ORGANIZATIONAL AND COMMUNICATION ISSUES FOR MANAGING DESIGN-BUILD HIGHWAY PROJECTS

  • G. Edward Jr. Gibson;James T. O'Connor;Giovanni C. Migliaccio;Pramen P. Shrestha
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.974-979
    • /
    • 2005
  • Effective communication flow is a fundamental for the success of any construction projects. The key role of communications among project parties is even more critical in the case of Design-Build (DB) projects. Previous research has shown that these projects have an environment where integration between different project team members and schedule constraints increase channels of communication, and require faster communication flows. This paper summarizes the findings from research analyzing organizational structures and communication flow of the Texas State Highway 130 (SH130) project. Awarded in 2002, the SH130 project, totaling $1.3 billion USD, constitutes the "pilot" application for the DB approach in the state of Texas. A set of observations pertaining to team organization and communication issues in the design-build environment is included.

  • PDF

VISUALIZATION OF HIGHWAY PROJECT BIDS USING TREEMAPS

  • Min Peng;William J. O'Brien;James T. O'Connor
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1036-1041
    • /
    • 2005
  • Treemaps, a space filling visualization technique, displays a massive data set of hierarchical data interactively on a single computer screen by mapping it to a matrix of rectangles. It allows users to visually inspect and manipulate data to find new relationships or discrepancies that are to difficult to find using traditional techniques. This paper applies treemaps to the evaluation of highway project bids, which contain hundreds or thousands of elements arranged in a hierarchical structure. Through a case study, treemaps are shown to be a potentially effective tool for bid evaluation by both contractors and State or Federal highway officials.

  • PDF

Uncertainty Factors affecting Bid Price from Pre-bid Clarification Document of Transport Construction Projects

  • Jang, YeEun;Kim, HaYoung;Yi, June-Seong;Lee, Bum-Sik
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.238-244
    • /
    • 2022
  • Civil projects are associated with many uncertainties because they involve a long duration, many resources, a large area, and many supply chains. Therefore, the price of a civil project is not simply proportional to the quantity and unit price of the item but has a variable value, including uncertainty risk. This study investigates the influence of the uncertainty factors in the pre-bid clarification document on bid price formation during the project bidding phase. To this end, civil projects from the California Department of Transportation (Caltrans) were used as research data. This study randomly selected fifty sample data from each of twelve counties from 2008-to 2020: six hundred. The authors observed that each project sample had 0 to n query cases due to uncertainty. Then, this study examined the project uncertainty cases and categorized them into the following four uncertainty factors: 'conflict' (UF1), 'impossibility' (UF2), 'lack' (UF3), and 'missing' (UF4). Under the extracting process, the cases are classified into four uncertainty factors. With the project not containing any uncertainty factors as a control group, the project containing these uncertainty factors was designated as an experimental group. After comparing the bidder's price, the experimental group's bid price was higher than the control group's. This result suggests that uncertainty factors in bid documents induce bidders to set a high bid price as a defense against uncertainty.

  • PDF

STOCHASTIC CASHFLOW MODELING INTEGRATED WITH SIMULATION BASED SCHEDULING

  • Dong-Eun Lee;David Arditi;Chang-Baek Son
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.395-398
    • /
    • 2011
  • This paper introduces stochastic cash-flow modeling integrated with simulation based scheduling. The system makes use of CPM schedule data exported from commercial scheduling software, computes the best fit probability distribution functions (PDFs) of historical activity durations, assigns the PDFs identified to respective activities, simulates the schedule network, computes the deterministic and stochastic project cash-flows, plots the corresponding cash flow diagrams, and estimates the best fit PDFs of overdraft and net profit of a project. It analyzes the effect of different distributions of activity durations on the distribution of overdrafts and net profits, and improves reliability compared to deterministic cash flow analysis.

  • PDF

QUANTITATIVE ANALYSIS ON PROJECT PERFORMANCE ANALYSIS AND DELIVERY METHODS

  • Seta Ohanesian;Jin-Lee Kim;Tang-Hung Nguyen;Ok-Kyue Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.332-337
    • /
    • 2013
  • Various project delivery methods have been utilized by owners over the years to maximize project performance. The design-build delivery method is being increasingly used due to the advantages it can offer to an engineering construction industry. Numerous studies have advocated the use of design/build over the traditional design/bid/build delivery approach. This study represents comprehensive analysis of 40 projects from the construction industry and shows that design/build method may not provide all the benefits to project performance. This study found timesaving was a definitive advantage of design/build project delivery, but the positive effects of cost changes was not convincing. Based on the results of the study, the project management expertise and experience of the contractor may have a greater impact on project performance outcomes than focusing on project delivery strategy only.

  • PDF

A STUDY ON ANALYSIS OF DELIVERY & CONTRACT SYSTEM FOR INTRODUCTION OF THE INTEGRATED PROJECT DELIVERY (IPD) TO KOREA - Focusing on Delivery and Contract of Public Works -

  • Sulmin Song;Seong-Ah Kim;Yea-Sang Kim;Sangyoon Chin
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.142-148
    • /
    • 2011
  • Recently, much attention has been increasingly paid to the efficiency of the delivery system in order to manage construction project in a smooth and effective way. The integrated plan in consideration of the life cycle of building is required for the effective and integrated management of information in a huge amount. To this end, collaboration between each field is indispensable from the beginning of project. But there is a limitation that the designer and the constructor sign the contract separately in the conventional delivery system. In the US, the recent trend is that the Integrated Project Delivery (IPD) has been introduced to improve the effectiveness of project management in an increasing number of the cases where project is implemented by utilizing the IPD. In Korea, there is also an increasing need to introduce the IPD for the integrated project management. Consequently, the purpose of this study is to examine and analyze the laws and the contracts that are applied to domestic cases of placing order and signing contract based on the concept and principle of the IPD before the actual introduction of the IPD. Based on such examination and analysis, this study intends to figure out the constraints to the introduction of the IPD. It is expected that the results of this study will be used as basic data for IPD-related study in the future.

  • PDF

민군 시설공용 확대 및 활성화 방안에 관한 연구 - 요인 분석과 AHP분석 기법으로 - (A Study on the Expansion and Revitalization Plan when Conceiving Civil and Military Sharing Facilities - Factor Analysis and Analytic Hierarchy Process -)

  • 공금록;박영준
    • 대한건축학회논문집:구조계
    • /
    • 제34권5호
    • /
    • pp.19-26
    • /
    • 2018
  • A civil-military facility sharing project is a part of mutual cooperative efforts, which enables the military to use any civilian (local government or company) or a civilian to use any military facility. Such facility sharing project may reduce or clear possible conflicts with the local residents in the surrounding area of a military facility while being available to save budgets for new construction or maintenance of a defense or military facility. Various measures have been proposed for institutional resolutions on conflicts with the local residents in the surrounding area of a military facility. This study collects and organizes previous cases of the civilian-military facility sharing projects, and analyzes the characteristics of such cases based on the project types. In addition, by organizing and proposing the project characteristics, plans (ideas) and determination criteria to expand and vitalize are presented regarding the project types having restrictions. AHP technique is employed to research on the matrix for the project feasibility determination. Also, the opinions organized through the cause analysis are categorized and presented as a project for the expansion and vitalization of future project. According to the rearch result, Type I, II and III are determined to be projects that can be implemented without difficulties. Type IV, on the other hands, is determined as not illegal, yet inadequate so that some legal and institutional complements are required to expand and vitaliza this facility sharing project.

Study on the Analysis of Domestic Construction Management Orders

  • Park, Jongsoon;Lee, Keunwon;Ann, Kyunghwan;Shin, Changhyun;Cho, Jaeho;Chun, Jaeyoul
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.387-391
    • /
    • 2015
  • Currently, there is insufficient research on the construction management performance since the CM system was introduced in Korea. For successful completion of construction projects, active use of construction mangers on projects is necessary by introducing construction management to the projects. In view of this, this study analyzed the annual CM performance from 1996 to 2013 but for the past 5 years from 2009 to 2013, a detailed analysis was carried out. For different sectors, CM performances were divided into public and private sectors, for project types, construction, civil and others, for project phases, pre-design, design, construction and post-construction phases, for contract types, sole and joint contract types, for project scale, the amount of the projects was taken into consideration and they were divided into large, medium and small scales and for the types of projects, they were divided into, shops, department stores, shopping centers, hospitals, government buildings, hotels, accommodation facilities, factories, buildings for workshops, office buildings, stadiums, playgrounds, schools and other construction types and all the data divided into such categories was analyzed. The results in this study can be used as a basic reference for studies in analysing construction management performances.

  • PDF

A SYSTEMIZED APPLICATION METHOD OF RFID TECHNOLOGY FOR LOGISTICS IN BUILDING CONSTRUCTION PROJECTS

  • Koo, Do-Hyung;Yoon, Su-Won;Chin, Sangyoon;Kwon, Soon-Wook;Kim, Yea-Sang
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.79-87
    • /
    • 2007
  • An effective logistics management is necessary for successful construction projects. So, prompt and precise logistics information collecting and management is needed, but there has been no systematic and effective method for this, Therefore, in this research, a standardized plan for RFID application in logistics management that could comprehend processes in building construction projects, was developed. With the 7 generalized process types that comprehend processes in construction projects, critical factors that should be considered for RFID applications were derived, and systematic and efficient application method for building projects were developed.

  • PDF

DATA ACQUISITION METHOD USING A SMARTPHONE ON CONSTRUCTION SITE

  • Ahra Jo;Teahoon Kim;Hunhee Cho;Kyung-In Kang
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.231-234
    • /
    • 2013
  • According to the recent development of USN technology, it has been applied in various fields of construction management. In particular, the concrete curing management using the wireless measurement system is actively being conducted. However, the existing method has limitations such as the reinstallation of temperature sensors and repositioning of repeaters. It is also not easy to acquire the measured data. Thus, this study focuses on the concrete curing management. This study proposes data acquisition method using the smartphone on construction site and tests applicability of the data measuring device and the smartphone. The test allows us to suggest the actual communication distance on construction site and to determine the correction value that is applied to the measured temperature. The data acquisition method proposed in this study is intended to enable appropriate management on construction site and will be able to be applied effectively to a variable construction site. It can also be used in all fields of construction management.

  • PDF