The prevalence of diabetes and its related morbidity and mortality are being increased. Despite the advancement of evidence-based pharmacotherapy in the management of diabetes, many patients in our country do not achieve satisfied therapeutic outcomes. Pharmaceutical care service can be defined as a patient-centered clinical service provided by pharmacists to improve therapeutic outcomes and quality of life of patients, by identifying, and preventing or resolving drug-related problems (DRPs). Pharmaceutical care service is interdisciplinary team-based practice, and is provided through collaborative practice agreement (CPA) between one or more physicians and pharmacists. This article describes a model of pharmaceutical care service which can be adopted in our country for patients with diabetes in the ambulatory care settings. With the successful implementation of this service, clinical, economic, and humanistic outcomes of patients will be improved. Therefore, by actively implementing pharmaceutical care service, pharmacist should contribute to the promotion of patients' health and to the advancement of health care delivery system.
Recently world industry trends is moved from manufacturing to service. As a result product-market ideology is central to the service enabler of the service. And value creation and delivery of consumer-oriented services as the core design industry is gaining popularity abroad. But the Service design to dispose of the whole process from planning to be done systematically is not yet established a clear concept. This study suggested problems of the current service design industry, service plans and strategies for the development of service design through open questionnaire and FGI(Focus Group Interview) for using service model methodology which is presented by HyeogIn Kwon et al.(2010). And we also consider 27 kinds of developing challenges for service design industry innovation by 6 sectors, such as workforce, R&D, legal framework, lay the foundation, knowledge service and collaborative service.
KSII Transactions on Internet and Information Systems (TIIS)
/
제12권11호
/
pp.5323-5343
/
2018
Mobile applications and social networks tend to enhance the need for high-quality content access. To address the rapid growing demand for data services in mobile networks, it is necessary to develop efficient content caching and distribution techniques, aiming at significantly reduction of redundant content transmission and thus improve content delivery efficiency. In this article, we develop optimal cooperative content cache and distribution policy, where a geographical cluster model is designed for content retrieval across the collaborative small cell base stations (SBSs) and replacement of cache framework. Furthermore, we divide the SBS storage space into two equal parts: the first is local, the other is global content cache. We propose an algorithm to minimize the content caching delay, transmission cost and backhaul bottleneck at the edge of networks. Simulation results indicates that the proposed neighbor SBSs cooperative caching scheme brings a substantial improvement regarding content availability and cache storage capacity at the edge of networks in comparison with the current conventional cache placement approaches.
The 6th International Conference on Construction Engineering and Project Management
/
pp.15-18
/
2015
Front end planning is arguably the most impactful process in the successful delivery of capital projects. Organizations expend substantial effort in this planning process, intending to minimize risk and promote project success. This process has been well documented, including critical technical components, as well as the importance of team collaborative components. As organizations continue to pursue large projects with multi-national participation from sponsors, designers, contractors and suppliers, the importance of collaboration on a global scale during front end planning becomes more important, not less. This paper will outline research performed over the past two decades giving the basic components of the process and the value of global collaboration. It will provide guidance to project participants in pursuing successful planning.
The current challenge with which most shipyards are forced is to reduce the design time and the time-to-delivery because of explosive order of shipbuilding. Collaborative design and product data management have become important to reduce the lead time. Furthermore, enterprise information technologies such as ERP (Enterprise Resource Planning), SCM (Supply Chain management), and APS (Advanced Planning System) requires the collaborative environment. Also, manufacturing environment has been considered as a topic of strategic interest to get shorter product lifecycles in shipyards. Most shipyards have chosen an environment of ETO (Engineering To Order) strategy which designs and produces new products in response to various requirements of customer, rules and regulations. In the ATO (Assemble 10 Order) environment, most component parts have been designed to be procured or produced on the order requirement. The basic distinction between the ETO and ATO is the timing of the design. Thus in the ATO environment, it is more flexible in reducing the lead time to meet the specified requirements of customers. However, the ETO strategy requires new ship design process and ship product structures that are linked with the implementation of PLM. And, the function and architecture of current PLM solution has been designed based upon ATO environment properly. This paper presents the PLM architecture which effectively reflects the characteristics of shipbuilding. 4-layer architecture model is suggested to implement the PLM system. Also, implemented functions of ship PLM is explained in order to make a practical guidance for ship PLM implementation.
그룹간 공동 작업이나 화상 회의와 같은 그룹 통신의 수요가 늘어나면서 멀티캐스팅을 이용한 효율적인 데이타 전송에 대한 요구가 증가하고 있다. 특히 오디오나 비디오 데이타와는 달리 공동 문서 작업이나 그룹간 문서 전송을 위한 데이타 처리를 위해서는 어느 정도의 시간 손실이 있더라도 신뢰성을 보장할 수 있는 멀티캐스트 프로토콜이 요구된다. 그러나 멀티캐스트 전송에서의 신뢰성을 보장하기 위하여 손실 패킷에 대한 재전송 패킷이 전체 그룹으로 멀티캐스트 되는 것은 네트워크 상에 트래픽을 폭증시키는 요인이 된다. 이에 본 논문에서는 지역 그룹에서의 오류 회복을 위한 재전송 제한 기법을 제안하여 손실 패킷의 재전송 과정에서 발생하는 트래픽의 폭주를 제어하고자 한다. 이것은 재전송 패킷이 중복없이 다중 수신자에게 전송될 수 있도록 하여 그룹 내의 재전송 패킷의 양을 줄이고 필요없는 중복 패킷이 네트워크의 효율을 저하시키는 것을 방지하고자 하는 데 그 목적이 있다. Abstract As the size and the geographic span of communication groups increases, efficient data transmission schemes using Multicast service become more and more essential. Especially, unlike audio and video applications, for some collaborative applications and other data delivery components which require ordered and lossless delivery of data, Reliable Multicast Service is needed to ensure consistent presentation across multiple views. Thus error recovery by retransmission of loss data is provided in order to guarantee the reliability of multicast transmission protocol. However, redundant retransmission packets by multicast may cause traffic implosion on the Internet and it can be aggravated with continuous retransmission.This paper describes a Restricted Retransmission Mechanism as an error recovery method of multicast service in a local group, which can handle traffic implosion in retransmission process. It reduces redundant retransmission packets flowing into a local group and supports reliable multicast transmission. The goal of this mechanism is to reduce retransmission packets and decrease the load for group members and networks.
3D 가상공간이 협업을 지원하기 위해서는 관계자들 간에 직접적으로 의사를 표현할 수 있는 기술을 필요로 한다. 이때 의사표현으로 사용되는 Annotation은 내용표현이 쉽고, 빠를 뿐만 아니라 다양한 형태의 면에 대해서도 의미의 내용이 정확히 전달될 수 있도록 입력 가능해야 하고, 나아가 3차원의 의미를 지니는 내용에 대해서도 다양한 각도에서 이를 인식할 수 있도록 표현되어야 한다. 이 논문에서는 다양한 형태의 면에서도 입력이 가능한 Sketch-Box를 이용한 Sketch Annotation 기법을 제안하고 있으며, 이 Sketch-Box는 3D Annotation으로서 3차원의 의미를 지니는 내용도 효과적으로 전달할 수 있다.
The 9th International Conference on Construction Engineering and Project Management
/
pp.1154-1161
/
2022
Building Information Modelling (BIM) has evolved into a comprehensive, collaborative method in construction project delivery. Most industrialized and developed countries have made BIM mandatory in the government and public projects, whereas developing countries are embracing and catching up BIM technologies to improve their professional's abilities and reduce claims in the construction projects. However, BIM awareness and professional's competence have become critical in implementing BIM in infrastructure projects in Nepal, particularly hydropower projects. The objectives of this study are to find the BIM awareness among hydropower professionals in Nepal and assess their response. The study used a questionnaire survey to assess the awareness. The results showed that only few professionals (12 percentage in this study) are aware of BIM and its application in Hydropower infrastructures. Majority of the respondents (more than 50%) were interested in BIM trainings and believed BIM implementation in future projects. The study indicated that lack of BIM training and lack of BIM awareness were the top factors affecting BIM implementation in hydropower projects in Nepal. The findings showed that about 66 percent of the respondents who used BIM in their projects mainly used during construction phase. More than 80 percent believed that BIM should be mandated for the hydropower projects in Nepal. The findings presented in this study could promote awareness among different professionals, organization, and construction team and encourage BIM implementation in Hydropower projects. The findings could raise awareness of BIM in Nepal's infrastructure sectors and its invaluable benefits in construction.
The 9th International Conference on Construction Engineering and Project Management
/
pp.42-49
/
2022
In recent years, Owner, Architects, and Contractor are increasingly collaborating with each other from pre construction phase in construction projects, which is called Early Contractor Involvement (ECI). In Japan, the ECI method has been introduced in several public building projects since 2015. The purpose of this study is mainly to clarify the characteristics of the ECI method in Japan and to compare the contract clauses of the ECI method in the UK and the USA. The results of the survey are as follows. (1) the ECI method was supposed to make it possible to achieve appropriate quality, cost, and construction period by reflecting Contractor's technology and know-how in the design documents and specifications. (2) According to the database, there were 27 cases of the ECI method in Japan from 2015 to 2021, of which 13 cases for which bidding information could be obtained had a variety of technical proposals, mainly VE proposals, depending on the project characteristics. (3), Japan's ECI method has very much in common with SBC + PCSA in the UK. On the other hand, ECI Method in Japan differs from in the UK in that Owner, Architect, and Contractor enter into a partnership agreement, which is similar to ConsensusDocs CD541 in the USA. (4) The ECI method in Japan has the following problems: Owner depends on Contractor for cost control, the division of roles among project members is complicated, and more work from Owner than the DBB method are required.
Background: It was to describe collaborative educational efforts under Coronavirus disease 2019 period to advocate pharmacy-based immunization delivery and meet unmet needs of partnership institution using virtual learning platforms. Methods: A partnership was established among three pharmacy schools from two countries. The class content included the history of pharmacy immunization, pharmacists' roles and contribution to public health of the USA. The class also reviewed the value of pharmacists as frontline healthcare workers to foster student insights and the scope of pharmacy. The virtual class featured an interactive video simulation and small breakroom discussion besides a lecture. Results: Participants indicated that public accessibility to pharmacy and six-year education system in South Korea as advantages. However, legislative restrictions, pharmacist burden, and interprofessional disagreements were expressed as barriers to introduce the pharmacist immunization. Conclusion: A virtual learning platform was used to advocate for pharmacy-based immunization and fulfilled an unmet educational gap at a partnership institution.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.