations in the existing Web-CYCLONE. The system was illustrated by revising CSPU in practice.

  • PDF

The Development of Simulation Model for Calculating Hoisting Time of Double-Cage Construction Lift in Supertall Building Construction (Double-Cage 건설용 리프트의 양중시간 산정을 위한 시뮬레이션 모델 개발)

  • Kim, Wansoub;Lee, Dongmin;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.64-65
    • /
    • 2016
  • According to the recent increase in the height of supertall buildings, construction lift became one of most important equipment for vertical transportation of resources. However, increase in lifting load during peak time in which the resources are concentrated often causes a risk of construction delay. This study suggests a concept of Double-Cage construction lift, which is a lift with two cages attached together allowing transportation of resources on two consecutive work floors simultaneously. The aim of this study is to present a simulation model suitable for calculating hoisting time of Double-Cage construction lift. The proposed model is expected to be utilized when applying Double-cage construction lift for its efficient operation and management.

  • PDF

3-D Graphical Model-Based Design and Control of Automated Equipment (3차원 그래픽 모델에 근거한 자동화 장비의 설계 및 조종)

  • Seo Jongwon;Haas Carl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.188-191
    • /
    • 2002
  • This paper concerns 3-D graphical modeling and simulation techniques for design and control of automated equipment for construction and facility maintenance. A case study on the use of 3-D graphics techniques for developing a power plant maintenance robot is presented. By simulating equipment operation within the 3-D geometry models of the work environment the environment design was improved. The 3-D graphical models of the equipment and the work environment were further utilized for the control of the robot from a remote distance. By presenting the real-time updated equipment configuration and the work environment to the operator, the graphical model-based equipment control system helped the operator overcome the problems associated with spatial perception. The collision between the robot and the plant structures was also avoided based the real-time analysis of the dynamically updated graphical models.

  • PDF

PREDICTION OF FAULT TREND IN A LNG PLANT USING WAVELET TRANSFORM AND ARIMA MODEL

  • Yeonjong Ju;Changyoon Kim;Hyoungkwan Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.388-392
    • /
    • 2009
  • Operation of LNG (Liquefied Natural Gas) plants requires an effective maintenance strategy. To this end, the long-term and short-term trend of faults, such as mechanical and electrical troubles, should be identified so as to take proactive approach for ensuring the smooth and productive operation. However, it is not an easy task to predict the fault trend in LNG plants. Many variables and unexpected conditions make it quite difficult for the facility manager to be well prepared for future faulty conditions. This paper presents a model to predict the fault trend in a LNG plant. ARIMA (Auto-Regressive Integrated Moving Average) model is combined with Wavelet Transform to enhance the prediction capability of the proposed model. Test results show the potential of the proposed model for the preventive maintenance strategy.

  • PDF

Image Processing-based Object Recognition Approach for Automatic Operation of Cranes

  • Zhou, Ying;Guo, Hongling;Ma, Ling;Zhang, Zhitian
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.399-408
    • /
    • 2020
  • The construction industry is suffering from aging workers, frequent accidents, as well as low productivity. With the rapid development of information technologies in recent years, automatic construction, especially automatic cranes, is regarded as a promising solution for the above problems and attracting more and more attention. However, in practice, limited by the complexity and dynamics of construction environment, manual inspection which is time-consuming and error-prone is still the only way to recognize the search object for the operation of crane. To solve this problem, an image-processing-based automated object recognition approach is proposed in this paper, which is a fusion of Convolutional-Neutral-Network (CNN)-based and traditional object detections. The search object is firstly extracted from the background by the trained Faster R-CNN. And then through a series of image processing including Canny, Hough and Endpoints clustering analysis, the vertices of the search object can be determined to locate it in 3D space uniquely. Finally, the features (e.g., centroid coordinate, size, and color) of the search object are extracted for further recognition. The approach presented in this paper was implemented in OpenCV, and the prototype was written in Microsoft Visual C++. This proposed approach shows great potential for the automatic operation of crane. Further researches and more extensive field experiments will follow in the future.

  • PDF

Evaluating the Effectiveness of Unconventional Intersections on Operation and Environment (회전교통량 분산식 임계 교차로의 운영 및 환경 효과 분석)

  • Moon, Jae-Pil;Kim, Hoe-Ryong;Lee, Suk-Ki;Jeong, Jun-Hwa
    • International Journal of Highway Engineering
    • /
    • v.16 no.3
    • /
    • pp.75-84
    • /
    • 2014
  • PURPOSES : Traffic congestions which occur in the intersections of arterials lead to mobility and environment problem, and then traffic agencies and engineers have been struggling for mitigating congestions with greenhouse gas emissions. As an alternative of solving theses problems, this study is to introduce a low-cost and high-effectiveness countermeasure as unconventional intersections which are successfully in operation in U.S.. The main feature of unconventional intersections is to reroute turning movement on an approach to other approach, which consequently more green time is available for the progression of through traffic. Due to improved progression, this unique geometric design contributes to reduce delays with greenhouse gas emission and provides a viable alternative to interchanges. This study is to evaluate the potential operation and environment benefits of unconventional intersections. METHODS : This study used the VISSIM model with Synchro and EnViVer. Synchro is to optimize signal phases and EnViVer model to estimate the amount of greenhouse gas emissions by each condition. RESULTS : The result shows that unconventional intersections lead to increase the capacity and to reduce greenhouse gas emissions, compared to existing intersections. CONCLUSIONS : Unconventional intersections have the ability to positively impact operations and environments as a low-cost and high-effectiveness countermeasure.