• 제목/요약/키워드: Construction Failures

검색결과 217건 처리시간 0.032초

건설공사의 확률적 위험도분석평가 (Probabilistic Risk Assessment for Construction Projects)

  • 조효남;임종권;김광섭
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1997년도 가을 학술발표회 논문집
    • /
    • pp.24-31
    • /
    • 1997
  • Recently, in Korea, demand for establishment of systematic risk assessment techniques for construction projects has increased, especially after the large construction failures occurred during construction such as New Haengju Bridge construction projects, subway construction projects, gas explosion accidents etc. Most of existing risk analysis modeling techniques such as Event Tree Analysis and Fault Tree Analysis may not be available for realistic risk assessment of construction projects because it is very complex and difficult to estimate occurrence frequency and failure probability precisely due to a lack of data related to the various risks inherent in construction projects like natural disasters, financial and economic risks, political risks, environmental risks as well as design and construction-related risks. Therefor the main objective of this paper is to suggest systematic probabilistic risk assessment model and demonstrate an approach for probabilistic risk assessment using advanced Event Tree Analysis introducing Fuzzy set theory concepts. It may be stated that the Fuzzy Event Tree AnaIysis may be very usefu1 for the systematic and rational risk assessment for real constructions problems because the approach is able to effectively deal with all the related construction risks in terms of the linguistic variables that incorporate systematically expert's experiences and subjective judgement.

  • PDF

Effect of Extreme Rainfall on Cut Slope Stability: Case Study in Yen Bai City, Viet Nam

  • Tran, The Viet;Trinh, Minh Thu;Lee, Giha;Oh, Sewook;Nguyen, Thi Hai Van
    • 한국지반환경공학회 논문집
    • /
    • 제16권4호
    • /
    • pp.23-32
    • /
    • 2015
  • This paper addresses the effects of extreme rainfall on the stability of cut slopes in Yen Bai city, Northern Viet Nam. In this area, natural slopes are excavated to create places for infrastructures and buildings. Cut slopes are usually made without proper site investigations; the design is mostly based on experience. In recent years, many slope failures have occurred along these cuts especially in rainy seasons, resulting in properties damaged and loss of lives. To explain the reason that slope failure often happens during rainy seasons, this research analyzed the influence of extreme rainfalls, initial ground conditions, and soil permeability on the changes of pore water pressure within the typical slope, thereafter determining the impact of these changes on the slope stability factor of safety. The extreme rainfalls were selected based on all of the rainfalls triggering landslide events that have occurred over the period from 1960 to 2009. The factor of safety (FS) was calculated using Bishop's simplified method. The results show that when the maximum infiltration capacity of the slope top soil is less than the rainfall intensity, slope failures may occur 14 hours after the rain starts. And when this happens, the rainfall duration is the deciding factor that affects the slope FS values. In short, cut slopes in Yen Bai may be stable in normal conditions after the excavation, but under the influence of tropical rain storms, their stability is always questionable.

암반 비탈면에서 AE 기법을 이용한 위험도 평가 연구 (A Study on the Risk Evaluation using Acoustic Emission in Rock Slope)

  • 변요셉;김석천;성주현;천병식;정혁상
    • 한국지반환경공학회 논문집
    • /
    • 제15권11호
    • /
    • pp.5-12
    • /
    • 2014
  • 사면은 건설된 후에도 집중강우나 지진, 풍화 등 외부요인으로 인해 파괴가 발생할 수 있기 때문에, 사면의 안정적 유지관리를 위해서는 사면 붕괴의 가능성을 파악하는 것이 필요하다. 특히 암반사면은 암석의 취성적인 특성으로 인해 변위 계측 등과 같은 일반적인 방법으로는 파괴발생이전에 사전징후를 감지하기 매우 어렵다. 그러나 AE 기법을 사면에 적용한다면 변위가 발생하기 전에 파괴 시 발생된 AE 신호를 분석함으로써 일반적인 계측 방법보다 초기에 상태파악이 가능할 것이다. 본 논문에서는 한국의 암반사면 중 붕괴 이력을 가지고 있는 사면에 AE 기법을 적용하여 사면붕괴 가능성을 파악하였다. 그 결과 붕괴위험이 있는 사면에 AE 기법을 적용하면 사면의 위치별 붕괴 가능성을 가능할 것으로 판단된다.

리모델링 프로젝트의 사업관리 현안 발굴 연구 : 오피스빌딩 리모델링 사업을 대상으로 (Searching for Core Project Management Issues in Remodeling Projects : Focus on office building remodeling projects)

  • 서희준;김한수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.220-223
    • /
    • 2004
  • 국내 건설 시장의 신규 사업의 감소가 예상되고 있다. 이와 함께 대체 시장으로써 리모델링 사업이 부각되고 있다. 그 중 향후 수요 증가가 예상되는 오피스빌딩 리모델링 사업 수행에 참여함에 있어 우선 고려되어야 하는 사업의 주요 관리 현안이 무엇인가에 대한 고찰이 요구된다. 일반 신축 사업과 비교하여 상이한 특징과 프로세스를 지니고 있는 리모델링 사업의 효율적인 수행을 위해서는 사업의 특징을 충분히 고려한 현안의 인식이 갖춰져야 효율적이고 성공적인 사업으로 이끌어 갈 수 있을 것이다. 이에 본 연구에서는 오피스빌딩 리모델링 사업의 사업관리 현안을 발굴 제시하고 현안들이 제시하는 특징을 분석하여 제시하였다.

  • PDF

보다 나은 건축을 위한 과제들 -시장개방과 우리 건축의 문제점들- (Subjects for the Better Architecture)

  • 이학영
    • 기술사
    • /
    • 제30권2호
    • /
    • pp.52-60
    • /
    • 1997
  • As a matter of fact, the better architecture is very important things to create our generation and culture. Also, construction quality improvement is critical necessary to keep the culture and international competition which must be obtained through the consciousness reform of persons concerned. Therefore, the purpose of this proposal is to provide the basic point for establishing a practical compaign against construction failures. In this year, we have to remember the facts that's faced on market opening in construction market which is agreed in WTO. The contents of subject are as follows : 1 ) Subconscious reform of technician and projector concerned 2) Responsable consciousness of original contractor 3) Workmanship of skilled labor 4) Reasonable budget and bidding included sub-contractor 5) Advanced design and engineering quality 6) Certification of consulting engineer

  • PDF

건설프로젝트에서 Mobile-Cloud Computing Service 특성이 정보융합과 기대성과에 미치는 영향에 관한 연구: 사회적 자본의 관점에서 (A Study on the Effect of Mobile Cloud Computing Services Characteristics on the Intellectual Convergence and the Performance Expectancy in Construction Project: From the Perspective of the Social Capital)

  • 김영우;오재인
    • 한국빅데이터학회지
    • /
    • 제4권1호
    • /
    • pp.129-142
    • /
    • 2019
  • 건설 프로젝트는 불완전한 생산환경으로 인해 많은 건설실패가 발생하고 있다. 본 연구는 건설 현장에서 건설 기간 동안 ICT 자원을 임대하여 활용하고, 물리적인 유선 통신망 대신 스마트 폰, 테블릿 PC, 노트북 등 Mobile Device를 활용하는 Mobile Cloud Computing Service(이하 M-Cloud)를 도입할 경우 M-Cloud가 갖고 있는 신속정확성, 공유협업성, 편재성 등의 특성들이 건설현장에 참여하고 있는 다양한 프로젝트 참여자들 간의 사회적 관계망에 영향을 주어 참여자들 간의 정보교환 및 융합을 촉진하고, 상호 신뢰증진과 함께 궁극적으로 프로젝트 기대성과에 큰 도움을 줄 수 있다는 것을 실증적인 방법으로 연구하였다.

  • PDF

지형요인에 의한 절토사면 붕괴사례 (A Case Study on Cut Slope Failure due to the Geomorphological Factor)

  • 김승현;최지용;이종현;이정엽;구호본
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 춘계 학술발표회
    • /
    • pp.1161-1170
    • /
    • 2009
  • The Roads in Gangwon Province generally was made on purpose to use the military road. In case of these roads, tremendous dangerous cut slopes do exist and its road linear shape was badly designed. In order to make up for this situation, the government has continuously established the new road or performed the public works such as the straight line of the curved road. Soksil 2 cut slope was made through the road improvement work. This has small surface failures and collapses. In spite of dry season, this slope are leaking lots of groundwater at the unbelievable point. So as to get curious phenomenon right, we performed a detailed field investigation, the geomorphological analysis, the stability analysis considering field characteristic and ultimately proposed the countermeasure to make sure stability of Sokil 2 cut slope.

  • PDF

Leveraging Visibility-Based Rewards in DRL-based Worker Travel Path Simulation for Improving the Learning Performance

  • Kim, Minguk;Kim, Tae Wan
    • 한국건설관리학회논문집
    • /
    • 제24권5호
    • /
    • pp.73-82
    • /
    • 2023
  • Optimization of Construction Site Layout Planning (CSLP) heavily relies on workers' travel paths. However, traditional path generation approaches predominantly focus on the shortest path, often neglecting critical variables such as individual wayfinding tendencies, the spatial arrangement of site objects, and potential hazards. These oversights can lead to compromised path simulations, resulting in less reliable site layout plans. While Deep Reinforcement Learning (DRL) has been proposed as a potential alternative to address these issues, it has shown limitations. Despite presenting more realistic travel paths by considering these variables, DRL often struggles with efficiency in complex environments, leading to extended learning times and potential failures. To overcome these challenges, this study introduces a refined model that enhances spatial navigation capabilities and learning performance by integrating workers' visibility into the reward functions. The proposed model demonstrated a 12.47% increase in the pathfinding success rate and notable improvements in the other two performance measures compared to the existing DRL framework. The adoption of this model could greatly enhance the reliability of the results, ultimately improving site operational efficiency and safety management such as by reducing site congestion and accidents. Future research could expand this study by simulating travel paths in dynamic, multi-agent environments that represent different stages of construction.

승강기 중대고장 분석을 통한 안전관리 시사점 도출 (Derivation of Safety Management Implications through Analysis of Major Elevator Failures)

  • 김범상;박범
    • 대한안전경영과학회지
    • /
    • 제22권3호
    • /
    • pp.23-29
    • /
    • 2020
  • As the duty to report and investigate major elevator failures has expanded due to the total amendment of the Elevator Safety Management Act in 2018, more important information on major elevator failures that have been partially identified has been collected. As of 2019, the number of elevators in Korea exceeded 700,000, making it the eighth-class elevator powerhouse in the world, but there is a trend of increasing casualties due to accidents and breakdowns. An Seung-gang-gi is a term that encompasses an elevator that moves vertically and an escalator that moves horizontally. It is an important means of transportation for most citizens that are encountered almost every day in daily life, and it is also necessary as a means of transportation that enables the construction of skyscrapers. And it seems that its importance will never diminish in the future. Major elevator failures are the main cause of dispatch when accumulating the number of 119 dispatches, and the frequency of occurrence is high. It's a shame. According to Heinrich's Law, 300 minor signs and danger phenomena precede, 29 minor accidents and 1 major accident. Accidents caused by elevators are increasing every year due to the increase in the number of installations, and the damage is threatening the valuable lives and property of users and workers in related fields due to fatal risks such as death and serious injury. Elevator safety management can achieve its purpose only when it is managed with the usual interests, awareness of safety, and full efforts of the users, workers, and the government concerned. This study was analyzed based on 2019 data notified to the Korea Elevator Safety Agency on major breakdowns improved after the revision of the Elevator Safety Management Act in 2018, and a total of 8,256 data were analyzed using the SPSS 21 version, a statistical analysis tool, to analyze the correlation with technical statistics. Proceeded. Through the analysis, it was possible to obtain preventive safety management data to prevent serious elevator safety accidents from occurring, and to derive meaningful implications that related safety management and maintenance can be effectively operated to prevent serious failures. In addition, through this analysis, we expect the development of related industries and legal and institutional improvement.

가설구조물 안전성 확보 방안 연구 (Study on the Safety Assurance for the Temporary Structures)

  • 이정석;문성오;윤예빈;임남기;오태근
    • 한국안전학회지
    • /
    • 제33권1호
    • /
    • pp.73-80
    • /
    • 2018
  • According to the statistics publication of KOSHA, more than half of serious accidents at the construction sites were related to the temporary works and/or the temporary structures such as scaffoldings, shores, earth retaining walls, etc. The structural failures are occurred because of the overload acting on the structures or lack of performance of the one or more members of the structures. For the prevention of the collapse accidents relating to the temporary structures at the construction sites, we have to control construction processes not to occur the overload and also to control the performance and quality of each member of the temporary structures. MOLIT has amended the "Construction Technology Promotion Act" on Jan. 7th, 2015 to ensure the structural safety of the temporary structures. According to the Act, the designers of the construction design projects should check the structural integrity of the structures including the temporary structures and the construction companies have to let 'the Relative Professionals' confirm the structural integrity of temporary structures, the shores(${\geq}5m$ high) and the scaffolds(${\geq}31m$ high), before construction. Also, MOLIT has amended the "Regulation for Construction Technology Promotion Act" on Jul. 4th, 2016 for quality management and testing of temporary equipments. According th this regulation, the construction companies and supervisors should manage and test the temporary equipments before using them. In this paper, the standard drawings of the shores(< 5 m high) and the scaffolds(< 31 m high) and the amended "Business Guideline for Quality Management of Construction Work" are presented. As the result of this study, MOLIT noticed the amended "Business Guideline for Quality Management of Construction Work" on Jul. 1st, 2017.