• 제목/요약/키워드: Constructibility

검색결과 52건 처리시간 0.017초

A Production-Installation Simulation Model of Free-Form Concrete Panels

  • Lim, Jeeyoung;Lee, Donghoon;Na, Youngju;Lim, Chaeyeon;Kim, Sunkuk
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.401-404
    • /
    • 2015
  • Demand on free-form buildings is gradually increasing, yet owing to the difficulty of production-installation work, several problems occur in the construction phase upon construction of a building, including the increased cost and construction duration, and reduced constructibility. To solve these problems, a techonology to produce FCP using a CNC(Computerized Numeric Control) machine is developed. The technology is that the information of designed free-form buildings to the CNC machine is transferred, and the transferred information is used for RTM(Rod-Type Mold, the mold shaped by back-up rods) and PCM(Phase Change Material) shaping, and the shaped RTM and PCM have the role of molds to produce FCP. Construction duration and project cost are limited in building sites, so the efficiency of processes like production-installation of FCP for application of the technology is significant. Since it is almost impossible to change the production-installation process at the construction phase when they are established, process should be deliberately decided. Therefore, the purpose of the study is to propose a production-installation simulation model of free-form concrete panels, in aspect of PCM. This paper is establishing the process for production-installation of FCP, estimating time required by each construction type and proposing a time simulation model that changes according to various constraints based on the analyses. With the time simulation model, it will be possible to build a cost model and to review the optimal construction duration and project cost.

  • PDF

LRFD법에 의한 이중합성 박스거더 최대부모멘트 단면 휨 설계 (Flexural Design of Double Composite Box Girder over Interior Pier by LRFD Method)

  • 조은영;신동구
    • 한국강구조학회 논문집
    • /
    • 제19권6호
    • /
    • pp.737-749
    • /
    • 2007
  • LRFD 법을 이용하여 3경간 연속 이중합성 박스거더교의 부모멘트를 받는 내측 교각 위 단면을 설계하였다. 3경간 연속교의 최대경간은 80-120m를 고려하였으며 경간비는 1:1.25:1로 가정하였다. 설계 시에는 최대부모멘트를 받는 이중합성거더 단면의 강도한계상태, 사용성한계상태 및 시공성 검토를 고려하였다. 하부 보강콘크리트가 압축플랜지에 합성되기 전에는 압축플랜지의 좌굴을 검토하였으며 합성 후에는 좌굴이 방지된 것으로 가정하였다. 이중합성 박스거더의 하부플랜지 위에 타설하는 콘크리트의 두께에 따른 단면전체의 휨강성과 휨저항강도를 비롯하여 인장플랜지, 압축플랜지 및 복부판의 휨강도를 비교 분석하였다. 상부플랜지와 하부플랜지 단면적비가 이중합성 박스거더의 연성거동 및 휨응력 분포에 미치는 영향을 검토하고 적절한 단면적비를 분석하였다. 하부 보강콘크리트의 유무에 따른 소요 강재량을 비교한 결과, 이중합성 거더의 경우가 기존 단일합성 거더에 비해 15% 내외의 강재량 절감효과가 있는 것으로 분석되었다.