J.L. Park;S.S. Kim;D.J. Kwark;J.G. Park;J.H. Kim;J.J. Kim
International conference on construction engineering and project management
/
2013.01a
/
pp.315-320
/
2013
The aim of this study is to compare efficiency and Total Factor Productivity(TFP) between Korean and Japanese construction firms in Korea and Japan over the period of 2005-2011. The results of this study are as follows. Efficiency scores of Korean construction firms are 0.797, and Japanese construction firms are 0.921. Second, annual total factor productivity growth of Korean construction firms is 0.5% and technical progress do much for TFP decrease. However Japanese construction firms marked annual increasing of 2.5% of TFP. Third, technical progress contributed in TFP increase of construction firms in Korea. Korean construction firms, however, relatively lagged behind Japanese construction firms in technical progress. Therefore, Korean construction firms need strategies to achieve technical advances including adopting new technology or process innovation to maintain competitiveness, survive, and develop in the future competition with Japan.
It has come to attention that a risk-assessing organization, that will benchmark a company's safety department, is imperative, following an increase in large-scale SOC-business project, construction of higher-raised buildings, development of underground space; all that have increase accident rates. Having faced problems that arise in firms that demand diversity, complexity and instantaneity, the purpose of the thesis is to arrive at efficient and practical problem-solving means. In order to solve the problems that would surface theoretically during an actual risk assessment, the state of the operation systems of the top five national construction firms having a hazard rate of 0.25 times less than the average rate have been analyzed, while a hierarchal recognition research of the employees who not only function at the operating level but are the practice subjects of a firm, has also been conducted, bringing the main text.
The construction environment has been declared as a hazard prone area due to high number of accident and death. The study aims to identify influential factors that contribute to poor safety practices and its consequences on construction workers in Cape Coast Metropolis. Seventy respondents were taken as the sample size for the study. Descriptive analysis was used to analyze the data obtained from the field. Findings show that poor site management, working without safety gadgets, failure to use their Personal Protective Equipment (PPE) and negligence of workers were the main causes of accidents on sites. Poor site management had the highest ranking among the seven variables. Effects of poor safety practices on building construction site and delays in work execution were due to injury of workers, extra cost due to payment of compensation to injured victims, not motivated due to injury of worker and declined reputation of firm. Management team should motivate workers for safe work done, provide adequate PPE for their workers on site and have documented health and safety policy on site. Site authorities and management team should be on site regularly to ensure proper safety practices on construction site.
Korean Journal of Construction Engineering and Management
/
v.13
no.4
/
pp.120-131
/
2012
Today, companies exist amid unlimited competition and uncertain adminstration environment, so hands-on workers are being exposed to various job requirements and stress due to this. Especially, employees in the design firm are physically difficult because of heavy working intensity unlike other industrial field, and because the process is interrelated unlike working of a five-day workday of the other industry, it is difficult to guarantee periodic holidays and vacation. In addition, recently, while BIM is introduced in the construction industry, various changes in the individual role as well as organizational dimension such as business environment and scope & role, etc. are required, so it is the actual situation that the category and factors of job stress due to this are being also changed. Accordingly, this research has grasped important and weak sectors according to characteristics such as career, position, gender, education and existence/nonexistence of BIM template, etc. by confirming a job stress level and inducing factors of hands-on workers at the design firm. This research has a meaning in constructing a business environment of a design firm that is a main participant of BIM-based projects that are expected to have high utilization in the future.
Journal of Construction Engineering and Project Management
/
v.3
no.1
/
pp.22-27
/
2013
Inter-organizational Relationships (IORs) governance is one of the emerging research areas that have been studied in different contexts (e.g. economics, strategy, organization, and management). This view, particularly, attracted rising attention from academics and practitioners in the context of construction projects, due to the complex forms of IORs in terms of inter-firm exchanges (e.g. engineering, procurement, finance, construction, and operation) in these projects. The focus of IORs governance is to control Inter-organizational relationships among two or more cooperative parties to alleviate conflict and achieve mutual gains. One of the mechanisms that have been identified in the related literature is formal governance mechanism. Although many empirical studies have been conducted using formal governance terms and indicators, there isn't yet a consensual definition of this mechanism and its components that may cause misinterpretation of research results and also impede future research. This paper makes contribution to the concept of IORs governance by clarifying the meaning of formal governance mechanism and identifying different indicators of this mechanism that have been used and identified in previous studies. This provides an innovative and useful framework to understand formal governance mechanism and its application in construction projects.
International conference on construction engineering and project management
/
2015.10a
/
pp.496-500
/
2015
International construction projects are inherently more risky than domestic projects with multi-dimensional uncertainties that require complementary risk management at both the country and project levels. However, despite a growing need for systematic country evaluations, most studies have focused on project-level decisions and lack country-based approaches for firms in the construction industry. Accordingly, this study suggests data-driven approaches for evaluating countries using two quantitative models. The first is a two-stage country segmentation model that not only screens negative countries based on country attractiveness (macro-segmentation) but also identifies promising countries based on the level of past project performance in a given country (micro-segmentation). The second is a multi-criteria country segmentation model that combines a firm's business objective with the country evaluation process based on Kraljic's matrix and fuzzy preference relations (FPR). These models utilize not only secondary data from internationally reputable institutions but also performance data on Korean firms from 1990 to 2014 to evaluate 29 countries. The proposed approaches enable firms to enhance their decision-making capacity for evaluating and selecting countries at the early stage of corporate strategy development.
International conference on construction engineering and project management
/
2013.01a
/
pp.321-327
/
2013
Inter-organizational Relationships (IORs) governance is one of the emerging research areas that have been studied in different contexts (e.g. economics, strategy, organization, and management). This view, particularly, attracted rising attention from academics and practitioners in the context of construction projects, due to the complex forms of IORs in terms of inter-firm exchanges (e.g. engineering, procurement, finance, construction, and operation) in these projects. The focus of IORs governance is to control Inter-organizational relationships among two or more cooperative parties to alleviate conflict and achieve mutual gains. One of the mechanisms that have been identified in the related literature is formal governance mechanism. Although many empirical studies have been conducted using formal governance terms and indicators, there isn't yet a consensual definition of this mechanism and its components that may cause misinterpretation of research results and also impede future research. This paper makes contribution to the concept of IORs governance by clarifying the meaning of formal governance mechanism and identifying different indicators of this mechanism that have been used and identified in previous studies. This provides an innovative and useful framework to understand formal governance mechanism and its application in construction projects.
Purpose: In this study we aim to identify factors affecting successful inter-firm collaboration. We tried to find out whether government subsidies to small-business owners should be made to experienced and competent cooperatives or to cooperatives with potential even if inexperienced. Research design, data and methodology: Using analytic hierarchy process (AHP), we examine if evaluation criteria for the Small Business Collaboration Grant (SBCG) reflect the potential of successful collaboration of applicant cooperatives. Results: We found that experts tend to think that applicant cooperatives without any experience as a recipient for the SBSG need to be evaluated by their growth potential and their preparation of the application rather than by their business performance or achievement history. The weight of the evaluation must be different between the growth potential and the achievements already achieved. By means of an expert survey, we confirmed that Rookies should weigh evaluation indicators that can reflect their growth potential, and experienced groups should give weight to evaluation indicators that can reflect their achievements. Conclusions: For SBCG applicants with experiences, experts tend to weigh more on SBCG business performances and feasible sharing systems. The screening procedure for the first applicant cooperatives need to focus more on "partner selection" stage, whereas elements related to "realization" apply to experienced applicant cooperatives.
PHAN, Giang Lam;NGUYEN, Thuy Dieu;NGUYEN, Chi Thi;NGUYEN, Lan;TRAN, Le Thi
The Journal of Asian Finance, Economics and Business
/
v.9
no.9
/
pp.93-104
/
2022
This study aims to investigate the factors that contribute to the sustainable development of 334 Vietnamese construction and real estate companies listed on the Stock Exchange of Vietnam over a 5-year period from 2016 to 2020. By using regression analysis with the support of STATA software through examining the financial statements, which involves looking into crucial ratios including capital structure, profitability, firm size, accounts receivable management, and tangible assets investment, this study sheds light on whether these accounting indicators could help predict the construction and real estate companies growing potential in the future. Nevertheless, these ratios slightly contribute to the explanation of the change in revenue growth ratio, with a result of 1.6%, indicating that the value relevance of accounting information provides a modest and insignificant effect on investment decisions. This is understandable because the Vietnamese construction and real estate market still has many shortcomings in handling unexpected events, as well as the industry's peculiarities related to major capital sources from bank loans. Based on this study, governmental authorities and business executives should plan appropriate risk management policies and measures to contribute to the sustainable development of construction and real estate companies.
Korean Journal of Construction Engineering and Management
/
v.1
no.2
s.2
/
pp.81-88
/
2000
Planning and control for safety management executed by the head office is one of the most important parts for improving safety level of construction company. So this study is initiated with the purpose of suggesting an improvement strategy to perform effective and rational safety management at the head office. In order to investigate the current status of safety management of large construction firms in the Korean construction industry, the safety criteria related to the head office which are used in the Supermerit Certification System were chosen and examined by industry expert. The selected criteria are used for mail questionnaire. The survey was performed for 79 construction firms. Based on the 3-year average accident rate of 79 firms(1.20), the safety level of firms are classified. The safety improvement strategies for the below and the above are proposed respectively.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.