• 제목/요약/키워드: Claim for Damages

검색결과 91건 처리시간 0.023초

SGA에서 권리부적합에 대한 매수인의 구제권에 관한 연구 (A Study on the Buyer's Remedies in respect of Defects in Title under SGA)

  • 민주희
    • 무역상무연구
    • /
    • 제66권
    • /
    • pp.95-118
    • /
    • 2015
  • This study examines the Buyer's Remedies in respect of Defects in Title under SGA. As SGA divides contractual terms into a condition and a warranty, its effects regarding a breach of a condition or a warranty are different. Where a stipulation in a contract of sale is a condition, its breach may give rise to a right to treat the contract as repudiated and to claim damages. Where there is a breach of a warranty in a contract of sale, the aggrieved party may have a right to claim damages. Regarding a breach of a condition under SGA s 12(1), although the buyer may have his right to terminate the contract, he may lose that right when he accept or is deemed to have accept the goods by intimating his acceptance to the seller, acting inconsistently with the ownership of the seller, or retaining the goods beyond a reasonable time without rejecting them. Furthermore, the buyer may claim the estimated loss directly and naturally resulting from seller's breach. SGA contains the principle of full compensation and so the suffered loss and the loss of profit are compensable. As to specific performance under SGA, the court has been empowered to make an order of specific performance to deliver the goods in conformity with the terms of the contract and so it is not a buyer's right. This order should be made only where the goods to be delivered are specific or ascertained goods and the court must think fit to grant the order. However, among these remedies, the buyer cannot have the right to terminate the contract where there is a breach of warranty by the seller under SGA s 12(2).

  • PDF

계약 조항의 애매모호성에 의해서 발생되는 공기지연 클레임의 책임 당사자 확인 프로세스 (The Process of Identifying the Responsibility Party of Caused Delay Claim by Ambiguity of the Conditions of the Contract)

  • 이치주;권태욱;고훈석
    • 한국건축시공학회지
    • /
    • 제20권6호
    • /
    • pp.527-535
    • /
    • 2020
  • 본 연구에서는 EPC/턴키 프로젝트에서 발생 가능한 클레임의 주요 원인들을 발주자와 건설사의 관점에서 분석하였다. 그 원인들은 EPC/턴키 프로젝트의 표준 계약서인 FIDIC 실버 북을 기반으로 도출하였다. 발생 빈도가 가장 높은 클레임의 유형은 공기지연으로 분석되었다. 그 후, 가장 발생 빈도가 높은 클레임에 대한 책임이 계약 당사자간에 누구에게 있는지를 분석하는 프로세스를 제안하였다. 제안된 프로세스는 2010년에 수행한 2건의 대규모 EPC/턴키 프로젝트들과 FIDIC 실버 북의 공기지연 클레임에 관련된 계약 조항들을 기반으로 제안되었다. 제안된 프로세스는 발주자가 공사기간 지연에 대해 배상금을 설정하는지에 대한 의도에 따라 분류된다. 본 연구의 주요 기여도는 사례 프로젝트의 계약 조건을 기반으로 다양한 계약 유형에 적용할 수 있는 프로세스를 제안한 것이다. 뿐만 아니라, 계약서 작성 전에 발생 가능한 클레임의 유형을 확인할 수 있고, 공사기간 지연 클레임이 발생할 경우에 책임 당사자를 예측할 수 있으므로, 명확한 계약서 작성에도 기여할 수 있을 것이다.

정기용선계약에서 조기반선에 의한 손해배상의 범위에 관한 연구 (A Study on Scope of Damages resulted from Early Redelivery under Time Charter)

  • 한낙현
    • 한국항만경제학회지
    • /
    • 제24권2호
    • /
    • pp.19-41
    • /
    • 2008
  • 본 연구의 목적은 정기용선계약 하에서 조기반선에 의한 손해배상의 범위에 관해 쟁점이 된 Golden Victory호 사건을 중심으로 분석하는 것에 있다. 이 사건의 쟁점은 선주가 회수할 수 있는 손해배상의 금액과 관련된 것이다. 선주는 이라크전쟁은 이 클레임과는 무관하며, 손해배상은 용선요율과 용선계약상 잔존한 4년 동안의 전반에 대한 시황요율과의 차액에서 평가되어야 한다고 주장하였다. 한편 용선자는 계약위반 후에 발생한 전쟁으로 인해 계약은 그 시점에서 종료되었다고 할 수 있으므로 제33조에 따라 선주에 대한 손해배상의 범위는 이라크전쟁의 발생 시까지라고 주장하였다. 즉 이 사건에서 정기용선자에 의한 조기해제에 기초한 손해배상의무의 범위는 해제된 용선계약 중에서 해제사유의 발생 시까지로 하는 것이 충분하다고 판결된 사안이다.

  • PDF

영국 보험법 상 보험자의 보험금지급의무와 관련한 주요 쟁점 - 2015년 보험법 상 개정내용을 중심으로 - (Main Issues on the Insurer's Duty of Payment of Insurance Claim in English Insurance Law -Focused on the Revised Provisions in Insurance Act 2015 -)

  • 신건훈;이병문
    • 무역상무연구
    • /
    • 제76권
    • /
    • pp.125-145
    • /
    • 2017
  • Where an insurer has unreasonably refused to pay a claim or paid it after unreasonably delay, the existing law in England does not provide a remedy for the insured. Accordingly, the insured is not entitled to damages for any loss suffered as a result of the insurer's unreasonable delay. This legal position differs from the law in Scotland and most major common law jurisdictions. LC thought that the legal position in England is anomalous and out of step with general contractual principles. LC considered that a policyholder should have a remedy where an insurer has acted unreasonably in delaying or refusing payment of claim, and, therefore, recommended a statutory implied term in every insurance that the insurer will pay sums due within a reasonable time and breach of that term should give rise to contractual remedies, including damages. More detailed recommendations of LC are as followings. First, it should be an implied term of every insurance contract that, where an insured makes a claim under the contract, the insurer must pay sums due within a reasonable time. Secondly, a reasonable time should always include a reasonable time for investigating and assessing a claim. Although a reasonable time will depend on all the relevant circumstances, for example, the following things may need to be taken into account, that is, (1) the type of insurance, (2) the size and complexity of the claim, (3) compliance with any relevant statutory rules or guidance, and (4) factors outside the insurer's control. Thirdly, if the insurer can show that it had reasonable grounds for disputing the claim(whether as to pay or not, or the amount payable), the insurer does not breach the obligation to pay within a reasonable time merely by failing to pay the claim while the dispute is continuing. In those circumstances, the conduct of the insurer in handling the dispute may be a relevant factor in deciding whether the obligation was breached and, if so, when. Fourthly, Normal contractual remedies for breach of contract should be available for breach of the implied term to pay sums due within a reasonable time. Finally, In non-consumer insurance contracts, the insurer should be permitted to exclude or limit its liability for breach of the obligation to pay sums due within a reasonable time, unless such breach was deliberate or reckless, and such an insurer's right to contract out will be subject to satisfying the transparency requirements.

  • PDF

계약공사기간 연장에 의한 클레임 처리방안 (A Study on the Delay Claim in Construction Projects)

  • 노병옥;이상범;이호일
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2001년도 학술논문발표회
    • /
    • pp.93-98
    • /
    • 2001
  • If the construction delays are occurred during the project execution, the contractual parties should inquire the delay causes and the contractual obligation. Due to the compensation of damages, the interested parties and the contractual parties are placed on the adverse situation. For reasonable of the claim and dispute, the contractual parties are needed the objective and systematic procedure method to analyze the delay. The purpose of this study is to propose a formal process model considering the case of construction delay-claims.

  • PDF

배아연구와 불법행위책임 (Human Embryo Research and Tort Liability)

  • 서종희
    • 의료법학
    • /
    • 제12권1호
    • /
    • pp.227-255
    • /
    • 2011
  • Recently, many nations said "yes" to human embryonic stem cell research, signing an executive order to permit funding for the research in the mame of achieving health and life of humankind. Human Embryo Research is permitted by our Bioethics & Biosafety Act. But, illegal research cannot be divorced from civil liability since it requires the destruction of eggs of fertilized eggs and personal rights of embryo-creator. After all, though we allow to do research embryo, we should control the capacity of abuse of embryo research for embryo-creator. If research violate the law(Bioethics & Biosafety Act or Civil Law, etc), it comes to a delict by pecuniary loss and non-pecuniary loss. When it comes to pecuniary loss, Human Embryo is not body but special property. Supreme Court maintained a stance that mental suffering is generally deemed as compensable for damages for the loss of property where a person's property right is invaded by a tort or non-performance of obligation. Thus, where mental suffering occurs, which cannot be compensated by recovery of property losses, the situation must be a special circumstance and the injured could claim consolation money for such losses only if the offender knew or would have known of such special circumstances(Supreme Court Decision 96Da31574 delivered on Nov, 26, 1996, etc.). That is to say, Supreme Court regards mental suffering through person's property right invaded by a tort as damages that have arisen through special circumstances. According to Civil law article 393 (2), the injured could claim consolation money for such losses only if only if the offender had foreseen or could have foreseen such circumstances. Also our court will solve through damages for non-pecuniary loss by complementary function of consolation money in that pecuniary loss could be difficult to valuate.

  • PDF

제3자의 행위에 의한 개인정보침해사고로 발생한 손해배상책임의 합리적 배분 (Rational Allocation of Liability for Damages in Personal Information Infringement by Third Party)

  • 유비용;권헌영
    • 정보보호학회논문지
    • /
    • 제30권2호
    • /
    • pp.231-242
    • /
    • 2020
  • 해커와 같은 정보침해행위자에 의한 개인정보침해사고가 발생하여 손해가 생긴 경우, 정보주체는 통상적으로 가해자인 정보침해행위자보다는 정보처리자에게 손해배상을 청구할 것이고 정보처리자는 다시 자신이 정보보호업무를 위탁한 정보보호기업에게 구상청구를 할 것이다. 본 연구는 정보주체, 정보처리자, 정보보호기업간에 진행될 것으로 예상되는 손해배상청구의 연쇄가 결국 침해행위로 인한 피해자들 간에 책임의 전가를 위한 다툼에 불과하다는 점에서 정보주체의 손해에 대한 전보라는 일면적인 접근보다 정보보호산업 생태계를 구성하는 주체들간에 손해를 합리적으로 분배하기 위하여 손해배상문제를 다면적 관점에서 고찰해 본다. 또한 개인정보침해사고의 특성상 대량의 개인정보 침해가 발생한 경우 배상금액이 기업의 존폐에까지 영향을 미칠 정도로 커질 수 있기 때문에 손해에 대한 배상책임을 전적으로 피해자들에게만 부담시키는 것보다 사회도 일정부분 손해를 분담하기 위한 구체적이고 현실적인 방안이 필요함을 주장한다. 향후 본 연구에서 제기한 손해배상책임의 합리적 배분 방안에 대하여 충분한 사회적인 합의를 거쳐 구체적이고 객관적인 책임배분기준을 마련하고 이를 제도적 또는 법적으로 반영함으로써 손해배상책임의 예측가능성과 법적안정성을 확보하여야 한다.

국민건강보험공단의 가입자 손해배상채권 대위 범위에 관한 소고: 대법원 2021. 3. 18. 선고 2018다287935판결 중심 (A Brief Study on the Scope of National Health Insurance Service's Subrogation to the Insured owing to Claim for Damages)

  • 전병주;한혜숙;박미숙
    • 한국콘텐츠학회논문지
    • /
    • 제21권8호
    • /
    • pp.305-314
    • /
    • 2021
  • 최근 대법원은 국민건강보험공단이 불법행위 피해자에게 보험급여를 한 다음 피해자의 손해배상채권을 대위하는 경우에 공단의 대위 범위는 공단부담금 중 가해자의 책임비율에 해당하는 금액으로 제한되고, 피해자의 가해자에 대한 손해배상채권액은 '공제 후 과실상계' 방식으로 산정해야 한다고 판단하였다. 종전까지 법원은 공단이 가해자의 손해배상액을 한도로 공단부담금 전액을 대위할 수 있고, 그에 따라 가해자의 피해자에 대한 손해배상액을 산정할 때 '과실상계 후 공제 방식'에 따른다는 취지로 일관되게 판단하였다. 이번 대법원의 전원합의체 판결은 수급권자가 그 만큼 추가적인 손해전보를 받을 수 있어 건강보험의 재산권적 성격과 사회보험으로서의 성격을 조화롭게 고려하고 보험자와 수급권자 사이의 형평을 도모했다는 점에서 판결의 의미가 크다고 할 것이다. 이와 같이 공단의 대위 범위에 대한 대법원의 법리가 변경됨에 따라 소송 관계, 법령 및 제도적 보완이 필요함을 제언하였다.

지체상금 개선방안에 관한 기초연구 (A Basic Study on the Improvement for Liquidated Damages at Construction Delay)

  • 국동훈;손기영;김선국
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.458-461
    • /
    • 2006
  • 건설시장의 개방과 함께 보다 다양화되고 국제화된 건설문화를 받아들이게 된 시점에서 우리나라 건설문화수준 및 정책은 아직 국제기준에 미치지 못하고 있는 실정이다. 그 예로 시공자 귀책사유로 인한 공기지연시 위약금 성격의 지체상금 산정방법은 손해배상금 성격의 국제기준과 차이를 보여 추후 잠재적 클레임의 가능성을 지닌다. 이에 본 연구는 지체상금 산정방법을 국제기준 및 공기연장비용과의 비교 ${\cdot}$ 분석을 통해 실제 발생되는 항목을 선정하여 손해배상금 성격의 지체상금 산정방법 개선방안을 위한 기초연구를 진행하였다.

  • PDF

A Basic Study on the Introduction of Professional Indemnity Insurance for Construction Project Managers

  • Cho, Young-Jun
    • 한국건축시공학회지
    • /
    • 제13권2호
    • /
    • pp.102-111
    • /
    • 2013
  • During the administration of a construction project, various types of participants are engaged in the project. From the design phase to the maintenance phase, these participants may confront many risks. To avoid these risks, participants should utilize an insurance company or a bond company. The types of risks and liability that a construction manager may face are listed in the construction law or contract. But there are some arguments related to risk transferring and the content of risks. For this reason, construction managers must carefully consider any possible risks in the contract and the construction law. Therefore, for construction managers to deal with risks appropriately, the introduction of a legal requirement to carry professional liability insurance, a defined compensation range for damages, a method of guarantee in the event of defects, a defined compensation claim period for damage, and a method of damage claim were suggested in this study.