Multiple criteria decision making method for selecting of sealing element for earth dams considering long and short terms goals

  • Rashidi, Babak;Shirangi, Ehsan;Baymaninezhad, Matin
    • Wind and Structures
    • /
    • v.26 no.2
    • /
    • pp.69-74
    • /
    • 2018
  • Nowadays, using math logic in great civil projects is considered by the clients to achieve the goals of project including quality optimization, costs, avoiding individual, emotional and political decision making, long-term and short-term goals and they are the main requirements of each project and should be considered by the decision makers to avoid the illogical decision making applied on the majority of civil projects and this imposes great financial and spiritual costs on our country. The present study attempts to present one of the civil projects (Ghasre Shirin storage dam) whose client was not ministry of energy for the first time and the short-term and long-term goals of the private sector were applied based on the triangle of quality, cost and time. Also, the math logic and model (multi-criteria decision making method and decision making matrix) is used in one of the most important sections of project, sealing element, policies and new materials (Geosynthetics) are considered and this leads to suitable decision making in this regard. It is worth to mention that this method is used for other sections of a dam including body, water diversion system, diaphragm and other sectors or in other civil projects of building, road construction, etc.

The Cost Monitoring of Construction Projects through Earned Value Analysis

  • Waris, Muhammad;Khamidi, Mohd Faris;Idrus, Arazi
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.4
    • /
    • pp.42-45
    • /
    • 2012
  • In construction industry, the term 'procurement' is considered as a project based job where clients and contractors are always keen to observe performance indicators. These indicators represent financial and non-financial efficiency of project activities. Among these, the monitoring of financial indicators such as cost monitoring is an ongoing process and its importance cannot be undermined during the project life cycle. It can be monitored by using traditional approach of direct reporting of actual cost against budget. However, the comparison of budget versus actual spending does not indicate the worth of the work which is completed at any given time. This approach does not represent the true cost performance of the project. Because of these limitations, this paper discusses the applications of Earned Value Analysis (EVA) for cost monitoring of construction projects in Malaysia. Besides traditional approach, EVA is a three-dimensional approach that compares three cost indicators i.e. the budgeted value of work scheduled with the earned value of physical work completed and the actual cost of work completed. Therefore, cost monitoring by EVA is an objective measure of actual work performed. This paper uses a case study, an example application of EVA as a cost monitoring tool. This case study reaffirms the benefits of using EVA for project cash flow analysis and forecasting.

A STUDY ON CONSTRUCTION SCHEDULE OPTIMIZATION INTEGRATING WITH CASH-FLOW

  • Hyung-Guk Lee;Dong-Pil Shin;Sung-Hoon An;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.141-144
    • /
    • 2013
  • This paper presents a system called a Cash-flow based Construction Schedule Optimization system(CfSO). The existing CPM effectively handles schedule and cost management. However, funding strategy should be considered to obtain maximum profit and to progress a project favorably. One of measures is to coordinate the contract terms between owner and subcontractors (or suppliers). Contractor may decrease the interest cost attributed to project financing by adjusting the timing of cash-inflows and cash-outflows. It is an excellent method maximizing profits. This paper presents a method to estimate the amount of a cash-flow occurred periodically by integrating the terms of contract into scheduling. The proposed method is implemented as a system prototype in Microsoft Excel. This system provides a user an automated tool that identifies an optimal schedule that secures maximum profit by adjusting start and finish times of non-critical activities' free-floats without affecting on the project completion time. This system supports a project manager to establish an optimum project schedule and identifies profitable contractual conditions against to a construction owner.

  • PDF

ACCURACY IMPROVEMENT OF AN APPROXIMATE COST ESTIMATING MODEL FOR RIVER FACILITY CONSTRUCTION

  • Siwook Lee;Sungkwon Woo;Jeongyoon Lee;Inwook Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1201-1208
    • /
    • 2009
  • A making a decision of construction cost has important meaning and function for both contractor and owner in construction projects. Especially, it should be premised that estimating the construction cost in efficient and rational way in public construction, which is invested by government funds, for efficient execution of the budget and investment as a side of government. The systematic methodology for estimating construction cost approximately of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. On this study, It collect and analyze a river facility construction historical cost data for develop an approximate cost estimating model for river applied by typical embankment section method and rate application of the others activity type. And it verify suitability of model through a that result of application of real river facility construction statement at developed model. By this study, it is expected to reasonable and systematic estimating construction cost through application of developed model.

  • PDF

IMPLEMENTATION OF PRODUCT DATA MANAGEMENT SYSTEM FOR DESIGN OF BRIDGE STRUCTURES

  • Jin-Suk Kang;Seung-Ho Jung;Yoon-Bum Lee;Kwang-Myong Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1318-1323
    • /
    • 2009
  • In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Computer-based information technology includes Computer-Aided Design (CAD), Computer-Aided Engineering (CAE), Computer-Aided Manufacturing (CAM), Enterprise Resource Planning (ERP), Digital Mock-Up (DMU) and Product Data Management (PDM). Most construction industries are trying to apply these technologies for quality improvement, reduction of construction time and cost. PDM is very useful for managing data and process related to product design and manufacturing. PDM system has various functions such as drawing and engineering document management, product structure and structure modification management, part classification management, workflow management, and project management. In this paper, PDM system was applied to the design of steel-concrete composite girder bridge. To make a practical guidance for PDM implementation to bridge design, the procedure for its implementation was presented. Consequently, this paper could be useful to enhance the efficiency of bridge design.

  • PDF

A STUDY OF INVOICELESS PROCESS USING RFID IN CONSTRUCTION FIELD

  • Tai Sik Lee ;Kyoung Soon Park ;Ja Kyoung Koo ;Young Hyun Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1250-1255
    • /
    • 2005
  • Application of radio frequency Identification (RFID) technology in construction industry is not that progressive compared with other industries, because of it's high price experimental research. This research focus on potential application of RFID which eliminate manual data entry and introduce the potential for automated processes to increase project productivity, construction safety, and project cost efficiency. This paper suggest an invoiceless system using RFID technology, Process productivity and efficiency for material management is observed through WebCYCLONE and is compared with other processes.

  • PDF

ENVIRONMENTAL ECONOMICS FOR CONSTRUCTION

  • Suk hyun Kwon;Nam Ho Cho;Kyoung Hee Lee;Kyoung Ju Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.280-285
    • /
    • 2011
  • This study aims to propose an assessment model on environmental economics which will provide useful information in making a decision for the implementation of pro-environmental and economical construction projects. To meet the objective, this study suggests a procedure to estimate environmental cost of construction projects. The model combines environmental load assessment and environmental value assessment. The environmental cost of pollutant generated from the construction project was estimated utilizing the Contingent Valuation Method (CVM) which is a value assessment method borrowed from economic science. The devised model is expected to provide a useful methodology that will scientifically support the planning and management of sustainable construction not only in the environmental aspect but also in the economical aspect.

  • PDF

Comparative Analysis on Unit Price based on Historical Cost Data Estimating for Large and Small-scale Civil Engineering Works (대·소규모 토목공사의 실적공사비 비교 분석)

  • Hong, Sung Ho;Shin, Juyeoul;Kim, Chang Hak;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1707-1718
    • /
    • 2013
  • Historical cost data estimating system has been introduced since 2004 in the construction industry. Based on contract prices of past projects, this estimating system estimates construction cost according to work types. The Korea Institute of Construction Technology (KICT) announces the historical cost data twice a year annually. The unit price of a small construction project is higher than large construction project due to the increase on production cost per work unit, equipment and labor cost, etc. However, the historical cost data estimating system is applied to project estimation uniformly regardless the construction project's size. This study compared and analyzed the historical cost data of large and small construction project to indicate the problem of historical cost date estimating system. The study derived that the unit price of a small construction project is 21.8% higher than that of large construction project.

INVESTMENT EVALUATION OF TRANSPORTATION INFRASTRUTURE PROJECTS USING BINOMIAL REAL OPTION MODEL

  • Qiyu Qian;Xueqing Wang;Charles Y.J. Cheah
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.563-572
    • /
    • 2007
  • Transportation infrastructure is critical to economic growth of a country such as China. Careful evaluation of investments in traffic infrastructure projects is therefore pertinent. As traditional evaluation methods do not consider the uncertainty of future cash flows and mobility during project execution, the real option approach is gradually gaining recognition in the context of valuing construction and infrastructure projects. However, many of the cases only evaluate individual options separately although multiple options often exist in a typical large infrastructure project. Using a highway project in China as a case study, this paper first evaluates a deferment option and a growth option embedded in the project. Subsequently, the values are combined using the fuzzy analytical hierarchy process. It is found that the combined value is less than the sum of the two option values. This finding is consistent with the theoretical observations given in past real option literature despite the use of a different approach.

  • PDF

Prediction Model of Final Project Cost using Multivariate Probabilistic Analysis (MPA) and Bayes' Theorem

  • Yoo, Wi Sung;Hadipriono, FAbian C.
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.191-200
    • /
    • 2007
  • This paper introduces a tool for predicting potential cost overrun during project execution and for quantifying the uncertainty on the expected project cost, which is occasionally changed by the unknown effects resulted from project's complications and unforeseen environments. The model proposed in this stuff is useful in diagnosing cost performance as a project progresses and in monitoring the changes of the uncertainty as indicators for a warning signal. This model is intended for the use by project managers who forecast the change of the uncertainty and its magnitude. The paper presents a mathematical approach for modifying the costs of incomplete work packages and project cost, and quantifying reduced uncertainties at a consistent confidence level as actual cost information of an ongoing project is obtained. Furthermore, this approach addresses the effects of actual informed data of completed work packages on the re-estimates of incomplete work packages and describes the impacts on the variation of the uncertainty for the expected project cost incorporating Multivariate Probabilistic Analysis (MPA) and Bayes' Theorem. For the illustration purpose, the Introduced model has employed an example construction project. The results are analyzed to demonstrate the use of the model and illustrate its capabilities.