Evaluation of Resistance of Concrete-Face Rockfill Dam to Seismic Loading Using Shaking Table Test (진동대시험을 이용한 콘크리트 표면 차수벽형 석괴댐의 내진성능 평가)

  • Ha, Ik-Soo;Kim, Yong-Seong;Seo, Min-Woo;Park, Dong-Soon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1118-1125
    • /
    • 2005
  • In this study, seismic safety of CFRD(Concrete-Face Rockfill Dam) type "D" dam in operation is evaluated from the results of 1-g shaking table test using similitude laws. Model dam is made by similitude law considering the grain size of prototype dam component. After the model dam is impounded to the normal water level(N.W.L), it is excited by artificial earthquake wave corresponding to standard design respond spectrum of the "D" dam site. Displacement response behavior of the dam is examined through the measurement of vertical and horizontal displacement of dam crest. Also, amplification characteristics of acceleration with dam height is examined through the measurement of acceleration with dam height. Finally, the purpose of this study is to evaluate seismic safety of "D" dam in operation. From the results of acceleration measurement, it was found that acceleration of dam crest was amplified about 1.52 times compared to the acceleration of dam bottom and amplification phenomenon is outstanding at three quarters of dam height from the bottom of dam. From the analysis of displacement behavior, it was estimated that vertical displacement of prototype dam is 6.8cm (0.1% of dam height) and horizontal displacement 12.3cm(0.2% of dam height). These percentages is much lower than 1% of dam height(general stability criteria). Therefore, it was concluded that seismic stability of "D" dam against an estimated earthquake is guaranteed.

  • PDF

Compaction Characteristics of Zone-1 Material in Concrete Faced Rockfill Dam (콘크리트 표면 차수벽형 석괴댐의 Zone-1재료에 대한 다짐특성)

  • Yea, Geu-Guwen;Han, Sang-Hyun;Lee, Jae-Ho
    • Journal of the Korean Geosynthetics Society
    • /
    • v.6 no.2
    • /
    • pp.9-15
    • /
    • 2007
  • Bedding zone in CRFD (Concrete Faced Rockfill Dam) requires bearing capacity to support the concrete face slab uniformly. Also, shear strength which is a key factor in slope stability and impermeability which is to prevent a loss of soils in case of leakage of concrete slab face are needed. In this study, trial prototype construction for bedding zone in CRFD was performed to investigate the compaction characteristics of bedding zone according to the frequency of compaction, water contents and so on. As a results of series of field test, the compaction characteristics of bedding zone in CRFD was affected considerably by the depth of compaction layer and frequency of compaction.

  • PDF

A Study on the Influence Factors on Crack Properties of CFRD Face Slab Concrete (CFRD 차수벽 콘크리트의 균열 특성에 미치는 각종 영향요인에 관한 연구)

  • 최세진;임정열;김완영;김무한
    • Journal of the Korea Concrete Institute
    • /
    • v.12 no.6
    • /
    • pp.109-117
    • /
    • 2000
  • CFRD(Concrete Faced Rockfill Dam) face slab concrete has a much capability to occur crack due to drying shrinkage, plastic shrinkage and bad compaction etc. Because of these cracks of concrete induce structural problem and decrease durability of dam, it is need to reduce crack of face slab concrete. This is an experimental study to analyze the influence factors on crack properties of CFRD face slab concrete. For this purpose, various mix proportion of CFRD face slab concrete and concrete using PPF(polypropylene fiber0 and fly ash was selected. And tests for drying shrinkage, bonding strength, water permeability and plastic shrinkage were performed, and then CFRD D and PPC of those mix proportion were placed in CFRD field. According to test results, it was found that the bonding strength of C1(compact sufficiently) was higher about 10~20% than that of C2(compact insufficiently). And the engineering properties of PPC(concrete using PPF) and FAC(concrete using fly ash) were better than those of the others ; the permeability of PPC and FAC after 8 weeks curing was little lower than that of CFRD D, and plastic shrinkage crack of PPC and FAC was lower 40~60% than crack of CFRD D.

Prediction of the Seepage Rate of Concrete Face Rockfill Dam (콘크리트 표면차수벽형 석괴댐의 침투량 예측 분석)

  • Choi, Chill-Yong;Kim, Min-Tae
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.10
    • /
    • pp.19-26
    • /
    • 2023
  • This research aimed to predict the seepage rate in the base rocks of a concrete face rockfill dam (CFRD) by conducting numerical analysis under various conditions. We examined the relationship between basic grouting and seepage, emphasizing the significance of the permeability coefficient of the grouting material and the rock. Moreover, we observed a decrease in seepage with an increase in the cross-sectional area of the dam. The results of this study provide essential input factors and outcomes of numerical analysis, incorporating various parameters, to inform the design phase. Additionally, our findings offer a dependable approach for calculating a reasonable seepage rate during both operational and maintenance phases.

Deformation Behavior of Existing Concrete-Faced Rockfill Dam due to Raising (증고에 따른 기존 CFRD 댐체의 변형거동)

  • Shin, Donghoon;Cho, Sungeun;Jeon, Jesung;Lee, Jongwook
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.6
    • /
    • pp.77-83
    • /
    • 2007
  • In this study, deformation behavior of existing concrete face rockfill dam, which is raised to a certain height to enhance storage capacity or to improve hydraulic and hydrologic stability, is examined using numerical analysis method. The results obtained from FEM analysis show a possibility that additional fill at downstram slope of existing CFRD dam body may lead undesirable deformations and stresses in existing dam body, especially in face concrete, such as settlements in upper part and bulging in lower part, excessive bending moments, and eventualy tensile cracks. Therefore, in designing multi-staged raising construction of CFRD, it is essential to consider deformations and stresses to be developed within and between exisiting dam body and added parts due to additional fill, and to prepare a proper measure to prevent abnormal deformations and stresses in the dam body including added parts.

  • PDF

Review on the Seismic Design Standards of Fill Dam (필댐의 내진설계기준의 비교검토)

  • 신동훈
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 1999.10a
    • /
    • pp.129-136
    • /
    • 1999
  • Several seismic design standards for fill dams adopted in Japan USA and Korea are reviewed in this study. The review on those standards is tried to provide a thinking way for a new seismic design standard which is urgently requested by the government I. e. the Ministry of Construction & Transportation and the Ministry of Science & Techniology. This study suggest that as a new seismic design standard of fill dam including concrete face rockfill dam(CFRD) the modified earthquake intensity method based on dynamic analysis be adopted in Korea while the dynamic analysis method should be used in evaluatiing the performance of fill dams precisely.

  • PDF

An Experimental Study on the Basic Properties and the Control Properties of Crack for Face Slab Concrete in CFRD (CFRD 표면 차수벽 콘크리트의 기본 물성 및 균열 제어 특성에 관한 실험 연구)

  • 우상균;송영철;원종필;윤영수
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.681-686
    • /
    • 2001
  • The purpose of this study is to provide the optimum mix design of concrete to be placed at the face slab concrete in CFRD(Concrete Faced Rockfill Dam) for pumped storage power plants. The basic performance tests including compressive strength, modulus of elasticity, flexural strength and the control properties of crack including plastic shrinkage, drying shrinkage were conducted for concrete using fly ash and polypropylene fiber. From this study, the fly ash concrete represented the better results in the aspects of basic performance, control properties of crack and economy than ordinary portland cement concrete. Especially the concrete mix design containing 20% of fly ash is recommended to be applied in the construction of the face slab concrete in CFRD for pumped storage power plants.

  • PDF

An Experimental Study on the Control Property of PlasticShrinkage Crack for CFRD Face Slab Concrere (CFRD 차부벽콘크리트의 수성수축균열 제어특성에 관한 실험적 연구)

  • 김완영;최세진;원종필
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.04a
    • /
    • pp.118-121
    • /
    • 2000
  • CFRD (Concrete Faced Rockfill Dam) face slab concrete has a much capability to occur crack due to drying shrinkage, hydration heat and bas compaction etc. Because of crack of concrete induce structural problem and decrease durability of concrete, it is need to reduce crack of concrete. This is an experimental study to analyze the Control Property of Plastic Shrinkage Crack for CFRD face slab concrete. For this purpose, it was investigated and analyzed the engineering properties of plain concrete and using admixtures (polypropylene fiber, fly-ash) according to test result As the result, it was found that crack width and area of concrete using admixtures less than of plain concrete.

  • PDF

An Experimental Study on the Effect if Fiber Reinforced on CFRD Face Slab Concrere (CFRD 차수벽콘크리트에서의 섬유보강효과에 관한 실험적 연구)

  • 최세진;임정열;김완영;김무한
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.04a
    • /
    • pp.122-125
    • /
    • 2000
  • CFRD (Concrete Faced Rockfill Dam) face slab concrete has a much capability to occur crack due to drying shrinkage, hydration heat and bas compaction etc. Because of crack of concrete induce structural problem and decrease durability of concrete, it is need to reduce crack of concrete. This is an experimental study to analyze the effect of fiber reinforced on CFRD face slab concrete. for this purpose, it was investigated and analyzed the engineering properties of plain concrete and polypropylene fiber reinforced concrete (PFRC) according to test result ; the test include slump, air content, compressive strength, tensile strength, drying shrinkage and permeability etc. As the results, it was found permeability and drying shrinkage of PFRC less than that of plain concrete.

  • PDF

Numerical Simulation for Evaluation the Feasibility of Using Sand and Gravel Contaminated by Heavy Metals for Dam Embankment Materials (중금속으로 오염된 사력재의 댐축조 재료 활용 가능성 평가를 위한 수치 모델링)

  • Suk, Hee-Jun;Seo, Min-Woo;Kim, Hyoung-Soo;Lee, Jeong-Min
    • Economic and Environmental Geology
    • /
    • v.40 no.2 s.183
    • /
    • pp.209-221
    • /
    • 2007
  • Numerical analysis was performed to investigate the effect of heavy metal contamination on neighboring environment in case a dam is constructed by using rockfill materials contaminated by heavy metals. The numerical simulation carried out in this research includes both subsurface flow and contaminant transport in the inside of the CFRD(Concrete Faced Rockfill Dam), using two commercial programs, SEEP2D and FEMWATER. The three representative cases of scenarios were chosen to consider a variety of cases occurring in a dam site; (1) Scenario 1 : no crack in the concrete face slab, (2) Scenario 2 : a crack In the upper part of face slab, and (3) Scenario 3 : a crack between plinth and face slab in the lower part of face slab. As a result of seepage analysis, the amount of seepage in scenario 2 was calculated as $14.31\sim14.924m^3/day$ per unit width, corresponding to the 1,000 times higher value than that in other scenarios. Also, in the simulation of contaminant transport by using FEMWATER, specified contaminant concentration of 13 ppb in main rockfill zone was set to consider continuous leakage from the rock materials. Through the analysis of contaminant transport, we found that elapsed times to take for the contaminant concentration of about 2 ppb to arrive at the end of a dam are as follows. Scenario 1 has the elapsed time of 55,000 years. In Scenario 2. it is 50 years. Finally, scenario 3 has 27,000 years. The rapid transport of the contaminant in scenario 2 was attributed to greater seepage flow by 500 times than other scenarios. Although, in case of upper crack in the face slab, it was identified that the contaminant might transport to the end of a dam within 100 years with about 2 ppb concentration, however, it happened that the contaminant was hardly transported out of the dam in other scenarios, which correspond to either no crack or a crack between plinth and face slab. In conclusion, the numerical analysis showed that the alternative usage of the contaminated sand and gravel as the dam embankment material can be one of the feasible methods with the assumption that the cracks in a face slab could be controlled adequately.