• Title/Summary/Keyword: Construction Data

Search Result 9,766, Processing Time 0.036 seconds

3D Scanning Data Coordination and As-Built-BIM Construction Process Optimization - Utilization of Point Cloud Data for Structural Analysis

  • Kim, Tae Hyuk;Woo, Woontaek;Chung, Kwangryang
    • Architectural research
    • /
    • v.21 no.4
    • /
    • pp.111-116
    • /
    • 2019
  • The premise of this research is the recent advancement of Building Information Modeling(BIM) Technology and Laser Scanning Technology(3D Scanning). The purpose of the paper is to amplify the potential offered by the combination of BIM and Point Cloud Data (PCD) for structural analysis. Today, enormous amounts of construction site data can be potentially categorized and quantified through BIM software. One of the extraordinary strengths of BIM software comes from its collaborative feature, which can combine different sources of data and knowledge. There are vastly different ways to obtain multiple construction site data, and 3D scanning is one of the effective ways to collect close-to-reality construction site data. The objective of this paper is to emphasize the prospects of pre-scanning and post-scanning automation algorithms. The research aims to stimulate the recent development of 3D scanning and BIM technology to develop Scan-to-BIM. The paper will review the current issues of Scan-to-BIM tasks to achieve As-Built BIM and suggest how it can be improved. This paper will propose a method of coordinating and utilizing PCD for construction and structural analysis during construction.

The method for the classification according to their kinds and the estimation of unit generation rate for promoting recycling of construction and demolition(c&d) debris (건설폐기물 재활용촉진을 위한 종류별 분류 및 발생원단위 산정 방안)

  • Lee, Hi Sun;Kim, Dong Sik
    • Journal of the Society of Disaster Information
    • /
    • v.4 no.1
    • /
    • pp.86-100
    • /
    • 2008
  • It is needed to classify the kinds of construction and demolition(c&d) debris to 6 catagories of waste concrete, waste asphalt concrete, waste wood, scraps, combustible waste and incombustible waste in order to properly do a separate discharge and to estimate unit generation rate in construction site. Also, in this case, the unit treating cost for mixed wastes should be applied with the unit treating cost for combustible waste. The construction standard materials estimation data is used for basic data for estimating unit generation rate. The mixed wastes in this data should be classified to waste wood, combustible waste and incombustible waste, and their ratio is obtained by using the unit generation rate of Asia Pacific Environment and Management Institute and Seoul Metropolitan Development Institute. The waste amounts generated from newly-built construction can be obtained from multiplying the loss rate by the amount of materials used from construction standard estimation data. Also, those from dismantling construction can be obtained by subtracting waste amount generated during newly-built construction from total input amount of materials in newly-built construction. Those in two cases can be used in construction site. It can be used for estimating the amount generated and establishing the treating plan in the case of setting up the policy of waste management and doing the environment impact assessment.

  • PDF

Enhancing Occlusion Robustness for Vision-based Construction Worker Detection Using Data Augmentation

  • Kim, Yoojun;Kim, Hyunjun;Sim, Sunghan;Ham, Youngjib
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.904-911
    • /
    • 2022
  • Occlusion is one of the most challenging problems for computer vision-based construction monitoring. Due to the intrinsic dynamics of construction scenes, vision-based technologies inevitably suffer from occlusions. Previous researchers have proposed the occlusion handling methods by leveraging the prior information from the sequential images. However, these methods cannot be employed for construction object detection in non-sequential images. As an alternative occlusion handling method, this study proposes a data augmentation-based framework that can enhance the detection performance under occlusions. The proposed approach is specially designed for rebar occlusions, the distinctive type of occlusions frequently happen during construction worker detection. In the proposed method, the artificial rebars are synthetically generated to emulate possible rebar occlusions in construction sites. In this regard, the proposed method enables the model to train a variety of occluded images, thereby improving the detection performance without requiring sequential information. The effectiveness of the proposed method is validated by showing that the proposed method outperforms the baseline model without augmentation. The outcomes demonstrate the great potential of the data augmentation techniques for occlusion handling that can be readily applied to typical object detectors without changing their model architecture.

  • PDF

A Study on Logistical Distribution Management and Safety in Thailand's Highway Work Zone: The case of Logistics Drivers

  • MAHASIRIKUL, Narongdet;AKSORN, Preenithi;SRINAVIN, Korb;NGOWTANASUWAN, Grit
    • Journal of Distribution Science
    • /
    • v.20 no.3
    • /
    • pp.23-31
    • /
    • 2022
  • Purpose: The purpose of this study is to analyze the Safety and Logistical Distribution Management system in Thailand's Highway Work Zone based on data from Logistics drivers. Accidents in highway construction zones have caused enormous casualties in Thailand yearly. Statistical data shows evidence of correlation between numbers of accidents and drivers' recklessness. Research design, data, and methodology: In this study, we conducted an in- depth interview with 414 logistics drivers and highway construction workers in Khon Kaen province, Thailand. The data was collected based on 63 questionnaires aiming at capturing factors contributing to the risk of safety and cause of accidents in logistic infrastructures such as Highway work zone. Results: The result reveals two significant factors affecting safety in highway work zone, which includes construction environment and safety management system. Moreover, the result shows that feeling of afraid and confused while driving within the construction zones significantly affecting driver's risk of having an accident. Conclusions: The findings of this study offer that a strategic planning and evaluation of the logistics drivers' satisfaction and construction workers' participation to mitigate highway accidents at construction zones and that drivers' knowledge and perception toward construction safety management plays a significant role in preventing highway accidents at the construction areas.

Development of Unique Registration Number System for Construction Site Integrated DB (건설 통합DB 구축을 위한 시공현장등록번호 체계 개발)

  • Hur, Youn Kyoung;Lee, Seung Woo;Yoo, Wi Sung;Kim, Sung Hwan;Sung, Yookyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.367-368
    • /
    • 2023
  • Kiscon, Seumteo, KONEPS and CSI are representative construction-related DBs. All four DBs are operated by the public. However, the characteristics of data are different depending on the purpose. Therefore, it is difficult to utilize integrated data and it is only used sparingly. Creating and sharing a unique key that can identify a construction site will enable integrated accumulation and management of construction-related data for various purposes. At this point, it is most efficient to assign a unique key based on KISCON. KISCOn data conforms to the construction site definition and covers most of the public, private, architectural and civil works. In addition, there is an advantage in that DB construction is performed in the construction situation, which is a relatively preceding process. In the future, it is necessary to create a practical construction site integrated DB through the production of an integrated key table containing linkage information of unique keys for site management, performance indicators, and statistics production.

  • PDF

A preliminary study of the construction project productivity data platform development (건설 프로젝트 생산성 정보 플랫폼 구축방안 기초연구)

  • Kang, Goune;Lee, Gyu;Lee, Kyo-sun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.296-297
    • /
    • 2018
  • Due to the decrease in infrastructure investment and stagnation of overseas construction, it is concerned the instability of the construction market. Enhancing the Korean construction competitiveness, productivity improvement could be the breakthrough. In addition, defining construction contents utilizing virtual reality technology is drawing attention along with the trend of the fourth industrial revolution technology development toward the labor productivity improvement. This study conducted a survey to figure out the present state of the productivity management in field and comprehend the factors influence on construction productivity for further Korean construction productivity data platform.

  • PDF

Optimal Implementation Strategies of Building Information Modeling for Construction Projects of LH

  • Lee, Ji-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.60-62
    • /
    • 2015
  • The BIM-based architectural design can be the optimal method to improve all sectors of construction industry and reduce environmental impact through digital technologies. The goals and effects of BIM needs in LH to be newly planned based on the experience of public sectors, which will ultimately contribute to maximization of effectiveness. Referring the excellent case in the UK, the current BIM standards according to maturity level 2 handle the contents related to modeling, collaborative data production, data management and assure BIM data have to be used from building construction to operation and maintenance of buildings. Therefore the strategy for the utilization of BIM for construction projects in LH consisted of three steps; first, the minimization of defects via BIM: second, strengthening the competitiveness of construction and asset management: third, upgrading the system of building production and maintenance control. After this trial, LH can accumulate know-how for building construction to be more costeffective and competitive.

  • PDF

Improvement Scheme on Green Construction Cost & Benefit through Analyzing Trends and Case Studies (해외사례조사를 통한 녹색건설 비용 및 편익 정보 체계의 개선 방향)

  • Kim, Won-Tae;Choi, Seok-In;Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.44-54
    • /
    • 2013
  • As a green construction is a world-wide hot issue, Korean government is also putting forth a multilateral effort into reducing energy usage with setting aggressive goal under green growth policy. It is essential to analyse cost raised from designing and building green construction and benefit derived from the built facility for the sustainable green construction. However, compared to advanced countries in terms of green construction, there is lack of data and a systematic way for data collection and analysis in Korea. Without analyzing the cost-benefit of green construction, investors will hesitate to put his/her money into green construction and we can not expect its growth in construction industry. In this paper, cost of green construction was defined and categorized. Through case studies and various reports on cost-benefit analysis in advanced green construction countries, problems in terms of data collection and analysis in domestic green construction sector and improvement ways were suggested. The results of this study will contribute in classification of cost and benefit of green construction, data collection in systematic way, and increasing the feasibility of green construction via appropriate analysis on cost-benefit of green construction.

Correlation Analysis between Inventory data and danger grade of Cut slope in Chungcheongdo (충청도 내 일반국도 절토사면의 현황자료와 위험도간의 상관성분석)

  • Kim, Jin-Hwan;Rhee, Jong-Hyun;Kim, Seung-Hyun;Lee, Jung-Yup;Koo, Ho-Bon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.980-983
    • /
    • 2008
  • KICT has been carrying out inventory research on the cut slopes of national roads. Inventory research results are basic data used in cut slope management system. Inventory data are classified by general status, cut slope characteristics and inspector opinion. Cut slope inventory data are utilized to figure out dangerous slopes and decide survey ranking of detailed safety diagnostication. This paper will draw dangerous cut slope and more important inventory data in Chungcheongdo via correlation analysis.

  • PDF

Ontology-based Facility Maintenance Information Integration Model using IFC-based BIM data

  • Kim, Karam;Yu, Jungho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.280-283
    • /
    • 2015
  • Many construction projects have used the building information modeling (BIM) extensively considering data interoperability throughout the projects' lifecycles. However, the current approach, which is to collect the data required to support facility maintenance system (FMS) has a significant shortcoming in that there are various individual pieces of information to represent the performance of the facility and the condition of each of the elements of the facility. Since a heterogeneous external database could be used to manage a construction project, all of the conditions related to the building cannot be included in an integrated BIM-based building model for data exchange. In this paper, we proposed an ontology-based facility maintenance information model to integrate multiple, related pieces of information on the construction project using industry foundation classesbased (IFC-based) BIM data. The proposed process will enable the engineers who are responsible for facility management to use a BIM-based model directly in the FMS-based work process without having to do additional data input. The proposed process can help ensure that the management of FMS information is more accurate and reliable.

  • PDF