• Title/Summary/Keyword: Clarifier

Search Result 80, Processing Time 0.02 seconds

Dewatering Filtrate Treatment with Center Well Depth of Secondary Clarifier in Small Sewage Treatment Plant (소규모하수처리시설의 이차침전조 내통길이 변화를 통한 탈수여액의 처리)

  • Choi, Jung-Su;Kim, Hyun-Gu;Lee, Dong-Ho;Joo, Hyun-Jong
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.35 no.10
    • /
    • pp.694-702
    • /
    • 2013
  • The purpose of this study is to evaluate a de-watering filtrate treatment and the possibility of securing biological treatment capacity by changing the structure of the secondary clarifier. Accordingly, the column test was conducted to determine the effect of polymer in the de-watering filtrate on sludge sedimentation. Also, the characteristics of de-watering filtrate processing was evaluated through batch test and continuous processing operation. The results showed that sludge settling velocity increased with higher polymer concentration, and that effluent SS concentration was found to decrease. Regarding processing characteristics of de-watering filtrate, the removal efficiency of TSS and TBOD5 increased as the length of secondary clarifier was longer. Also, comparing injections into anoxic tank and secondary clarifier, de-watering filtrate by continuous infusion treatment process showed stability in both conditions. Therefore, by modifying the structure of secondary clarifier, efficient processing of de-watering filtrate is expected to be possible and processing capacity of small sewage treatment plants is considered to be improved.

A Study on the Optimization of Sedimentation Efficiency through Controlling Stirring Speed and Baffle Angle (교반속도 및 Baffle 각도 조절에 따른 침전지 효율 최적화 연구)

  • Kwak, Sung-Keun;Kim, Choong-Gon
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.28 no.4
    • /
    • pp.69-75
    • /
    • 2020
  • This study was conducted to improve the solid-liquid separation efficiency of clarifiers. To do so, the study did a bio-flocculation experiment simply by controlling the stirring speed (rpm) and baffle angle of a clarifier on a lab scale, but without using a coagulant. For the purpose of the experiment, the feed wall of a clarifier was so improved that a baffle could be installed on the clarifier. Then, it was ensured to change its stirring speed (to 0.0rpm, 0.6rpm, and 1.2rpm), with the angle fixed at 10°. As a result, it was found that concentration efficiency increased by 2.0%, and effluent removal efficiency (SS concentration) by 7.8%, at a stirring speed of 0.6ppm. This indicates the bio-coagulation efficiency of sludge increased with changing stirring speeds. Then, the baffle angle of the sedimentation unit was changed to analyze how the changed baffle angle would affect the sedimentation of sludge. As a result, it was found that the compression of sludge interface was very effective at a baffle angle of 20°. It is hoped that these experimental findings will be useful in improving the sedimentation efficiency of circular clarifiers.

Removal Property of Taste and Odor Causing Material in Pulsator Clarifier (맥동식 침전지에서 맛·냄새 유발물질 제거 특성)

  • Jeong, Il Yong;Cha, Min Whan
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.1
    • /
    • pp.104-109
    • /
    • 2011
  • The removal efficiencies of 2-methylisoborneol (MIB) and geosmin were investigated to reveal removal characteristics of typical organic compounds causing disagreeable taste and odor at the conventional water treatment plant installed with pulsator clarifier patented by the French company $Degr{\acute{e}}mont$. The injection rate of Powdered Activated Carbon (PAC) into water was changed step wisely as we conducted jar tests in the laboratory and water treatment in the actual plant. 2-MIB concentration decreased linearly while geosmin did exponentially along with the injection rate of PAC at our jar tests. The removal efficiency of geosmin by PAC injection was considerably higher than that of 2-MIB. In the real pulsator clarifier, 2-MIB concentration started decreasing as the injection rate reached up to 10 mg/L of PAC. On the other hand, the concentration of geosmin in water decreased proportional to the injection rate of PAC. In the sand filtration, removal efficiencies of 2-MIB and geosmin on July were much higher than those on March. It was carefully suggested beforehand and found afterwards that general microorganisms notably existed in the sand filter with no chlorine in filter influent and backwash water and the sand filter biologically activated removed much more odor compounds. It was considered as the reason why the removal efficiency of 2-MIB and geosmin was increased. The microbial activity maybe increased in summer with water temperature rising and low filtration rate possibly increased contact time between odor compounds and general microorganisms.

Estimation on the Design Capacities of Residuals Treatment Facilities by the Quantity of Dewatered Sludge Generated from Water Treatment Plants (정수장에서 발생된 탈수슬러지의 량에 의한 배출수처리시설용량에 대한 평가)

  • Moon, Yong-Taik
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.18 no.6
    • /
    • pp.715-723
    • /
    • 2004
  • The quantity of residuals generated from water treatment plants depends upon the raw water quality, dosage of chemicals used, performance of the treatment process, method of sludge removal, efficiency of sedimentation, and backwashing frequency. Sludge production by the physical separation of SS occurs under quiescent conditions in the primary clarifier, where suspended solids are allowed to settle and to consolidate on the clarifier bottom. Raw primary sludge results when the settled solids are hydraulically removed from the tank. The relative solid and liquid fractions of a slurry are most commonly described by the solids concentration, expressed as mg/L or percent solids. The purpose of the present investigation is to estimate a suitability on the design capacities of residuals treatment facilities by the quantity of dewatered sludge generated from water treatment plants.

Analysis of the sludge thickening characteristics in the thickener using CFD Model (CFD를 이용한 농축조 슬러지의 유출흐름특성 해석)

  • Park, No-Suk;Moon, Yong-Taik;Kim, Byung-Goon;Kim, Hong-Suck
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.25 no.5
    • /
    • pp.777-782
    • /
    • 2011
  • The residual treatment facilities in WTP(water treatment plant) play an important role in solid-liquid separation. At present, it is difficult to solve problems related with thickening and dewatering of WTP sludge, and discharging waste water to river. The quantity of residuals generated from water treatment plants depends upon the raw water quality, dosage of chemicals used, performance of the treatment process, method of sludge removal, efficiency of sedimentation, and backwashing frequency. Sludge production by the physical separation of SS(Suspended Solid) occurs under quiescent conditions in the primary clarifier, where SSs are allowed to settle and to consolidate on the clarifier bottom. Raw primary sludge results when the settled solids are hydraulically removed from the tank. In this study, Drawing characteristics of the sludge thickening in the thickener of Water Treatment Plants was simulated by Using CFD(Computational Fluid Dynamics.

An assessment on feasibility of flotation as a secondary clarifier of an activated sludge process (생물반응공정에 대한 고액분리조로서 부상공정의 적용성 평가)

  • Chung, Chong Min;Kim, Yun Jung;Cho, Kang Woo;Lee, Sang Hyup;Hong, Seok Won;Chung, Tai Hak
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.22 no.5
    • /
    • pp.551-559
    • /
    • 2008
  • An experimental study was carried out to evaluate the potential of flotation process for the secondary clarifier of an activated sludge process. Flotation techniques, applied in this study, include electrofloation (EF) which generated fine bubbles smaller than $35{\mu}m$ in average and diffuser flotation (DF) which generated fine bubbles smaller than $55{\mu}m$ in average. The batch experiments were done with activated sludge displaying various characteristics. It was shown that the efficiency of solids/liquid separation was reduced as the diluted sludge volume index ($DSVI_{30}$) of activated sludge increased. The dependency, however, gradually decreased as the gas to solids (G/S) ratio increased. Thickening efficiency of EF was more than 2~10 times and DF process was more than 1.5~5 times as compared with gravity sedimentation (GS). Stable sludge blanket was maintained regardless of sludge settleability when the G/S ratio was 0.019 in the EF. On the other hand, Serious deterioration in the sludge blanket was observed in the DF depends on G/S ratio and sludge settleability. And For EF and DF, the suspended solids concentration of effluent was not nearly influenced on settleability of activated sludge and more clear than GS. A biological nutrient removal (BNR) process, combined with EF as a secondary clarifier was operated for three months. The mean MLSS (mixed liquid suspended solids) concentration in the reactor and mean solids concentration of return sludge were estimated to be 5,340 mg/L and 16,770 mg/L, respectively. The water quality of effluent was considerably stable and low value was accomplished, that was, standard suspended solids concentration $0.07{\pm}0.51mg/L$ and standard turbidity $1.44{\pm}0.56NTU$. The EF could be applicable for enhancement of efficiency of activated sludge system as well as improvement of the water quality of effluent.

Geochemical Reaction Processes and Controls on the Coal Mine Drainage using Pilot-scale Inclined Clarifiers (Pilot 규모의 경사판 침전지 시험을 통한 국내 석탄광산배수내 부유물질의 지구화학적 반응특성 및 조정영향)

  • Lee, SangHoon;Oh, Minah;Lee, Jai-Young;Kwon, Eunhye;Kim, Doyoung;Kim, DukMin
    • Journal of Soil and Groundwater Environment
    • /
    • v.18 no.7
    • /
    • pp.73-80
    • /
    • 2013
  • Fine suspended solids from coal mine drainage were treated in the treating plant, using two different pilot-scale inclined clarifiers: radial and lamella types. Suspended solids in the mine drainage were monitored along with other geochemical factors, and metal contents. Fe and Mn are the main chemical components in the drainage, which exist predominantly as total metal forms, whereas dissolved portion is negligible. The raw mine drainage is subject to physical and chemical treatment using $CaCO_3$ and NaOH, therefore the suspended solids are thought to be composed of Fe and Mn precipitates, possibly $Fe(OH)_3$, along with carbonate precipitates. The elemental composition of precipitates are confirmed by SEM-EDS analysis. As nearly all the dissolved ions were precipitated in the primary process by $CaCO_3$, no further aeration or prolonged oxygenation are of necessity in this plant. Adoption of inclined clarifier proved to be effective in treating fine suspended solids in the current plant. Successful application of the inclined clarifier will also be beneficial to improve the current treating process by excluding the current application of chemical agent in the first stage. The final effluents from the pilot plant meet the national standards and the low dissolved Fe and Mn contents are expected not to cause secondary precipitation after discharge.

Development and Application of a Computer Program for the Analysis of Heat Transfer and Fluid Flow of Water Body: Lake and Primary Clarifier (水體 熱流動 數値解析 프로그램 개발 및 응용 : 湖沼, 일차침전조)

  • 박병수;김경미
    • Water for future
    • /
    • v.29 no.6
    • /
    • pp.141-154
    • /
    • 1996
  • A computer program is developed in order to investigate the fluid flow and heat ransfer of a water body in a 2-D vertical rectangular coordinate. The specific purpose of this study is to obtain a physical insight of several fluid flow problems which occur in a lake and the water and wastewater treatment facility like a primary clarifier. The performance of computer program developed is successfully evaluated by the comparison of other two experimental and computational data in open literature : the first comparison is made against the numerical data associated with the cooling water discharge and the other is numerical and experimental works for the primary clarifier of Sarina City at Ontario. Further, the computer program is applied to investigate the feature of lake flow, say lake turnover, and 2-D vertical channel flow in terms of temperature, wind velocity and flow rate, etc. The computational results appear to be physically acceptable and consistent. The computer program developed in this study shows the possibility of the viable tool to figure out the flow characteristics of water reservoir.

  • PDF

Performance Evaluation of Advanced Municipal Wastewater Tretment by Phased Isolation Intrachannel Clarifier Ditch (침전지내장형 상분리 산화구공정에 의한 하수 고도처리특성 평가)

  • Hong, Ki-Ho;Chang, Duk;Han, Sang-Bae
    • Journal of Korean Society on Water Environment
    • /
    • v.20 no.6
    • /
    • pp.563-570
    • /
    • 2004
  • Phased isolation intrachannel clarifier ditch process developed in this study is an enhanced biological nutrient removal process employing two ditches with intrachannel clarifiers. Bench-scale phased isolation ditch process was used to evaluate the system performance on municipal wastewater and detailed assessment of internal behavior in a ditch and each reactions. When the system was operated at the HRTs of 6~12hours, SRTs of 9~31 days, and cycle times of 4hours, the system showed removals of BOD, TN, and TP as high as 88~97%, 73~78%, and 65~90%, respectively. The internal behavior were well matched on each reactions such as nitrification, denitrification, and phosphorus release and uptake. As the SRT became longer, TN removal increased gradually, whereas TP removal decreased contrarily. However, the system was capable of producing an effluent TP concentration 1mg/L or less even at longer SRTs except the case of solids discharge by malfunction of intra-clarifier occurred by its geometrical limit. The system performance slightly decreased by hydraulic shock loading(increasing of influent flowrate and decreasing of system HRT). However, the higher system performance could be achieved again after four cycles. Thus, the system reliability could be successfully achieved short-term hydraulic shock loading that occurred in medium- and small-sized wastewater treatment plants suffering fluctuation of influent quality and flowrate during wet season.