• Title/Summary/Keyword: Ceiling mount

Search Result 5, Processing Time 0.02 seconds

Analysis of a Mount Type HVAC Control System Using Axiomatic Design (공리적 설계를 이용한 매립형 공기조화시스템의 분석)

  • Lee, Se-Jung;Hong, Eul-Pyo;Kim, Dae-Whan;Kim, Su-Ok;Park, Gyung-Jin
    • Proceedings of the KSME Conference
    • /
    • 2008.11a
    • /
    • pp.1028-1033
    • /
    • 2008
  • The mount type HVAC control system is a type of an HVAC control system which is installed between a ceiling and ceiling boards of a room to control room temperature. Although the device is quite popular, design is conducted by a conventional way where engineering intuition and experiences are utilized. It is found that the design process is fairly inefficient and time-consuming because there are a lot of feedbacks. The axiomatic approach is used to investigate the design characteristics of the mount type HAVC control system and the Independence Axiom is utilized for the investigation. The Overall hierarchy is established up to the level of parts. It is found that the current design has many coupled and redundant aspects. The hierarchy is reorganized based on the Independence Axiom and a new design process is found. To exploit the new design process in practice, a design manual is made.

  • PDF

Thermal Design of a MR16 LED Light with the Effects of Ceiling Unit Mount (실링 유닛 장착효과를 고려한 MR16 LED 조명등 방열설계)

  • Hwang, Soon-Ho;Lee, Young-Lim
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.9
    • /
    • pp.3141-3147
    • /
    • 2010
  • The most important cause for shortening LED lighting efficiency and life is the junction temperature rises and, to solve this problem, various studies such as thermally efficient packaging, highly conductive material development, contact resistance improvement or heat sink optimization have been studied. However, most studies so far assumed that the LED lights are in the atmosphere, and thermal performance has not been therefore reported when the LED lights are mounted on the ceiling with ceiling unit. Thus, this study investigates the variation of junction temperature of the MR16 LED light under actual installation conditions and more accurate thermal design for the efficiency and life of LED lights is therefore achieved.

A Study on the Accelerated Life Test of BLDC Motor in Ceiling Mounted Digital Signage Rotating System (천정 거치형 디지털 사이니지 회전 시스템의 BLDC모터 가속수명시험에 관한 연구)

  • Kim, Ki-Hong;Kwon, Soon-Hong;Kwon, Soon-Gu;Park, Jong-Min;Kim, Jong-Soon;Jung, Sung-Won;Choi, Won-Sik
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.21 no.3
    • /
    • pp.141-147
    • /
    • 2018
  • In a time when product development cycles are getting shorter and shorter, many companies are making efforts to develop products with high reliability in a short period of time, accelerated life test is widely used as a method to quickly evaluate reliability. Accelerated life test reduces the test life or the life of the product from the observed data by shortening the lifetime of the product or abruptly lowering the performance under the worse condition than the actual condition in order to shorten the test cost or the test time. In this paper, BL3640A-06P+RB35, DC12V model, which is used in the support device of an automatic rotation type digital signage, which display various information such as textures and images on a display screen in a public place or a commercial space, BLDC motors were subjected to a constant stress test and at the rotational speed of 1rpm, $180^{\circ}$ rotation and reverse rotation under actual use conditions, the stress was imposed on the rotating speed of 2rpm and the weight of the actual installed product from 22.2kgf to 10kgf were installed. The lifetime of the actual use environment condition is 23,545 hours and the rotation speed is accelerated. The life time of the acceleration condition with the additional weight is 1,380 hours. The acceleration factor is calculated as 17.06, the one year guarantee test day is 235 days to 14 days, of the period from 470 days to 28 days, and the third year from 704 days to 42 days. The test date of the BLDC motor was tested on the shortened test date, and the rotational speed and the current value were measured. It is found that there is no defect even if it operates as the test date corresponding to the specified one year warranty period and the 3 year accelerated life test which is experimented. Using the statistical technique of the regression analysis the expected time for the motor to defect to #4 samples was 20 years.

Study of Optimal Light Scattering Pattern Design for Flat Lighting Device using Glass Light Guide (유리도광체를 이용한 평판조명용 광확산패턴의 최적설계 연구)

  • Han, Jeong-Min;Kim, Won-Bae
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.66 no.4
    • /
    • pp.242-246
    • /
    • 2017
  • In this study, it was investigated about optical simulation in high brightness and high uniformity general lighting using glass light guide plate. And we adopt edge-light emission type light plate. Edge-light type lighting has been used LCD application, especially note PC or smart phone backlight unit. Because it had the good properties such as slim shape and light weight. We thought this type was suitable for general lighting application such as wall attached type or ceiling mount type. But many of edge-light type lighting had problems. It called slanted output light rays. That was main key parameter how could control the direction of output light rays. We investigated the solution of this problems, using ray tracing method, we recognized the major fact of the solution relied on the geometric structure of diffusing dot shape. We set the conditions of aspect ratio in diffusing dot shape such as 0.5 to 1. And, at first, we designed diffusing dots shape based on the results of optical simulation and made specimen. as above condition, and acquired good result in confirming dots shape such as the value of the output rays's peak angle was around 75 degrees. And good light distribution characteristics were measured by slated spectro-radiometer. It was shown that the effective ways of designing light distribution characteristics using optical simulation such as ray tracing linear method for making general lighting using glass light guide plate.

Geophysical Exploration of Songsalli Ancient Tombs and Analysis of King Muryeong's Tomb Structure, Gongju (공주 송산리 고분군(公州 宋山里 古墳群)에서의 물리탐사와 무령왕릉(武寧王陵)의 구조분석)

  • Oh, Hyun-dok
    • Korean Journal of Heritage: History & Science
    • /
    • v.46 no.4
    • /
    • pp.4-23
    • /
    • 2013
  • Songsalli Ancient Tombs of Gongju consists of seven tombs. King Muryeong's tomb, the seventh tomb, is a brick chamber tomb discovered during the drainage works for the fifth and the sixth tombs in 1971. The excavation at the time focused on topographic surveys of the tomb entrance and the inside of the burial chamber as well as collection of the remains. The burial mount survey confirmed the status of some stone slab remaining and lime-mixed soil layers, but the survey did not examine the exterior structure of the whole tomb as the mounds were removed even more deeply. The excavation revealed damages to the bricks and mural damages due to moisture and fungus in the sixth and the seventh tombs. Between 1996 and 1997, Gongju National University conducted a comprehensive detailed survey of Songsalli Ancient Tombs including a geophysical survey, with an aim to identify the root causes of such degradation. Based on the results, repair took place in 1999 and the fifth, sixth and seventh tombs were placed under permanent conservation to conserve the cultural assets. General public is currently denied access. The purpose of this study was to conduct a three-dimensional resistivity and GPR surveys on the ground surface of the fifth, sixth and seventh tombs of Songsalli Ancient Tombs in order to understand the underground status after repair. The study also aimed to understand the thickness of all the tomb walls and exterior structure based on GPR inside King Muryeong's tomb. The exploration on the ground surface found that the three tombs and soil adjacent to the tombs had resistivity as low as 5 to $90{\Omega}m$, which confirmed that the soil water content was still as high as that prior to the repair work. Additionally, GPR found that the wall construction of the burial chamber of King Muryeong's tomb was approximately 70cm in thickness, while the structure was of 2B with two bricks, about 35cm in length, put together longitudinally(2B brick masonry). The pathway to the burial chamber was of the 2B structure just like that of the burial chamber walls, while its thickness was 80cm with an eyebrow-type arch connected to it. Also, the ceiling exterior appears to have an arch structure, identical to the shape inside.