• 제목/요약/키워드: Complex Construction Method

검색결과 588건 처리시간 0.026초

Construction sequence modelling of continuous steel-concrete composite bridge decks

  • Dezi, Luigino;Gara, Fabrizio;Leoni, Graziano
    • Steel and Composite Structures
    • /
    • 제6권2호
    • /
    • pp.123-138
    • /
    • 2006
  • This paper proposes a model for the analysis of the construction sequences of steel-concrete composite decks in which the slab is cast-in-situ for segments. The model accounts for early age shrinkage, such as thermal and endogenous shrinkage, drying shrinkage, tensile creep effects and the complex sequences of loading due to pouring of the different slab segments. The evolution of the structure is caught by suitably defining the constitutive relationships of the concrete and the steel reinforcements. The numerical solution is obtained by means of a step-by-step procedure and the finite element method. The proposed model is then applied to a composite deck in order to show its potential.

Study on the calculation methods to determine the scale of the sponge city facilities in residential area----- taking Shenzhen as an example

  • Liu, Jian;Dong, Min;Han, Yu-ting;Wu, Lingyi
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.337-345
    • /
    • 2017
  • The sponge city construction is being carried out in China, and how to reasonably determine the scale of the sponge city facilities is a key point that the planners and designers should seriously solve. In this paper, taking determination of the sponge city facilities in a residential building in Shenzhen as an example, the layout and scales of the rainwater tanks, raingardens, ecological roofs and permeable pavements are decided by using the volumetric method and stormwater management model (SWMM). The calculated results by the two methods are compared and analyzed. The results show that the scales of the sponge city facilities determined by the two methods are almost the same, and it means that any method can be used to determine the scale of sponge city facilities. The volumetric method is relatively simple, and it is suggested to use to determine the scale of sponge city facilities during planning stage. While SWMM is more complex and requires a lot of input conditions, but it can provide the reduction effects of the sponge city facilities for rainfalls with different recurrence periods. Therefore, SWMM is recommended to use the calculation of the hydrological process of the sponge city facilities during the design stage.

  • PDF

유전자 알고리즘과 콤플렉스법에 의한 고성능 유압휴즈의 최적 설계 (Optimal Design of a Quick-Acting Hydraulic Fuse using Genetic Algorithm and Complex Method)

  • 이성래
    • 드라이브 ㆍ 컨트롤
    • /
    • 제11권4호
    • /
    • pp.32-38
    • /
    • 2014
  • The hydraulic fuse, which responds to the suddenly increased flow on rupture of a line and shuts off the fluid flow, would prevent large spillage of liquid. The quick-acting hydraulic fuse, which is mainly composed of a poppet, a seat, and a spring, must be designed to minimize the leaked flow and to prevent high collision speed between the poppet and seat during fuse operation on a line rupture. The optimal design parameters of a quick-acting hydraulic fuse were searched using the genetic algorithm and the complex method that are kinds of constrained direct search methods. The dynamic behavior of a quick-acting hydraulic fuse was researched using computer simulations that applied the obtained optimal design parameters.

건설업 산업안전보건관리비 사용 실태조사 및 분석 (Analysis and Survey on Occupational Safety and Health Management Expenses in the Construction Industry)

  • 강성윤;오세욱;김창원;정기효
    • 대한안전경영과학회지
    • /
    • 제25권2호
    • /
    • pp.113-120
    • /
    • 2023
  • Occupational safety and health management expenses in the construction industry are statutory and separately included in the cost statement to prevent occupational accidents and health problems. The expenses are determined by multiplying the standard amount by the rate decided according to construction types and scales. However, the current expense appropriation method does not properly reflect the recent changes in the construction industry such as industry size, industry diversification, and social atmosphere about safety reinforcement. This study surveyed 1579 questionnaires in total and analyzed expense execution rate and proportion of each expense category. The expense execution rate was relative higher in complex construction (e.g., heavy construction = 126%, civil engineering = 125%) and long-period project (equal to or over 48 months construction = 133%) compared to general construction (98~116%) and short-period project (less than 48 months construction = 115%). The proportion of spending expenses was higher in the category of safety manager labor costs (25~52%), safety facility costs (22~40%), and personal protective equipment costs (10~25%). The analysis results of the study can be utilized in revising the standard expense appropriation method by reflecting the current usages of the occupational safety and health management expenses in the construction industry.

A Study on Optimal Duration Estimation for Construction Activity

  • Cho, Bit Na;Kim, Young Hwan;Kim, Min Seo;Jeong, Tae Woon;Kim, Chang Hak;Kang, Leen Seok
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.612-613
    • /
    • 2015
  • As a construction project is recently becoming large-scaled and complex, construction process plan and management for successful performance of a construction project has become more important. Especially a reasonable estimation plan of activity duration is required because the activity duration is directly related to the determination of the entire project duration and budget. However, the activity duration is used to estimate by the experience of a construction manager and past construction records. Furthermore, the prediction of activity duration is more difficult because there is some uncertainty caused by various influencing factors in a construction project. This study suggests an estimation model of construction activity duration using neural network theory for a more systematic and objective estimation of each activity duration. Because suggested model estimates the activity duration by a reasonable schedule plan, it is expected to reduce the error between planning duration and actual duration in a construction project. And it can be a more systematic estimation method of activity duration comparing to the estimation method by experience of project manager.

  • PDF

비틀림 초고층 프로토타입 모델에 대한 시공단계해석의 적용 (Applications of Construction Sequence Analyses to Prototype Models of Twisted Tall Buildings)

  • 최미미;김재요;엄태성;장동운
    • 한국전산구조공학회논문집
    • /
    • 제26권1호
    • /
    • pp.89-97
    • /
    • 2013
  • 비정형 초고층 건물의 계획 및 시공이 늘어남에 따라 이 연구에서는 프로토타입 모델에 대한 시공단계해석의 적용을 통하여 비정형 초고층 건물의 시공 중 구조적 거동을 분석하고자 하였다. 비틀림 초고층 건물을 대상으로 횡력저항시스템, 비틀림각도, 공법 조건에 따른 총 18개의 모델을 선정하였다. 횡력저항시스템으로는 다이아그리드 시스템과 가새튜브 시스템을 적용하였으며, 각 횡력저항시스템별로 $0^{\circ}$, $1^{\circ}$, $2^{\circ}$ 비틀림각도를 갖는 세 가지 평면 형태와 외곽 튜브와 내부 골조의 시공순서에 따른 세 가지 공법을 가정하였다. 시공 중인 초고층 건물의 구조적 성능은 시공단계해석의 횡변위 결과를 통하여 분석되었으며, 골조 공기와 최대 양중량과 같은 시공성능이 함께 비교되었다.

장항의 국민주택 건립 배경과 건축·도시적 특징 (Construction Background, Architectural and Urban Characteristics of National Housing in Janghang)

  • 박성신;정재욱
    • 대한건축학회논문집:계획계
    • /
    • 제35권12호
    • /
    • pp.127-136
    • /
    • 2019
  • National Housing in Janghang was built intensively from the mid 1970s to the early 1980s, and has become a collective complex at Jangma-ro and Shinchangdong-ro. This Company House is a typical building for employee welfare, at the same time shows modern industrialization and urbanization. In general, it forms a housing complex and serves as industrial town. Reflecting the characteristics of Janghang, the housing complex is called National House based on the supply method and is also classified French Styled House in terms of housing style. Although Janghang was one of small local administrative units, it pursued urban style with mini-2-story. It has the typical characteristics as follows: division of the owner's living space and rental room, and independent layout of restrooms and washrooms. House is transformed to accommodate residents' lifestyles, so National Housing Complex of Janghang has undergone various changes such as the replacement of spatial structures and exterior materials for 40 years after construction. National Housing in Janghang is a symbol of local identity and an important spatial asset that shows the urban and architectural characteristics and changes.

Stability evaluation for the excavation face of shield tunnel across the Yangtze River by multi-factor analysis

  • Xue, Yiguo;Li, Xin;Qiu, Daohong;Ma, Xinmin;Kong, Fanmeng;Qu, Chuanqi;Zhao, Ying
    • Geomechanics and Engineering
    • /
    • 제19권3호
    • /
    • pp.283-293
    • /
    • 2019
  • Evaluating the stability of the excavation face of the cross-river shield tunnel with good accuracy is considered as a nonlinear and multivariable complex issue. Understanding the stability evaluation method of the shield tunnel excavation face is vital to operate and control the shield machine during shield tunneling. Considering the instability mechanism of the excavation face of the cross-river shield and the characteristics of this engineering, seven evaluation indexes of the stability of the excavation face were selected, i.e., the over-span ratio, buried depth of the tunnel, groundwater condition, soil permeability, internal friction angle, soil cohesion and advancing speed. The weight of each evaluation index was obtained by using the analytic hierarchy process and the entropy weight method. The evaluation model of the cross-river shield construction excavation face stability is established based on the idea point method. The feasibility of the evaluation model was verified by the engineering application in a cross-river shield tunnel project in China. Results obtained via the evaluation model are in good agreement with the actual construction situation. The proposed evaluation method is demonstrated as a promising and innovative method for the stability evaluation and safety construction of the cross-river shield tunnel engineerings.

Knowledge-Based Model for Forecasting Percentage Progress Costs

  • Kim, Sang-Yong
    • 한국건축시공학회지
    • /
    • 제12권5호
    • /
    • pp.518-527
    • /
    • 2012
  • This study uses a hybrid estimation tool for effective cost data management of building projects, and develops a realistic cost estimation model. The method makes use of newly available information as the project progresses, and project cost and percentage progress are analyzed and used as inputs for the developed system. For model development, case-based reasoning (CBR) is proposed, as it enables complex nonlinear mapping. This study also investigates analytic hierarchy process (AHP) for weight generation and applies them to a real project case. Real case studies are used to demonstrate and validate the benefits of the proposed approach. By using this method, an evaluation of actual project performance can be developed that appropriately considers the natural variability of construction costs.

모듈러 구성법을 이용한 공작기계의 기본 구조설계 시스템 개발 (Development of a Basic Structure Design System for Machine Tools by Modular Construction Method)

  • 임동휘;김석일
    • 한국CDE학회논문집
    • /
    • 제5권2호
    • /
    • pp.136-143
    • /
    • 2000
  • The appearance of new machine tools with higher flexibility is in need of a basic structure design system for establishing the systematic and rationalized design and manufacturing procedures. In this study. the basic structure design system for machine tools is realized based on the modular construction method. Machine tools are represented as a whole and modular complex with the directed graph, and all possible structural configurations and codes of machine tools for satisfying the machining requirement are derived from the DNA data and connecting patterns of basic structural elements. Especially the structural configurations of machine tools are visualized by the solid modeling techniques and 3-D graphics techniques.

  • PDF