• 제목/요약/키워드: Combined Tube Extrusion

검색결과 6건 처리시간 0.021초

중공축 소재를 이용한 전후방 복합압출의 성형 특성 (Forming Characteristics of the Forward and Backward Tube Extrusion Using Pipe)

  • 김성현;이호용
    • 소성∙가공
    • /
    • 제14권9호통권81호
    • /
    • pp.772-778
    • /
    • 2005
  • This paper is concerned with the analysis of material flow characteristics of combined tube extrusion using pipe. The analysis in this paper concentrated on the evaluation of the design parameters for deformation patterns of tube forming, load characteristics, extruded length, and die pressure. The design factors such as punch nose radius, die corner radius, friction factor, and punch face angle are involved in the simulation. The combined tube extrusion is analyzed by using a commercial finite element code. This simulation makes use of pipe material and punch geometry on the basis of punch geometry recommended by International Cold Forging Group. Deformation patterns and its characteristics in combined forward and backward tube extrusion process were analyzed for forming loads with primary parameters, which are various punch nose radius relative to backward tube thickness. The results from the simulation show the flow modes of pipe workpiece and the die pressure at the contact surface between pipe workpiece and punch. The specific backward tube thickness and punch nose radius have an effect on extruded length in combined extrusion. The combined one step forward and backward extrusion is compared with the two step extrusion fer forming load and die pressure.

Numerical and Experimental Investigation on the Tube Forming in the Radial-Forward Extrusion

  • Ko Beong-Du;Jang Dong-Hwan;Choi Ho-Joon;Hwang Beong-Bok
    • International Journal of Precision Engineering and Manufacturing
    • /
    • 제6권2호
    • /
    • pp.26-33
    • /
    • 2005
  • In this paper, the tube forming by radial-forward extrusion is analyzed by numerical simulation and experiments. The paper discusses the effect of process variables such as gap height, relative gap width and die comer radius on tube forming. The influence of deformation patterns of flange in radial extrusion on forward extrusion for tube forming is investigated and summarized in terms of the maximum forming force and hardness variations along the extrusion path. Furthermore the external defects are shown experimentally during the forming operation. Based on finite element analysis in conjunction with experimental test in Al alloy, analysis is performed for important parameter combination in order to reduce forming defects. Eventually, the process parameters for safe forming are suggested in order to reduce the forming defects.

레이디얼-전방압출에서 튜브성형에 관한 해석 및 실험 (Numerical and Experimental Investigation on the Tube Forming in the Radial-Forward Extrusion)

  • 고병두;장동환;최호준;황병복
    • 한국정밀공학회지
    • /
    • 제20권12호
    • /
    • pp.168-175
    • /
    • 2003
  • In this paper, the tube forming by radial-forward extrusion is analyzed by numerical simulation and experiments. The paper discusses the effects of process variables such as gap height, relative gap width and die corner radius on tube forming. The influence of deformation patterns of flange in radial extrusion on forward extrusion for tube forming is investigated and summarized in terms of the maximum forming force and hardness variations along the extrusion path. Furthermore the external defects are shown experimentally during the forming operation. Based on finite element analysis in conjunction with experimental test in Al alloy, analysis is performed for important parameter combination in order to reduce forming defects. Eventually, the process parameters for safe forming are suggested in order to reduce the forming defects.

전방압출과 연계된 레이디얼압출의 성형특성에 관한 연구 (A Study on the Forming Characteristics of Radial Extrusions Combined with Forward Extrusion)

  • 장용석;황병복
    • 소성∙가공
    • /
    • 제9권3호
    • /
    • pp.242-248
    • /
    • 2000
  • This paper is concerned with the family of parts that generally feature a central hub with radial protrusions. Radial Extrusion is usually used in order to produce complex parts, which is combined with upsetting and/or forward and backward extrusion. Typical parts that fall into this category include cross pieces for universal joints, key-shaft type parts, tube fittings, and differential gears. In this paper, the forming characteristics of radial extrusion combined with forward extrusion is investigated by comparing the punch and mandrel loads. The design factors during radial extrusion combined with forward extrusion are applied to the simulation to see how much those factors have effect on the forming loads. The rigid-plastic FEM is applied to the simulation.

  • PDF

튜브 액압성형 공정에서의 터짐 현상 예측 (Bursting Failure Prediction in Tube Hydroforming Process)

  • 김정;;강성종;강범수
    • 한국자동차공학회논문집
    • /
    • 제9권6호
    • /
    • pp.160-169
    • /
    • 2001
  • To predict busting failure in tubular hydroforming, the criteria for ductile fracture proposed by Oyane is combined with the finite element method. From the histories of stress and strain in each element obtained from finite element analysis, the fracture initiation site is predicted by mean of the criterion. The prediction by the ductile fracture criterion is applied to three hydroforming processes such as a tee extrusion, an automobile rear axle housing and lower am. For these products, the ductile fracture integral I is not only affected by the process parameters, but also by preforming processes. All the simulation results show the combination of the finite element analysis and the ductile fracture criteria is useful in the prediction of farming limit in hydroforming processes.

  • PDF

En-masse retraction with a preformed nickel-titanium and stainless steel archwire assembly and temporary skeletal anchorage devices without posterior bonding

  • Jee, Jeong-Hyun;Ahn, Hyo-Won;Seo, Kyung-Won;Kim, Seong-Hun;Kook, Yoon-Ah;Chung, Kyu-Rhim;Nelson, Gerald
    • 대한치과교정학회지
    • /
    • 제44권5호
    • /
    • pp.236-245
    • /
    • 2014
  • Objective: To evaluate the therapeutic effects of a preformed assembly of nickel-titanium (NiTi) and stainless steel (SS) archwires (preformed C-wire) combined with temporary skeletal anchorage devices (TSADs) as the sole source of anchorage and to compare these effects with those of a SS version of C-wire (conventional C-wire) for en-masse retraction. Methods: Thirty-one adult female patients with skeletal Class I or II dentoalveolar protrusion, mild-to-moderate anterior crowding (3.0-6.0 mm), and stable Class I posterior occlusion were divided into conventional (n = 15) and preformed (n = 16) C-wire groups. All subjects underwent first premolar extractions and en-masse retraction with preadjusted edgewise anterior brackets, the assigned C-wire, and maxillary C-tubes or C-implants; bonded mesh-tube appliances were used in the mandibular dentition. Differences in pretreatment and post-retraction measurements of skeletal, dental, and soft-tissue cephalometric variables were statistically analyzed. Results: Both groups showed full retraction of the maxillary anterior teeth by controlled tipping and space closure without altered posterior occlusion. However, the preformed C-wire group had a shorter retraction period (by 3.2 months). Furthermore, the maxillary molars in this group showed no significant mesialization, mesial tipping, or extrusion; some mesialization and mesial tipping occurred in the conventional C-wire group. Conclusions: Preformed C-wires combined with maxillary TSADs enable simultaneous leveling and space closure from the beginning of the treatment without maxillary posterior bonding. This allows for faster treatment of dentoalveolar protrusion without unwanted side effects, when compared with conventional C-wire, evidencing its clinical expediency.