• Title/Summary/Keyword: Construction Documents Phase

Search Result 37, Processing Time 0.019 seconds

A Study on the Necessity and Applicability of Interactive Electronic Technical Manual(IETM) for Construction Projects (건설분야 전자매뉴얼의 필요성 및 특성분석을 통한 실무적용성 연구)

  • Kang, Leen-Seok;Jung, Won-Myung;Kwak, Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.99-108
    • /
    • 2005
  • Interactive electronic technical manual(IETM) for construction projects means an electronic tool that regulations and specifications related to construction method or maintenance process ale described by electronic book type. It has a meaning of integrated information system that includes virtual reality(VR), 3D animation and image contents for representing real construction information so that user can easily understand the construction situation and maintenance process. The basic information and technical manuals of construction facilities are being written as paper documents in our construction industry. As the result, the information management in the maintenance phase of construction projects is inefficient, and maintenance cost is being increased. This study attempts to improve the lack of understanding about construction IETM through the analysis of necessity and unique function of construction IETM comparing with the IETMS in other industry, Finally, this study shows a scenario of construction IErM for mitigating natural disaster of construction facilities to verify applicability of IETM.

The Meaning of "modern style (hyundae-sik)" in Related Documents of the ROK Office in the 1950s (1950년대의 한국에서 신축 정부청사 관련 문건에 나타난 "현대식"의 의미)

  • Lee, Sumin;Woo, Don-Son
    • Journal of architectural history
    • /
    • v.27 no.5
    • /
    • pp.17-26
    • /
    • 2018
  • In 1961, the Republic of Korea's first newly-constructed government building was completed. The government building, as ROK office, was erected as a twin with the USOM office in Sejong-ro. The reason why the ROK office and the USOM office were erected as a twin building is that the two offices were part of Foreign Operation Administration's Seoul Buildings Project in 1954. Within the project, the FOA office and the ROK office were rarely separated, and naturally, the ROK office was built according to the US standards. The planning, design, and construction phases which led by the US government were involved in the US architecture, engineering-construction companies. Because those AEC companies were familiar with the US technology and standards. In the phase of construction, Korean companies took part in the process under the supervise of Vinnell Corporation. The US expected to transfer its 'modern' and 'developed' technology through this process. The completed ROK office was widely known as the 'modern style (hyundae-sik)' building, which was body forth as glasses and new facilities. These factors were what the US emphasized for exporting architecture. The modifier, 'modern style (hyundae-sik)', given to the ROK office in the 1950s was a synonym for any new feeling that had never been seen hitherto. The newness of the ROK office, the 'modern style (hyundae-sik)' building, was specified as materials and facilities that indicates modern technology while in the absence of adequate knowledge.

Uncertainty Factors affecting Bid Price from Pre-bid Clarification Document of Transport Construction Projects

  • Jang, YeEun;Kim, HaYoung;Yi, June-Seong;Lee, Bum-Sik
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.238-244
    • /
    • 2022
  • Civil projects are associated with many uncertainties because they involve a long duration, many resources, a large area, and many supply chains. Therefore, the price of a civil project is not simply proportional to the quantity and unit price of the item but has a variable value, including uncertainty risk. This study investigates the influence of the uncertainty factors in the pre-bid clarification document on bid price formation during the project bidding phase. To this end, civil projects from the California Department of Transportation (Caltrans) were used as research data. This study randomly selected fifty sample data from each of twelve counties from 2008-to 2020: six hundred. The authors observed that each project sample had 0 to n query cases due to uncertainty. Then, this study examined the project uncertainty cases and categorized them into the following four uncertainty factors: 'conflict' (UF1), 'impossibility' (UF2), 'lack' (UF3), and 'missing' (UF4). Under the extracting process, the cases are classified into four uncertainty factors. With the project not containing any uncertainty factors as a control group, the project containing these uncertainty factors was designated as an experimental group. After comparing the bidder's price, the experimental group's bid price was higher than the control group's. This result suggests that uncertainty factors in bid documents induce bidders to set a high bid price as a defense against uncertainty.

  • PDF

Restaurants settled and health management awareness of employees of the Health Education System (요식업 종사원의 보건교육 시스템의 정착 및 보건관리 인식제고)

  • Yun, Young-Hwa;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.1
    • /
    • pp.179-190
    • /
    • 2016
  • Awareness about health is still in short supply, sufficient research and investment is falling mothayeo made, the development of image and health technology for health compared to productivity enhancement technology behind the relative reality. Through the analysis and study of special measures and health education in the country catering to propose measures and methods for this. Current analyzed and summarized to find a special health and safety training relevant provisions appear in the national legislation. By analyzing the characteristics and to leverage to workers unearthed an in-depth awareness and issues for the institutions and laws. Survey research methods to analyze the documents and government publications and research through an Internet search. Survey Research conducted a self - survey on new knowledge and attitude toward the concessionaires to sanitation target, the attitude of the sanitary administration, attitudes to hygiene education and hygiene practice Conditions received health education carried out by catering Federation regularly. Health education is a systematic settlement system for the external reality of professional education. Health and health administrators to establish an organizational structure strengthening phase. Employers and health care workers are raising awareness. Employers have a responsibility to prevent industrial accidents. Consequently, special health education targeted construction workers changed to fit the content-driven information on the species and the proper arrangement of time "based health education" currently being conducted.

Constitution of Work Process for Apartment Renovation Project in Design Phase (공동주택 리모델링 설계단계에서의 사업수행 프로세스 구축)

  • Kwon, Won;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.167-175
    • /
    • 2007
  • A renovation project of apartment housing is generally divided into four stages: Project inquiry stage, planning and feasibility stage, design stage and construction stage. Currently, procedure and managerial technique for a remodeling project has not been systematically established so that many companies have difficulty in doing their business. In particular, the design stage in participant which a project managers, designers, residents and engineers is more complicate than the other stages in terms of roles and working procedure. The design documents can be found trial and error if it is not well managed. The insufficient design caused by lack of ability to efficiently utilize information obtained during the stage and inappropriate decision-making not only results in diverse problems in the construction stage but also makes people suspect satisfaction and reliability on the remodeling improvements. Therefore the design stage is very significant issue on the renovation project. As the consequence, the design stage of a remodeling project is so important that it should be carefully managed, and composite understanding of the process to be executed. To do this, we provide roles and responsibility of each participant in the design stage and analyze the process where information is utilized in design stage. The information is analyzed in terms of input, tool and output.

Improvement of Quantity Take-Off and BoQ through the LOD Criteria Analysis of BIM Models (BIM 모델 표현 수준(LOD) 분석을 통한 내역체계 개선방안 연구)

  • Choi, Hyunjun;Yun, Seokheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.89-97
    • /
    • 2019
  • Recently, BIM has been actively introduced in construction projects. In particular, the introduction of BIM in cost estimating process is expected to improve the accuracy and efficiency of the cost estimate. However, the quantity calculation and BoQ documents preparation process still require manual work. Although the BIM model may support quantification process, it is still problematic that the level of detail of the model must be very detailed to meet the items in BoQ. To address this, it is necessary to analyse the LOD criteria and to analyze the extent to which quantity can be computed according to the level of detail in the BIM model. For the analysis of LOD-based work items, the work item grades were divided into A,B, and C. In this study, the ratio and cost of each item that can be calculated at the LOD level in the detailed design phase are reviewed for each type of work, and the method for improving the quantity calculation using BIM is proposed. In the LOD 300 stage(Detailed design stage), the largest number of items in the class B, the major improvement class, are window and glass work. In addition, the most expensive type of work was analyzed by reinforced concrete work. In the future, it is necessary to suggest appropriate improvement way for items with high item ratios and items with high cost ratios. The results of this study are expected to be used as a BIM-based cost estimation or as basic data for improving the current BoQ system.

A Study on the Establishment of Rule-Based Modules for Automating the Design of Interior Finishes in Architectural Buildings (건축 내부 마감 자동 상세화를 위한 규칙 기반 모듈 구축 방안에 관한 연구 - 바닥, 벽 및 천장을 중심으로 -)

  • Ha, Dae-Mok;Yu, Young-Su;Koo, Bon-Sang
    • Journal of KIBIM
    • /
    • v.12 no.1
    • /
    • pp.42-54
    • /
    • 2022
  • BIM facilitates data transparency and consistency through three-dimensional parametric modeling and promotes the accurate managing and sharing of project information. In Korea, however, BIM-based detailed design of architectural interior finishes required during the Construction Documents phase increases the burden on architectural firms due to frequent design changes and manual workload. Therefore, the purpose of this study was to establish rule-based modules using parametric modeling that automates repetitive tasks that occur during the detailed design of interior finishing. Interviews with practitioners were conducted to analyze the major finishing elements. Of these floors, walls, and ceilings, which were the most rudimentary and common items, were selected as the subjects of the study. The modules developed in this study have two functions. One is to create new finish types, and the other is the automatic modeling of new types into rooms. For these functions, parameters that belonged to each finish and room element in a BIM model were analyzed and valid parameters directly used for parametric modeling were derived. Then, based on these parameters, rule-based modules for three elements, I.e., floors, walls, and ceilings were constructed with Revit Dynamo, and the effectiveness of the modules was verified with a pilot test. In conclusion, this study suggested a series of processes for automatic finishing to improve the efficiency of BIM-based architectural detailed design of finishes and to contribute in solving the chronic problems occuring during current design processes.