• Title/Summary/Keyword: Connection switch

Search Result 131, Processing Time 0.03 seconds

A Study on the Power and Smoke Characteristics for the Intake System Improvement using Air Conditioning System in a Diesel Vehicle (디젤 자동차의 에어컨 사용시 흡기계통 개선에 따른 출력 및 매연 특성에 관한 연구)

  • Youn, Y.C.;Kwon, K.R.;Pyeon, H.
    • Journal of Power System Engineering
    • /
    • v.15 no.6
    • /
    • pp.11-15
    • /
    • 2011
  • This study investigated the symptoms of the a reduction in output while driving on the road, or increasing of fumer out exhaust gas on inclined road while working air-conditioner in summer. Notice how the experiment in 2010, the Ministry of Environment(Chapter No. 2010-46), and how the vehicle emissions inspection was carried out. 2500cc Diesel cars used in the study were used and compare to output of engine, exhaust gas, inhalation temperature measurement Inhalation of cold air has not been supplied to all agencies when comparing the results when cold air intake temperature of the supply air-conditioning switch range control from 1 to 4, the temperature drops $98^{\circ}C$ to $78^{\circ}C$. At the momentum of switch level 4, output from 63ps to 66ps after the connection has increased 9.6 percent, the highest concentration of exhaust emissions were reduced by 42.8%. This research can contribute in part to the reduction of exhaust directly supply into the cooling air intake line, doing the output of diesel cars in the summer. In addition, construction equipment and machinery that are currently being used excluding the engine's intercooler cooling of the supply line via a separate output in the summer and help reduce exhaust emissions is expected.

Mode Switching Smooth Control of Transient Process of Grid-Connected 400 Hz Solid-State Power Supply System

  • Zhu, Jun-Jie;Nie, Zi-Ling;Zhang, Yin-Feng;Han, Yi
    • Journal of Power Electronics
    • /
    • v.16 no.6
    • /
    • pp.2327-2337
    • /
    • 2016
  • The mode-switching control of transient process is important to grid-connected 400 Hz solid-state power supply systems. Therefore, this paper analyzes the principle of on-grid and islanding operation of the system with or without local loads in the grid-connected process and provides a theoretical study of the effect of different switching sequences on the mode-switching transient process. The conclusion is that the mode switch (MS) must be turned on before the solid-state switch (STS) in the on-grid process and that STS must be turned off before the MS in the off-grid process. A strategy of mode-switching smooth control for transient process of the system is proposed, including its concrete steps. The strategy utilizes the average distribution of peak currents and the smooth adjustment of peak currents and phases to achieve a no-shock grid connection. The simulation and experimental results show that the theoretical analysis is correct and that the method is effective.

A Study on Restoration of the Multi-Link Failures in BSHR/2 Networks (BSHR/2 네트워크에서의 다중 선로 장애 복구에 관한 연구)

  • Han, Seong-Taek;Lee, Yeong-Gwan;Jang, Seong-Dae;Lee, Gyun-Ha
    • The Transactions of the Korea Information Processing Society
    • /
    • v.6 no.3
    • /
    • pp.722-728
    • /
    • 1999
  • When one link failure happens in BSHR/2 networks, it is possible to restore all traffics by following the ITU-T G.841 rules. However, when a node that is currently executing a ring switch receives a long-path ring bridge request for an higher priority, it shall drop its bridge and switch immediately, then enter full pass-through. Even through link connection between two nodes exists, it is impossible to restore the service. In this paper, when multi-link failures happen, the services through connected link can be restored by exchanging messages through DCC(Data Communication Channel). Partially reconstructing the ring map that is unable to restore services because of multi-link failures made it possible to restore these kinds of traffic pattenrs. This paper shows that the services through connected link can be restored by using proposed method.

  • PDF

A Study on Degradation Pattern of GIS Using Clustering Methode (군집화 기법을 이용한 GIS 열화 패턴 연구)

  • Lee, Deok Jin
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.31 no.4
    • /
    • pp.255-260
    • /
    • 2018
  • In recent years, increasing electricity use has led to considerable interest in green energy. In order to effectively supply, cut off, and operate an electric power system, many electric power facilities such as gas insulation switch (GIS), cable, and large substation facilities with higher densities are being developed to meet demand. However, because of the increased use of aging electric power facilities, safety problems are emerging. Electromagnetic wave and leakage current detection are mainly used as sensing methods to detect live-line partial discharges. Although electromagnetic sensors are excellent at providing an initial diagnosis and very reliable, it is difficult to precisely determine the fault point, while leakage current sensors require a connection to the ground line and are very vulnerable to line noise. The partial discharge characteristic in particular is accompanied by statistical irregularity, and it has been reported that proper statistical processing of data is very important. Therefore, in this paper, we present the results of analyzing ${\Phi}-q-n$ cluster distributions of partial discharge characteristics by using K-means clustering to develop an expert partial discharge diagnosis system generated in a GIS facility.

Architecture and Hardwarw Implementation of Dynamic GSMP V3 with Dynamic Buffer Management Scheme (동적 버퍼관리 방식의 Dynamic GSMP V3의 구조와 하드웨어 구현)

  • Kim, Young-Chul;Lee, Tae-Won;Kim, Kwang-Ok
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.38 no.8
    • /
    • pp.30-41
    • /
    • 2001
  • In this paper, the architecture of Dynamic GSMP V3(General Switch Management Protocol Version 3), an open interface protocol with resource management functions for efficient IP service on ATM over MPLS, is proposed and implemented in hardware. And we compare and analyze the proposed GSMP with the GSMP under standardization process in terms of CLR (Cell Loss Rate). We design the Slave block of the Dynamic GSMP V3 using SAM-SUNG SoG $0.5{\mu}m$ process, which performs functions for switch connection control in the ATM Switch. In order to compare difference performanaces between the proposed method and the conventional one, we conducts simulations using the minimum buffer search algorithm with random cell generation. The exponential results show that the proposed method leads to performance enhancement in CLR.

  • PDF

The development of industrial secure L2 switch and introduction example for management and security improvement of supervisory control network in purification plant (정수장 감시제어망의 관리와 보안개선을 위한 산업용 보안 L2스위치 개발 및 적용사례)

  • Kim, Yunha;Yu, Chool;Oh, Eun;Kim, Chanmoon;Park, Ikdong;Kim, Yongseong;Choi, Hyunju
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.33 no.5
    • /
    • pp.329-339
    • /
    • 2019
  • Recently, the advancement of information and communication technology(ICT) is expanding the connectivity through Internet of Things(IoT), and the media of connection is also expanding from wire/cable transmission to broadband wireless communication, which has significantly improved mobility. This hyperconnectivity has become a key element of the fourth industrial revolution, whereas the supervisory control network of purification plants in korea is operated as a communication network separated from the outside, thereby lagging in terms of connectivity. This is considered the best way to ensure security, and thus there is hardly any consideration of establishing alternatives to operate an efficient and stable communication network. Moreover, security for management of a commercialized communication network and network management solution may be accompanied by immense costs, making it more difficult to make new attempts. Therefore, to improve the conditions for the current supervisory control network of purification plants, this study developed a industrial security L2 switch that supports modbus TCP(Transmission Control Protocol) communication and encryption function of the transmission section. As a result, the communication security performance improved significantly, and the cost for implementing the network management system using Historical Trend and information of HMI(Human Machine Interface) could be reduced by approximately KRW 200 million. The results of this study may be applied to systems for gas, electricity and social safety nets that are infrastructure communication networks that are similar to purification plants.

Development of Silm Type ELCB For Airport Distribution Panel through Increased short Circuit Capacity (단락용량 증대를 통한 슬림형 공항 분전반용 누전 차단기 개발)

  • Joo, Nam-Kyu;Lee, Jong-Myong;Kim, Nam-Ho
    • Journal of Advanced Navigation Technology
    • /
    • v.16 no.2
    • /
    • pp.360-366
    • /
    • 2012
  • In the power distribution panel installed in airport or industrial facilities, MCCB has been used for main switch and ELCB for branch switch to perform human body and leakage-inducing fire protection as well as overcurrent and short circuit protection. Especially for the airport panel, increase in accident protection is needed for stable power supply due to rapid modernization with fast-growing users, higer capacity and diversification of equipment, the increase of power capacity and the breaker made slim is a main issue for now because the issue for installation space is standing out by making panel with two-row arrangement connection method, etc. due to a many use of branch ELCBs. In this thesis, we designed arc extinguishing mechanism, considered movement direction change of contact in mechanism design. Also, we designed the breaker to work stably in case of miniaturization of leakage detection circuit and reverse connection. We conducted short circuit test to verify its function and developed the breaker that can be improved protection against accidental current with slim size operating leakage function when reverse connection to help solve the problem in using space that is increasing in the airport distribution panel.

A New Method for Integrated End-to-End Delay Analysis in ATM Networks

  • Ng, Joseph Kee-Yin;Song, Shibin;Li, Chengzhi;Zhao, Wei
    • Journal of Communications and Networks
    • /
    • v.1 no.3
    • /
    • pp.189-200
    • /
    • 1999
  • For admitting a hard real-time connection to an ATM network, it is required that the end-새둥 delays of cells belong-ing to the connection meet their deadlines without violating the guarantees already provided to the currently active connections. There are two kinds of methods to analyze the end-to-end delay in an ATM network. A decomposed method analyzes the worst case delay for each switch and then computes the total delay as the sum of the delays at individual switches. On the other hand, an integrated method analyzes all the switches involved in an inte-grated manner and derives the total delay directly. In this paper, we present an efficient and effecitive integrated method to compute the end-to-end delay. We evaluate the network performance under different system parameters and we compare the performance of the proposed method with the conventional decomposed and other integrated methods [1], [3], [5]-[9].

  • PDF

New Three-Level PWM DC/DC Converter - Analysis, Design and Experiments

  • Lin, Bor-Ren;Chen, Chih-Chieh
    • Journal of Power Electronics
    • /
    • v.14 no.1
    • /
    • pp.30-39
    • /
    • 2014
  • This paper studies a new three-level pulse-width modulation (PWM) resonant converter for high input voltage and high load current applications. In order to use high frequency power MOSFETs for high input voltage applications, a three-level DC converter with two clamped diodes and a flying capacitor is adopted in the proposed circuit. For high load current applications, the secondary sides of the proposed converter are connected in parallel to reduce the size of the magnetic core and copper windings and to decrease the current rating of the rectifier diodes. In order to share the load current and reduce the switch counts, three resonant converters with the same active switches are adopted in the proposed circuit. Two transformers with a series connection in the primary side and a parallel connection in the secondary side are adopted in each converter to balance the secondary side currents. To overcome the drawback of a wide range of switching frequencies in conventional series resonant converters, the duty cycle control is adopted in the proposed circuit to achieve zero current switching (ZCS) turn-off for the rectifier diodes and zero voltage switching (ZVS) turn-on for the active switches. Finally, experimental results are provided to verify the effectiveness of the proposed converter.

Development of the Automatic Inlet (자동물꼬의 개발)

  • 정하우;이남호;김성준;최진용;한형근;김대식
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.37 no.1
    • /
    • pp.49-54
    • /
    • 1995
  • Three types of floating-type automatic inlet were developed for the purpose of reduc- ing farmer's working hours required for water management and saving irrigation water. The point of automation is to use a float within the inlet which is floated and sinked by the ponding depth of paddy field, Thus opens and closes the control gate of irrigation. Suitability of each inlet may depend on production cost, applicability to paddy field condi- tions, and feasibility to farmers, etc. The first model was composed of three parts : chamber for irrigation control gate, chamber for float controlled by ponding depth, and connection bar between the two parts. It was designed to open and close the control gate gradually as the ponding depth drops and rises to a certain level. The second model was designed to improve the weak point of the first model which is the imperfect-closing of gate when it approaches to the end of ir- rigation. A switch-spring was equipped above the connection bar for perfect opening and closing of gate when the ponding depth reaches to a certain level. The third model was designed by combining the two chambers, that is, cut in halves the inlet volume of the above two models. Magnets were equipped above the float for perfect opening and closing gate. The functional experiment for three developed inlets was successfully carried out and the rating curves were derived.

  • PDF