Exploring the adoption of IPD practices in Chinese construction industry

  • Li, Shan;Ma, Qiuwen
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.245-251
    • /
    • 2017
  • Integrated Project Delivery (IPD) is a procurement method that has been proved to improve construction project performance. However, in China implementation of IPD practices in construction projects is unknown though some researchers have studied the problems and constraints in adoption IPD. The purpose of this study was to explore IPD adoption in Chinese construction industry. Critical components of IPD implementation were reviewed, and questionnaires were distributed to collect industry views. The results revealed that IPD uptake is still low. In particular, the liability waiver and shared risks and rewards have been rarely used. In addition, co-location, value engineering method and the new compensation approach have also been hardly adopted. Some practices related to early involvement of key parties were adopted. Surprisingly, the findings indicate that the client has been continuously involved in the projects. The findings may imply that the legal issues and problems of contractual frameworks are still constraining IPD implementation in Chinese construction industry.

  • PDF

STOCHASTIC CASHFLOW MODELING INTEGRATED WITH SIMULATION BASED SCHEDULING

  • Dong-Eun Lee;David Arditi;Chang-Baek Son
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.395-398
    • /
    • 2011
  • This paper introduces stochastic cash-flow modeling integrated with simulation based scheduling. The system makes use of CPM schedule data exported from commercial scheduling software, computes the best fit probability distribution functions (PDFs) of historical activity durations, assigns the PDFs identified to respective activities, simulates the schedule network, computes the deterministic and stochastic project cash-flows, plots the corresponding cash flow diagrams, and estimates the best fit PDFs of overdraft and net profit of a project. It analyzes the effect of different distributions of activity durations on the distribution of overdrafts and net profits, and improves reliability compared to deterministic cash flow analysis.

  • PDF

Analysis of Relative Importance and Priority of Civil Servant's Education Training Policy: Using Analytic Hierarchy Process (AHP) Method (공무원교육훈련정책의 상대적 중요도와 우선순위 분석: 계층의사결정방법(AHP)을 활용하여)

  • Park, Jong-Deuk
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.4
    • /
    • pp.263-272
    • /
    • 2012
  • In an attempt to analyze the policy priority on civil servant's education training policy as human resource management in this study, a positive analysis with the experts using AHP method was conducted. Summarizing the outcome of the study; First, in terms of relative priority of the evaluation elements by sector, the education training operation system, among education training program, education training evaluation, and education infrastructure, was analyzed as the most important element. Second, as a result of analyzing the priority of detail sectors of civil servant's education training, Action learning education program was proved to be the top priority project education training program aspect and education training operation system was also evaluated as the top priority project in education training agency budget expansion aspect, education training and personnel administration link was evaluated as the top priority project education training evaluation, and trainer secure was proved to be the top priority education infrastructure. Such outcome of the project is expected to make commitment for evaluating the civil servant's education training policy.

Development of a Project Schedule Simulation System by a Synchronization Methodology of Active nD Object and Real Image of Construction Site

  • Kim, Hyeon Seung;Shin, Jong Myeong;Park, Sang Mi;Kang, Leen Seok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.344-348
    • /
    • 2015
  • The image data of the web camera is used to identify the construction status of the site in a remote office and it can be used for safety management. This study develops a construction schedule simulation system based on the active nD object linked with real image data of web camera from the construction site. The progress control method by 4D object uses a method that the progress of each activity is represented with different colors by progress status. Since this method is still based on a virtual reality object, it is less realistic description for practical engineers. Therefore, in order to take advantage of BIM more realistic, the real image of actual construction status and 4D object of planned schedule in a data date should be compared in a screen simultaneously. Those methodologies and developed system are verified in a case project where a web camera is installed for the verification of the system.

  • PDF

Assessment of structural behavior of reinforced concrete slab ceiling under full load test in a residential complex project

  • Jaffar A. Kadim;Oday A. Abdulrazzaq;Abdulamir A. Karim;Aqeel H. Chkheiwer
    • Structural Engineering and Mechanics
    • /
    • v.89 no.6
    • /
    • pp.627-634
    • /
    • 2024
  • This research deals with the process of conducting a reinforced concrete slab loading test of a Residential Complex Project at the Shatt Al Arab District which is located in southern Iraq. The purpose of the test which represents a destructive test is to evaluate the structural behavior of the slab condition state during and after the examination of the test process in order to ascertain the ability of the slab ceiling to withstand the loads generated during the use of the building. The test was carried out accordant to ACI 437.2-13 code. The reason for this test is the postponed 8 years of building project construction. Concrete blocks were used to simulate and conduct a loading test of 30-tons for 3 days. The central point has been installed to measure the slab deflection that occurred during the test. The results showed that both the total deflection and residual deflections were lesser than the permissible values according to the ACI 437.2-13, the RC slab behavior was mainly linear structural behave, and that the purpose of the examination was achieved. Finally, a new method was introduced to the assessment of the slab condition at the support which is found in good condition.

Lessons Learned during the Early Phases of a Modular Project: A Case Study of UNLV's Solar Decathlon 2020 Project

  • Choi, Jin Ouk;Lee, Seungtaek;Weber, Eric
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.543-550
    • /
    • 2022
  • The U.S. Department of Energy conducts the Solar Decathlon competition as a student-based achievement that encourages sustainable design with energy efficiency and solar energy technologies. In the 2020 competition, the University of Nevada, Las Vegas (UNLV) team designed, fabricated, and constructed a net-zero modular house that applies innovative and highly efficient building technologies. This paper focused on the lessons learned during the early phases of this ongoing modular project. The research methodology included obtaining feedback from key project participants using a well-structured questionnaire. The results showed that the major items/challenges in the project's planning phase included selecting the modular size, planning the construction system, planning the materials and procurement, estimating costs and duration, selecting a fabricator, collaboration and communication, safety, and planning module transportation. These findings will help modular practitioners and future Solar Decathlon competition participants better understand how and what factors they should consider most during the early phases through the lessons learned.

  • PDF

Development of Business Model for Partnership Support Management (PSM) in Private Infrastructure Projects (민간투자사업 파트너쉽지원관리(PSM) 업무모델 개발)

  • Jung, Pyung Ki;Baek, Hyeon Gi;Seo, Jong Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.1D
    • /
    • pp.99-109
    • /
    • 2011
  • In order to maintain construction industry and to improve efficiency, the Korean government legislated private investment system. Private sector takes advantages by adopting CM (Construction Management) project system, however, public sector has relatively less capability and experience than private sector. In this paper, PSM (Partnership Support Management) is addressed in order to actively strengthen the project capabilities for public sector. PSM maintains existing CM project system because it is a concept of expended business model of CM. PSM needed to categorize the private participated project into 5 phases; project development phase, project announcement phase, project evaluation phase, project agreement phase and agreement changing phase. PSM business structure and business process considering stakeholder's interrelationship and participation are suggested in this research. Suggested PSM business model may not only increase a comprehensive understanding of government and project capability, but also may reduce work load and responsibilities for project momentum of private participation in infrastructure.

A Study of the Effect of PMC and Human Resource Competency on Construction Project Performance Outcomes (PMC (Project Management Consultant)와 인적자원역량이 건설프로젝트성과에 미치는 영향에 관한 연구)

  • Lee, Heonchang;Lee, Jeongryun;Ahn, Byeonghoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.5
    • /
    • pp.701-710
    • /
    • 2022
  • This study aims to prove the importance and necessity of a project management consultancy (PMC) that systematically manages construction projects to ensure their successful implementation. In order to analyze the interrelationship between the role of PMC and the outcome of the construction projects, structural equation modelling(SEM) was conducted. Hence, one of the critical aspects when conducting the project, human resource competency, especially referring to the competency of project team members and the project manager's leadership, affects the performance of construction projects. As a result of this study, PMC is found to have significant effects on human resource competency and construction project performance. In addition,human resource competency also had a significant effect on construction project performance. Consequently, the research outcomes suggest that introducing PMC services should be done when implementing large domestic infrastructure projects successfully, as doing so will enhance PM leadership and strengthen the capacity of the project team members.

Case study of Civil Engineering BIM Projects: Perspective of Korean Public Owners (토목분야 BIM 적용 사례 분석을 통한 발주자 관점에서의 BIM 발전 전략)

  • Kim, Changyoon;Moon, Hyoun-Seok;Nah, Heu-Suk;Kim, Jin-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7430-7437
    • /
    • 2014
  • Owing to the increase in large and complex construction projects, the design paradigm of architecture and civil engineering projects has changed from 2D CAD to 3D CAD. For this reason, to meet the strong requirements of project contractors, various efforts have been made to adopt a Building Information Modeling (BIM) technology for effective construction management. On the other hand, compared to architectural projects, only a few civil engineering project cases have been conducted in the perspective of public contractors. This is because the characteristics of civil project contractors and the negative pursuit of adopting BIM technology due to the lack of a current BIM system and technologies. Recently, positive changes in adopting BIM technology for public projects were anticipated by public owners, such as the Public Procurement Service and the Ministry of Land, Infrastructure and Transport. In this regard, this study analyzed the current BIM technology status of public owners in Korea to adopt the BIM policies and guidelines of the Korean government. Strategies for adopting BIM technologies for Korean public owners are also discussed based on an analysis of civil engineering BIM project cases.

Effective Analysis Framework for Construction Post Evaluation (건설공사 사후평가 수행결과의 효과적인 분석방법)

  • Kim, Tae Yeong;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.6
    • /
    • pp.1145-1152
    • /
    • 2016
  • A construction post evaluation is introduced to provide information that can be used for similar construction projects in the future through the evaluation of the efficiency of a public construction project and the verification of the appropriateness of the project results. However, it is not widely used due to a lack of awareness of the method. For this reason, the aim of this study is to provide a basic frame that can be utilized as a reference for a similar project in the future based on the construction post evaluation. More specifically, a more effective analysis method for the construction post evaluation is proposed and then an exemplary analysis is performed based on the method. The paper analyzes 293 cases stored in construction CALS. Construction cost growth rates of railway projects are tend to be greater than other project types like highway, expressway, and harbour. Then, construction schedule grwoth rates of expressway are greater than others. This is expected to provide useful information for a future project, and serve as a basic frame. Moreover, it is also meaningful that a project can be analyzed from different perspectives through the construction post evaluation.