• Title/Summary/Keyword: Construction Capacity

Search Result 2,805, Processing Time 0.031 seconds

Loading capacity evaluation of composite box girder with corrugated webs and steel tube slab

  • He, Jun;Liu, Yuqing;Xu, Xiaoqing;Li, Laibin
    • Structural Engineering and Mechanics
    • /
    • v.50 no.4
    • /
    • pp.501-524
    • /
    • 2014
  • This paper presents a type of composite box girder with corrugated webs and concrete filled steel tube slab to overcome cracking on the web and reduce self-weight. Utilizing corrugated steel web improves the efficiency of prestressing introduced into the top and bottom slabs due to the accordion effect. In order to understand the loading capacity of such new composite structure, experimental and numerical analyses were conducted. A full-scale model was loaded monotonically to investigate the deflection, strain distribution, loading capacity and stiffness during the whole process. The experimental results show that test specimen has enough loading capacity and ductility. Based on experimental works, a finite element (FE) model was established. The load-displacement curves and stress distribution predicted by FE model agree well with that obtained from experiments, which demonstrates the accuracy of proposed FE model. Moreover, simplified theoretical analysis was conducted depending on the assumptions which were confirmed by the experimental and numerical results. The simplified analysis results are identical with the tested and numerical results, which indicate that simplified analytical model can be used to predict the loading capacity of such composite girder accurately. All the findings of present study may provide reference for the application of such structure in bridge construction.

A Study on the Load Carrying Capacity and Energy Absorption Capacity of the Concrete Filled Steel Tube Column (콘크리트충전 강관기둥의 내력 및 변형 능력에 관한 연구)

  • Chung, Kyung Soo;Choi, Sung Mo;Kim, Dong Kyu
    • Journal of Korean Society of Steel Construction
    • /
    • v.9 no.1 s.30
    • /
    • pp.121-128
    • /
    • 1997
  • It has been reported by the existing papers that the ultimate load capacity and energy absorption capacity of the CFST column are considerably higher than those resulting from a simple addition of the capacities of the concrete and the steel tube. It is normally believed that the confined effect for the infilled concrete due to the hoop tension of steel at the parameter of cross sections can remarkably improve the ductility and energy absorption capacities of the CFST columns. This paper provides the results of a study on the load-carrying capacities and energy absorption capacities of the CFST columns, a numerical analysis method, i. e. N-M interaction curves and Moment curvature relationships. The numerical approaches are verified by comparing with the existing test results and the circular and square steel tube sections are selected to clarify the amount of confinement effects to improve the ultimate deformable capacity(a ultimate strain value) of the infilled concrete. Then, an adequate value of the ultimate strain of the infilled concrete and an equation of the ultimate capacity of the CFST column are suggested.

  • PDF

An Economical Efficiency Comparison for Extend Method of Container Terminal Yard Scale followed by the Call of the Mega Ship (초대형 컨테이너선박의 기항에 따른 컨테이너 터미널 장치장 규모 확대방안의 경제성 비교)

  • Song, Yong-Seok
    • Journal of Navigation and Port Research
    • /
    • v.33 no.5
    • /
    • pp.353-359
    • /
    • 2009
  • Most domestic container terminals are lack of container storage capacity compared to the throughput of container. The main reason is the difference between the theoretical capacity applied to the development of terminals and the real capacity of a berth Another reason seems to be the increase of the container crane in number per berth to match the need for the getting larger vessel, which is resulted from the increase of the berth capacity from the start. This study, therefore, aims to suggest the economic size of container yard by comparing the existing one. For this the berth capacity was recalculated, the required yard size derived considering up to 10,000TEU vessel and then cost comparison done.

Evaluation of ductility capacity of steel-timber hybrid buildings for seismic design in Taiwan

  • Chen, Pei-Ching;Su, I-Ping
    • Earthquakes and Structures
    • /
    • v.23 no.2
    • /
    • pp.197-206
    • /
    • 2022
  • Recently, steel-timber hybrid buildings have become prevalent worldwide because several advantages of both steel and timber structures are maintained in the hybrid system. In Taiwan, seismic design specification related to steel-timber hybrid buildings remains void. In this study, the ductility capacity of steel-timber hybrid buildings in Taiwanese seismic design specification is first proposed and evaluated using nonlinear incremental dynamic analysis (IDA). Three non-linear structural models, 12-story, 8-story, and 6-story steel-timer hybrid buildings were constructed using OpenSees. In each model, Douglas-fir was adopted to assemble the upper 4 stories as a timber structure while a conventional steel moment-resisting frame was designated in the lower part of the model. FEMA P-695 methodology was employed to perform IDAs considering 44 earthquakes to assess if the ductility capacity of steel-timber hybrid building is appropriate. The analytical results indicate that the current ductility capacity of steel moment-resisting frames can be directly applied to steel-timber hybrid buildings if the drift ratio of each story under the seismic design force for buildings in Taiwan is less than 0.3%. As a result, engineers are able to design a steel-timber hybrid building straightforwardly by following current design specification. Otherwise, the ductility capacity of steel-timber hybrid buildings must be modified which depends on further studies in the future.

The Development of Factor Model Based on Actual Work Cost for Golf Courses (골프장 공사의 실적공사비에 의한 개산견적모델 개발)

  • Park, Jong-Hyuk;Park, Hong-Tae;Jeon, Yong-Bae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.2
    • /
    • pp.620-627
    • /
    • 2010
  • This study for construction of golf courses is to present basic information and pattern of change of construction cost by looking at the capacity of construction, requiring time and other aspects. The propose of this study is to develop the model of brief cost expected by using cost index and analyzing the actual work cost data gathered in golf course construction industry in Korea. The equation used for the cost-capacity index in other to deliver the expected construction cost is followed next. The results of this study, by regression analysis for the information of 7 golf courses, it could be found the cost-capacity index n, such as 0.72 for whole construction, 0.67 for net construction.

An Analysis on the Vertical Load Bearing Behavior according to Construction Methods of a Environment-friendly Screw Concrete Pile for the Noise and Vibration-free Method (무소음.무진동 공법을 위한 환경친화적인 스크류콘크리트말뚝의 시공방법에 따른 연직하중지지거동 분석)

  • Kim, Dongchul;Choi, Yongkyu
    • Journal of the Korean GEO-environmental Society
    • /
    • v.14 no.6
    • /
    • pp.5-11
    • /
    • 2013
  • Because the regulation for a noise and a vibration in our country has been being reinforced more and more, a more environment-friendly pile construction method than a current low-noise and low-vibration method was needed for the close construction in the downtown area. In this study, the characteristics of a screw concrete pile method for noise and vibration-free method was explained, and it's vertical bearing capacity was studied in the base of the static pile load test data of the screw concrete piles. Constructed by two methody; a pre-digging shoe type construction method and a toe-jetting shoe type construction method. The vertical load bearing capacity of a screw pile constructed by the former was more about 70% than that of a screw pile constructed by the latter.

A Study on the Analysis of Construction Process for the Stressed-Arch System (Stressed-Arch 시스템의 시공 과정 해석에 관한 연구)

  • 김종범;윤종현;이경수;한상을
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2001.11a
    • /
    • pp.118-123
    • /
    • 2001
  • The objectives of this research are to verify the structural stability and estimate the resisting performance of Stressed-Arch system during the construction process. Full scale models are taken to obtain the objective shape by the Dynamic Relaxation Method. As a result, it measured more strain than yielding strain at the extreme fiber of top chord member on the crown, but it is shown that members have the sufficiently compressive resisting performance as well as a considerable strain recovery capacity under unloading. Therefore, it is confirmed that Stressed-Arch system apparently have sufficient range of the structural capacity, but it is required that the elasto-plastic behavior of this system must be verified more detailed by numerical analysis and experiments.

  • PDF

A Study on the Improvement of Wall Execution Method on Hanok (한옥 축부(軸部) 시공법 개선 연구)

  • Kim, Do-Kyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.7
    • /
    • pp.2670-2675
    • /
    • 2010
  • Wall of hanok is related to exterior, inner environment, and the period and cost of construction. This study analyzes traditional wall execution method and suggests improved one. The characters of the improved execution method are use of ready made goods, application of dry and prefabricated method and improvement of airtightness and insulation capacity etc. The result of this study needs production of pilot productions and tests of capacity. But this new method will be useful to save the period and cost of hanok construction.

A Study on the Traffic Flow Characteristic Analysis and Applicability of Work Zones (도로 공사중의 교통류 특성분석과 적용성에 관한 연구 -고속도로를 중심으로-)

  • Lim, Chae-Moon;Lee, Ju-Ho;Lee, Young-Woo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.5 no.4
    • /
    • pp.329-337
    • /
    • 2002
  • It is the actual condition that the increasing traffic delay and accident caused by inefficient management on various construction by occupying the roadways. Since almost roadway improvements are for the public convenient, negative effects by them are ignored. But now due to the increase of traffics demand and limitation of road supply, the positive management scheme and treatment plan on the constructions must be considered. Thus, to the extent of this study divides uninterrupted flow into freeways and the Highway, yielding the time spread between under construction and not, that is delay time, we build capacity and delay model in the change of traffic volume and occupying length.

  • PDF

Capacity evaluation of PC-slab composite actions for the railway steel plate girder according to an experimental construction (PC-Slab 합성 철도판형교 유도상화 시험부설에 따른 성능 비교평가)

  • Min, Kyung-Ju;Lee, Sung-Uk;Choi, Hyung-Soo;Woo, Yong-Keun
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.697-706
    • /
    • 2011
  • There are more than 800 railway steel plate girder bridges which are in use and the total length is approximately 50 km. Among these, it shall be pointed out that non-ballast rail systems which lay on wood sleepers are the most critical members. To strengthen this type of structures, mainly two methods have been applied. The first one is the most typical method which is to replace the girders with slab girder system or steel composite girders and to add ballast. It is not uncommon that the construction cost of substructure is more than ten time higher than that of superstructures and even in this case, the structural uncertainty for the substructures is not diminished. To resolve above mentioned problems, new method was developed to rehabilitate railway steel girder bridge by adding PC-slab using transport equipment. Using this method, substructure strengthen is rarely required because the additional weight to the bridge superstructure is only up to 1.0t/m. Also it was possible to save the construction cost by reducing construction duration and by simplifying the construction process. Experimental construction was performed for Jewon bridge and measurements were performed before and after construction to verify the bridge capacity.

  • PDF