• Title/Summary/Keyword: Claim for Damages

Search Result 91, Processing Time 0.023 seconds

A Study on the Precautions in light of practical affairs related to a claim for damages under the International Sale of Goods - Focusing on the CISG(1980) and PICC(2004) - (국제물품매매에서 손해배상과 관련한 실무상 유의점에 관한 연구 - CISG(1980)와 PICC(2004)를 중심으로 -)

  • Hwang, Ji-Hyeon;Choi, Young-Joo
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.55
    • /
    • pp.155-181
    • /
    • 2012
  • This study considered as precautions in light of practical affairs related to a claim for damages focusing on CISG (1980) and PICC (2004). Given summarizing contents of this study, those are as follows. First, when exercising a claim for damages, proving the damages may be difficult and hard. Thus, there is necessity for stating the liquidated damages clause in contract given conclusion of contract. Second, as for the application of interest rate given a claim for interest, CISG is not covered interest rate. PICC is covered interest rate. However, there is possibility that PICC will not be applied as general principles. Thus, to remove this insecurity and uncertainty, there is necessity for stating this in contract by deciding on the detailed standard stipulation after fully discussing about interest payment with the counterpart given sale contract. Third, when a seller delivered non-conformity of the goods for contract, a buyer is desirable to exercise by discreetly judging the exercise method or limitation element on a problem of selecting and exercising remedy favorable to oneself out of a claim for damages and a right to reduce the price. Finally, There was suggestion that the contract parties are desirable to utilize by modifying and supplementing properly this in line with own business-based necessity and situation based on the ICC Model International Sale Contract, and to state CISG and PICC the governing law clause, in preparing contract. This study is expected to possibly become guideline in which the damaged party exercises a claim for damages or aims to cope with the counterpart's exercising a claim for damages.

  • PDF

A Study on a System of Resolving Claim according to the Delay of Construction Projects - Focus on Liquidated Damages - (공기지연에 따른 클레임 대응방안에 관한 연구 - 지체상금을 중심으로 -)

  • 이영민;이상범;김정길
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.111-116
    • /
    • 2002
  • The delay of the completion of the construction project occurs frequently because the origin schedule is affected by numerous factors that contribute to the overall delay in completing the project. But in our country. the dealing with a claim is not sufficient yet by reasons of fairl relation between owner and constructor, cognitive shortage in claim, and such. especially they have make a wrong application of baseless the rule. In this study. we make a rational model ; that includes calculating of dispute costs, and suggest the solution and the prevention for claim by considerating the law followed liquidated damages.

  • PDF

A Study on the Surrender B/L and the Subrogation Claim of Marine Cargo Insurance under International Trade Transaction (국제무역거래상 권리포기 선하증권과 관련된 해상화물보험의 대위청구권에 관한 연구)

  • LEE, Jae-Sung
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.65
    • /
    • pp.71-94
    • /
    • 2015
  • The insurer's right to take legal proceedings in the name of the assured against a third party who has caused loss of or damage to the goods is of particular importance in marine cargo insurance under international trade transaction. The amounts recovered in subrogation actions, known in practice simply as recoveries, form a significant element in the balancing of the cargo insurer's underwriting account by improving ing the loss record. However, even if the carrier involved in the accident have a liability for damages, in some cases can not claim damages in accordance with the after clauses and carrier's exemption clauses indemnity carrier under the contract of carriage. In recent, the dispute cases to argue damages claim of the carrier in connection with business practices of surrender B/L, the claim is dismissed cases in accordance with the Arbitration Rules of the after clauses. In the future, the surrender B/L is continually to use as a marine transport method, it may also be interested in insurance subrogation of damages claims to insurance accident by a surrender B/L.

  • PDF

Duty to Mitigate Damages under CISG (국제물품매매협약상 손해경감의무)

  • HEO, Hai-Kwan
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.69
    • /
    • pp.63-84
    • /
    • 2016
  • Article 77 of CISG requires an aggrieved party, the promisee, claiming damages to take reasonable measures to mitigate losses. The reasonable measures required hereunder are limited to those that can be expected under the circumstances having regard to the principle of good faith. When taking such measures, the aggrieved party must do so within a reasonable time under the circumstances. The expenses incurred in taking such measures are recoverable from the promisor. If the aggrieved party fails to do so, the damages recoverable from the promisor are reduced in the amount the loss that should have been mitigated. The aggrieved party's duty to mitigate damages applies to claim for damages only. That is, the violation of this duty should not be invoked against other remedies available under CISG, such as the right to claim specific performance, the right to claim for the price or the right of reduction of price. In practice, under the provision of article 77, the aggrieved party, the seller or the buyer, is often required to enter into a substitute transaction as a measure to mitigate losses and many cases involving a substitute transaction are internationally reported. Therefore this paper intends to provide a certain understanding of the aggrieved party's duty to take measures to mitigate losses based on such cases reported.

  • PDF

A Study on CIETEC Arbitration Case for the Relationship between Damages and Reduction under CISG (CISG상 손해배상과 대금감액의 관계에 관한 중국 CIETAC의 중재사례 연구)

  • Song, Soo-Ryun
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.51
    • /
    • pp.133-158
    • /
    • 2011
  • The purpose of this study is to analyze one of CIETEC(China International Economic and Trade Arbitration Commission) Award on the dispute arising from Cotton Sale Contact which deals with damages and reduction of the price. Especially this case focused on the effect of reduction of the price to damages. The purpose of damages is to place the aggrieved party in as good a position as if the other party had properly performed the contract. So court costs and attorney's fee should be regarded as the loss, because these are caused by consequence of the breach which is recoverable. With the same reason, overpaid taxes should also regard as the loss. It is not impossible, however, to claim both damages and reduction of the price for same loss at the same time. It means buyer could not claim damages for the same loss, once he already claimed reduction of the price. So Korean companies should consider which remedy is proper to himself under the circumstances. He should choose reduction of the price when market price is down. In case of rising market price, he should consider follows: first, it is better to choose damages based on current price(Art.76), if upswing of non-conformity price is higher then upswing of market price. Second, it is better to choose general rule for measuring damages(Art.74), if upswing of market price is higher then upswing of non-conformity price.

  • PDF

A Study on the Legal Assessment and Cases of Damages under CISG (국제물품매매계약에 관한 UN협약(CISG)상 손해배상액 산정기준의 해석과 적용)

  • Shim, Chong-Seok
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.55
    • /
    • pp.3-32
    • /
    • 2012
  • CISG article 74 establishes the general formula applicable in all cases where an aggrieved party is entitled to recover damages. It provides that damages for breach of contract comprise all losses, including loss of profits, caused by the breach, to the extent that these losses were foreseeable by the breaching party at the time the contract was concluded. An aggrieved party may claim under article 74 even if entitled to claim under article 75 or 76. The latter articles explicitly provide that an aggrieved party may recover additional damages under article 74. Articles 75 and 76 apply only in cases where the contract has been avoided. Article 75 measures damages concretely by reference to the price in a substitute transactions, while article 76 measures damages abstractly by reference to the current market price. Article 76 (1) provides that an aggrieved party may not calculate damages under article 76 if it has concluded a substitute transaction under article 75. If however, an aggrieved party concludes a substitute transaction for less than the contract quantity, both articles 75 and 76 may apply. Pursuant to article 77, damages recoverable under articles 74, 75 or 76 are reduced if it is established that the aggrieved party failed to mitigate losses. The reduction is the amount by which the loss should have been mitigated. Article 78 entitles a party to interest on the price and any other sum that is in arrears.

  • PDF

A Study on the Problems in Exercising Buyer's Right to Claim Damages for the Breach of Contract by the Seller in International Sales Contract - Focusing on CISG and UNIDROIT Principles(2010) - (국제물품매매계약에서 매도인의 계약위반에 대한 매수인의 손해배상청구권 행사의 문제점 - CISG와 UNIDROIT Principles(2010)을 중심으로-)

  • Oh, Won Suk;Youn, Young Mi;Lim, Sung Chul
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.58
    • /
    • pp.3-33
    • /
    • 2013
  • The purpose of this paper is to examine the problems in exercising buyer's right to claim damages for the breach of contract by the seller in international sales contract and to suggest reasonable counter-measures. The main contents are as follows: First, this author analyzed the principles of the seller's liability for damages in detail and examined the methods for the calculation of damages on the basis of Arts.74~77. As these articles are found to be insufficient in practical application, this author further examined the UNIDROIT Principles(2004) to confirm whether these Principles can fill the gaps of CISG or not, which turned out their gap-filling functions. Second, this author tried to find any expected problems when the buyer resorts to the right to claim damages in case of the seller's breach of contract including the estimation of damages, the burden of proof, causation, the proof of appropriateness for avoidance, the proof of buyer's obligation to mitigate the loss and so on. The reason is that these problems may cause a lot of difficulties in real business. As result, many buyers have given up their reasonable rights to claim damages so far. Finally, from the buyer's perspective, this author would like to suggest a liquidated damage clause(LD Clause) which gives the buyer to received a specified sum in case of seller's non-performance and/or a demand guarantee(or standby L/C) which guarantees buyer to secure unconditional payment independent of the underlying contract. For these purposes, the buyer should try to insert the LD Clause and/or Guarantee Clause in the contract when the buyer and the seller negotiate the sales contract. Also there are a lot of considerations and limitations in using the LD Clause and the Guarantee Clause in their real business, mainly dependent up bargain power between the seller and the buyer, for which this author promise to examine in detail in the future.

  • PDF

Main Trends for Reforming the Law of Insurance Contract in England - Focused on the Insured's Post-Contract Duty of Good Faith in relation to Claims - (영국 보험계약법의 주요 개혁동향 - 보험금청구와 관련한 피보험자의 계약체결 후 선의의무를 중심으로 -)

  • Shin, Gun-Hoon
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.53
    • /
    • pp.207-229
    • /
    • 2012
  • In IP 7 and LCCP 201, Law Commission considers the insured's duty of good faith after the formation of the contract. This article intends to review and analyse the legal implications of proposals in IP 7 and LCCP 201. The results of analysis are following. First, Law Commission propose to end the remedy of avoidance under MIA 1906 section 17, because avoidance of past claims is unprincipled, impractical and unnecessarily harsh. Secondly, LC proposes that an insured who makes a fraudulent claim should forfeit the whole claim which the fraud relates, but that the fraud should not invalidate previous and legitimate claims. Thirdly, LC proposes to introduce a statutory right for the insurer to claim damages for the reasonable, foreseeable costs of investigate a fraudulent claim in specific circumstances and that damages would be limited to those cases where the insurer can show an actual, net loss. Finally, LC provisionally propose that an express fraud clause should be upheld in business insurance, whereas in consumer insurance, any term which purports to give the insurer greater rights in relation to fraudulent claims that those set out in statute would be of no effect.

  • PDF

A Problem on the Election of Remedies for the Aggrieved Party under the CISG (CISG에서의 피해당사자(被害當事者)의 구제방안(救濟方案) 선택문제(選擇問題) - 대금감액(代金減額)과 손해배상제도(損害賠償制度)를 중심(中心)으로 -)

  • Choi, Myung-Kook
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.12
    • /
    • pp.201-225
    • /
    • 1999
  • This article is focused on the review of price reduction and measuring damages under the CISG together with the law relating to sale of goods in main countries when the goods delivered did not conform with the contract. And also reviewed on the election of remedies for the aggrieved party, that is, which one between the two remedies would provide more compensation for the non-conformity. This article can be summarized as below. 1. Price reduction has its principal significance when the buyer accepts non-conforming goods and plays important role only when the seller is not liable for the non-conformity because the same price reduction formula applies for all circumstances. Of course, the buyer must bear any further damages, such as shutdown expenses and other consequential damages. 2. If the seller is liable for the damages and the price level rises, the buyer normally will claim damages since this approach is much more favorable result than price reduction. 3. In case the seller is liable for the damages and the buyer suffers no consequential damages, if the price level falls, price reduction would provide more compensation for the non-conformity than would damages and if there is no change in the market level, the allowance for defects in the goods will be normally the same under the price reduction and damages. By the way, In case the seller is liable for the damages and the buyer suffers consequential damages, it is desired that the buyer firstly elect the price reduction and later seeks to claim for consequential losses when the price level falls and unchanged.

  • PDF

A Liquidated Damages Calculation Method Based on Owner's Substantial Loss (발주자 손실기반 지체상금 산정 개선방안)

  • Jang, Bong-Jo;Shim, Jae-Young;Koo, Jeong-San;Jung, Dae-Won;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.150-158
    • /
    • 2007
  • The delay of construction is one of the most frequent and complicated elements of the claim. And the liquidated damages cause many disputes during the judgement. The liquidated damages should be a compensation for owner's substantial loss, but actually be applied as a damage for breach of contract. These damages are different from owner's loss and give constructors a excessive burden. So we need a more reasonable system than a lump application system. In this study, we make a Improvement System, that based on owner's substantial loss, and suggest the new liquidated damages calculation method.