A STUDY ON DURATION ESTIMATE METHOD USING STOCHASTIC MODEL IN THE BIM ENVIRONMENT

  • Jae H. Park;Seok H. Yun;Joon H. Paek
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1209-1215
    • /
    • 2009
  • Recently, Construction Projects are being much bigger and more complex. So the importance of Construction Planning and Management is increasing and increasing because of the Construction Projects is involved in a variety of construction-related subjects. Competitive of the Construction Industry decided Cost, Construction Duration and Productivity. But they were just focused on Cost Saving instead of Construction Duration and Productivity. However, they have to finish construction projects using minimum cost and duration with quality and function of required level for successful Construction projects. Thus, current high exchange rate and high period, it is clear to decrease construction cost and to do economic construction in huge Construction Projects and it means more advanced Construction Schedule Management needs for economic construction. But Construction Scheduling Planning, basic of Construction Schedule Management, adjusted contract period without Pre-Planning, just depending on experience and ability of Construction Engineer. Because of that, this study suggests new Duration Estimate Method using Stochastic Model in BIM Environment for advanced Construction Schedule Management. Existing Duration Estimate Methods are just modified wrong points of them or analyzed effective factors of construction schedule. However, New Duration Estimate Method is just consists of Stochastic Model and BIM Environment without existing Duration Estimate Methods. So, new method has creativity and specialty. After this research, it would be a great model in construction industry field.

  • PDF

Realization of Smart Greenhouse Cost Using Greenhouse Structural Code and Greenhouse Construction Estimate (온실구조기준 및 온실공사 품셈을 활용한 스마트 온실 단가 현실화 연구)

  • Lee, Chul-sung;Kim, Hyuk;Shin, Seung-wook;Park, Mi-lan
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.24 no.2
    • /
    • pp.29-36
    • /
    • 2022
  • This study analyzed the effects of building and greenhouse structural code on the structural design and the greenhouse construction cost. The over-design possibility of greenhouse was analyzed when building structural code was applied using standard smart greenhouse drawings. The possibility of decrease in greenhouse construction cost was investigated if the currently applied building structural code was replaced with greenhouse structural code. As a result of comparing the member sizes with the standard drawings, building structural code was designed with 13%~74% more steel than greenhouse structural code. When building construction estimate was replaced with greenhouse construction estimate, it was possible to reduce the total construction cost of the glass greenhouse by 17% and that of the vinyl greenhouse by 14%. Since there is no standard construction estimate suitable for greenhouses, the wage unit price is set excessively, and the construction cost of the smart greenhouse is increasing. In conclusion, it is necessary to establish greenhouse structural code and greenhouse construction estimate to lower the greenhouse construction cost.

Preliminary Study on the Construction of Database for BIM-based preliminary estimate. (BIM 기반 개산견적을 위한 DB구축 기초연구)

  • Jun, Kl-Hyun;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.291-292
    • /
    • 2012
  • Progress in the construction project, the estimated cost of the measure is very important. Use preliminary estimate cost data for the prediction of construction cost. But, preliminary estimate cost data a clear calculation, there is no way. it is rely on the historical data and the past construction data. As a result, a significant difference in the actual construction cost and the predicted cost of the problem occurs. In this study, taking advantage of BIM Cost Prediction for efficient and rapid preliminary estimate BIM for building database through the study preliminary estimate cost data.

  • PDF

Analysis of Road Construction Projects' Escalation under Historical Data-Based Estimate System in Jeju (실적공사비가 적용된 제주도 도로공사의 물가변동률 영향 분석)

  • Hong, Jeong-Ho;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.667-676
    • /
    • 2014
  • This study has conducted case studies in order to suggest alternatives to the historical data-based estimate system. Price fluctuation calculation methods based on historial cost indexes, standard estimate and construction cost indexes were applied to 9 road construction sites in Jeju for an analysis. As a result, in 5 construction sites (about 56% of 9 sites), the index control rate calculated based upon historical data-based estimate system was higher than that calculated based upon standard estimate and construction cost indexes. Thus the establishment of the requirements for the adjustment of contract price due to price fluctuation delays, which leads to a significant difference in price fluctuation amount. And, in an analysis of construction cost indexes, the indexes for road construction were used for calculating index control rate which ranges from 2.0 to 9.4 percent, indicating the time of construction amount and price fluctuation application has a significant influence on index control rate.

Consideration on the Creation of Construction Cost by Calculating the Quantity at the Planning Design Stage - Focusing on Construction Cost Management Vases and Work Methods - (초기 설계단계에서 개산 견적의 수량산출에 의한 건축공사비 작성에 대한 고찰 - 공사비 관리 사례 및 작업 방법을 중심으로 -)

  • Hyun, Dong-Myung;Jeon, SangHoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.329-330
    • /
    • 2021
  • The calculation of the correct construction value in the construction should be investigated after the quantity is calculated. In order to calculate the quantity requires a lot of cost and time, and the initial accurate quantity calculation is not possible. Therefore, in the planning step in order to successfully complete the project to demonstrate the practicality of the difference between the construction cost by the construction design by presenting a method for calculate the quantity through the estimate with the construction open, floor plan, surface view, section.

  • PDF

A study on the development of the construction project for the preliminary estimate based on a database of the BIM technique. (데이터베이스 중심의 BIM기반 개산견적을 위한 모델 개발)

  • Bae, Seong-Jae;Suh, Bong-Gyo;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.92-93
    • /
    • 2013
  • Recently, a technique based on BIM has been rapidly increased on the construction project. Task such as a calculation of supply easily is proceeded by the technique. Also, an quick and precise preliminary estimate is possible because this technique can be applied. To sum up, this study suggests that the preliminary estimate based on a database of the BIM technique is applicable for the early stage of the construction project.

  • PDF

A study on the estimate of construction management cost for public construction project in the CM for fee contract (정부공사 건설 사업관리 용역의 대가 산정에 관한 연구)

  • Chung J.-Young;Yoon Tae-Kwon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.3 s.21
    • /
    • pp.115-122
    • /
    • 2006
  • This study is aimed to get clear model for CM fee level in public construction project. For the practical use and main target, CM for fee contract only is assessed and analysed. Cost estimate by percentage of total contract sum and method based on the historical construction data have significant deficiency. An regression model and probabilistic model are suggested with 9 independent variables. In the case of limited work scope, an element based floor area model is suggested and concluded with fish-bone scheme.

A Study on the Changing Factors in Cost Estimate Standard for Reinforced Concrete Structure Maintenance (철근콘크리트 구조물 유지보수 공사비산정기준 개정요인에 관한 연구)

  • Song, Tae-Seok;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.315-316
    • /
    • 2021
  • The proportion of maintenance work has been increasing due to the recent aging of the infrastructure, but the standardized construction cost estimation standards are insufficient for this. In particular, reinforced concrete structures are being applied to many structures such as buildings and bridges, and various construction methods for maintenance of reinforced concrete structures are being developed and applied. In this study, we surveyed about the current status of the construction method for the maintenance work of reinforced concrete structures and analyze the factors of the revision of the construction cost estimate standard for the reinforced concrete structure maintenance.

  • PDF

A Study on the Model of Artificial Neural Network for Construction Cost Estimation of Educational Facilities at Conceptual Stage (교육시설의 개념단계 공사비예측을 위한 인공신경망모델 개발에 관한 연구)

  • Son, Jae-Ho;Kim, Chung-Yung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.91-99
    • /
    • 2006
  • The purpose of this study is propose an Artificial Neural Network(ANN) model for the construction estimate of the public educational facility at conceptual stage. The current method for the preliminary cost estimate of the public educational facility uses a single-parameter which is based on basic criteria such as a gross floor area. However, its accuracy is low due to the nature of the method. When the difference between the conceptual estimate and detailed estimate is huge, the project has to be modified to meet the established budget. Thus, the ANN model is developed by using multi-parameters in order to estimate the project budget cost more accurately. The result of the research shows 6.82% of the testing error rates when the developed model was tested. The error rates and the error range of the developed model are smaller than those of the general preliminary estimating model at conceptual stage. Since the proposed ANN model was trained using the detailed estimate information of the past 5 years' school construction data, it is expected to forecast the school project cost accurately.

Application of BIM on Quantity Estimate for Reinforced Concrete and Formwork

  • Cheng, Ying-Mei;Lin, You-Lun;Li, Cheng-Wei;Lin, Chi-Ting
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.227-231
    • /
    • 2015
  • The focus of this study is on the accuracy in quantity estimates made by BIM for materials needed during construction. BIM-Revit Architecture 2014 is utilized to establish the information for an actual case to conduct estimates for the amount of reinforced concrete and formwork needed. The actual case is with a total construction area of 5,438 square meters and a total floor area of 31,623 square meters. The building commenced in December 2012 and the major structure has been completed in 2014. It is a RC structure with 4 stories underground, 12 stories above and 3 roof floors. The result shows that both of the quantity estimates of reinforced concrete and formwork are higher than that of actual use in the case. The estimate of reinforced concrete is higher than that of actual use by 2.18%, while the estimate of formwork is higher than that of the actual use by 13.04%. The results indicate that the estimate of reinforced concrete made by BIM has high accuracy, but the accuracy of the formwork estimate still needs improvement.

  • PDF