• Title/Summary/Keyword: Construction Expenses

Search Result 293, Processing Time 0.025 seconds

A Study on the Escalation Method for Contract Adjustment Public Construction Project (물가변동에 따른 계약금액 조정방식의 지수조정율 산출에 관한 연구)

  • Bae Kyoung-Tae;Choi Dong-Soo;Hwang Chi Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.117-120
    • /
    • 2005
  • The business market of architecture has got a system that controls a deposit according to the price function. This system is written on a law of contract about countries. So the main body of construction has to make a reasonable contract. This study is written about a rate of numerical index on controling a deposit. We tried to fine problems and solutions of labor expenses, instrument costs and material costs which is so big and changable on the construction market Labor expenses are expressed according to the rate of construction scale between direct and indirect cost that applies ability of works. Instrument costs are expressed according to an output method of a unit price annually and a weight allowance of local instrument conditions and use frequence. The last material costs expressed according to a local weight allowance make a decision of the material cost index. They applies locally relative index more than absolute one on what uses the price rate of producers and importations. This solutions are not enough to apply to the real market, so it needs to exam and to be on the market after a feasibility study.

  • PDF

A study of urban FRT's Exterior Design (도시형 FRT Exterior Design 연구)

  • Kim, Seong-Nam;Kim, Sang-Joong;Kim, Chang-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1757-1764
    • /
    • 2004
  • It is the urgent task of induce the inhabitants to utilize the public transportation instead of the personal transportation to dissolve the traffic jam. But construction of the subway, the representative substitute means, demands a great of investment expense including various kinds of expenses. So the technical development and research of standardization of FRT(Fuel cell Rubber tired Train), the eco-friendly public transportation system low in construction expenses, effective, excellent in approach as well as in traffic, are propelled positively. This project wants to propose exterior design FRT in which original creative methods are utilized with the target of development and construction of FRT which coincide with anthropocentric eco-friendly traffic system. Utilizing the proposed style as the basic materials, this project wants to grasp difficulties, and to establish the way to solve and develop them.

  • PDF

A Study about the cost present condition through research on the actual condition the apartment houses expenses levy system - Focusing on the Apartment Complexes Cases in Seoul - (공동주택 관리비부과방식 실태조사를 통한 비용현황관리에 관한 연구 - 서울시 아파트 단지 사례를 중심으로 -)

  • Park Kyung-Mo;Kim Chang-Duk;Park Tae-Keun;Chon Jae-Youl;Kim Ok-Kyue
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.236-241
    • /
    • 2004
  • Now it is a difficult situation to compare the apartment houses expenses with the others because of showing the difference according to several facts such as the location, the time of completion, the number of households, the heating system and the management system. So tenants who do not know related information cannot know whether the management expenses which they are put to expense is fair or not. Therefore firstly, this study presents cost breakdown system with investigating and analyzing the management expenses levy system of the apartment locating the city of Seoul. Secondly, this deduces problems and presents a remedy with analyzing cost management business procedure.

  • PDF

A Study on complex waterproofing Method Using Part of Joint Watertightness Improved Sheet (접합부 수밀성 향상 시트를 이용한 복합방수 공법에 관한 연구)

  • Suh Woo-Il;Kim Su-Ryon;Kwak Kyu-Sung;Oh Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • v.y2004m10
    • /
    • pp.1-6
    • /
    • 2004
  • We ensure a flat and regular basic surface by using part of joint waterproofing improved sheet method applying the upper slab of a concrete structure. We solve the problem of getting loose scale the general sheet by waterproofing of the sheet and improving adhesive strength of the basic concrete. Also, waterproofing sheet union to problem of joint have solved using of insertion type method so that, it improved a watertightness. It has improved in resist impact, resist abrasion and it is the effect of shortened construction period and cutting down on construction expenses. Here are the special quality and superiority of this waterproofing research. (1) Level material has the super adhesive strength so that it makes the basic surface without the gab of waterproofing sheet and waterproofing layer with the string adhesive strength. (2) We unite the sheet with the joining part between sheets by waterproofing sheet joint using of method. (3) There is the effect of shortened construction period and cutting down on construction expenses without waterproofing of protection.

  • PDF

Investigation Study on Noise and Vibration Condition in Construction Site (건설공사장 소음.진동 실태조사에 관한 연구)

  • Sun, Hyo-Sung;Park, Young-Min;Jo, Youn-Hee
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2008.04a
    • /
    • pp.879-881
    • /
    • 2008
  • The construction noise and vibration is a serious social problem in the downtown. This results in many expenses and delays of construction process because of the satisfactory settlement of popular complaints. In this study, we analyze the dispute mediation cases on the damages of construction noise and vibration and the noise and vibration condition in construction sites by using questionnaire surveys.

  • PDF

The Life Expectancy Making Model for Construction Equipment (건설장비 수명결정 모델)

  • Lee, Yongsu;Kim, Cheol Min
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.453-461
    • /
    • 2012
  • Life analysis is conducted for economic analysis of equipment or facilities. The purpose of life analysis is to predict future indicators for scrapping construction equipment, and establish and utilize a wide variety of business strategies according to data predictions. First, this study shows the methods to figure out average life, life expectancy and life prediction of construction equipment and the analysis of life making methods, using survival curves. Second, the study proposes and examines the life expectancy making model depending on revenues and expenses. The result of the study reveals that the economic life of the same equipment varies with expenses, revenues and the initial cost. The life expectancy making model for construction equipment reflects respective management status for equipment and will help efficient management for companies.

A Study of CM(Construction Management) application method for exhibition facilities. (전시시설 건립을 위한 CM 적용방법에 관한 연구)

  • 문종승;임채진
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2001.05a
    • /
    • pp.39-44
    • /
    • 2001
  • An instance of domestic exhibition facility building case, the shortage of managing personal in construction resulted serious issue on expenses, times, quality, and safty with no satisfaction on its process and result. According to subject's speciality the CM's application methods are varied and because of its speciality, overall process of building an exhibition facility operating by its owner. This study intends to exam a application possibility of CM on exhibition facility construction to make smooth communication among varied area that following to exhibition facility construction.

  • PDF

An Analysis of the 2014 Pricing Guide for Technical Service Contracts through Comparison with Foreign Countries' Cases (해외사례 비교를 통한 2014년 개정 건설기술용역 대가기준 분석)

  • Lee, Taewon;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.152-164
    • /
    • 2015
  • Enhancing clarity and transparency of the pricing guide for technical services for public construction works enables the prediction and reimbursement of the service cost for project owners and bidders, while it would also yield benefits for engineers who carry out the construction tasks. In order to improve the global competitiveness of construction service industry, the government revised its pricing guide for techical services for construction works recently, moving away from its previous percentage-of-construction-cost method towards the Cost Plus a Fee Method. However, since the Cost Plus a Fee Method results in the rise of the service price by 153%~197%, there is the need for a review on the method and basis of the adjustment in order to avoid controversies regarding the application of the revised method. In this context, this paper analysed the 2014 revision of the pricing guide for technical services for public construction works through comparison with foreign cases including those of the US and the UK. The analysis yielded the conclusion that, while the shift towards Cost Plus a Fee Method which is widely used in advanced economies is a very meaningful change in large measure, certain aspects still remain problematic. Unlike in advanced economies, the detailed break-down shows the direct labor cost includes certain indirect expenses. Also, indirec expenses are admitted so comprehensively as to include overhead costs and technology royalties. These problems results in redundant estimation of certain expenses, and obstructs transparency in spending details. This paper proposes various improvement measures to address these issues.

Properties of Surface Grossing on the Design-Concreat by Developing of Design-Forms for Building Wall (건축물 벽체용 문양거푸집 개발을 통한 의장콘크리트의 표면광택 특성)

  • Oh, Jung-Keun;Gong, Min-Ho;Cho, Sang-Young;Jung, Keun-Ho;Jung, Sang-Jin;Jung, Jae-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.1
    • /
    • pp.131-138
    • /
    • 2003
  • Contemporary architecture calls for a wide range of surface textures and treatments. A surface compatible with the architect's design may vary from a glass-smooth finish to one requiring special sculptured ornamentation. These surfaces require many different types of form sheathing and lining. The purpose of study is development of new design form and made elaborateness shape. Architecture finish material not used expenses working hours, personnel expenses, architecture finish material cost. After this, building wall apply a variety shape in concrete surface and Easy to used in field.

The study on Analysis of Influence factors on Items in Apartment House Maintenance Cost (공동주택 관리비 항목별 영향요인 분석 연구)

  • Lim, Nam-gi;Park, Chan-jeong;Jung, Sang-jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.1
    • /
    • pp.155-162
    • /
    • 2002
  • In this research, I finally came to a conclusion analyzing the connection among managing of each items in management expenses, the size of each complex and stories, and the term of using. (1) In the managing cost regarding to the management manner, although the managing cost of self-governing management is less imposed than the one of commission management, there is slight difference between those Costs. And it is more important to consider the effectiveness of management than to emphasize reduction of management cost. (2) The higher the stories, the higher the managing cost of elevator per the unit area. It Is caused by the fact that the father the distance of the elevator operating, the higher the electric charges. (3) The third of one of total management cost goes to pay the personnel expenses. So I found that the effective management of the expenses is available to reduce management cost. (4) The higher the stones, the lower the cost of personnel expenses including the cleaner cost. (5) The sum of costs assigned in repairment and management increases in proportion to the term of using. The costs assigned in special repairment and management are interacting to each other. (6) To reduce the management cost, we have to cut down the personnel in security guard that occupies one third of total management cost with application to the joint security system and operation of the self-governing guard. Through this process, it will be easy to accomplish the rationalization of contract with an outside order. Because the improvement of management service is not only the responsibility of owner but also the one of dwellers. And it Is imperative to realize the importance of cooperation and trust between the owner and dwellers. And the establishment of effective managing system which has convenience and rationality must be settled without delay.