• Title/Summary/Keyword: Cast-In-Place

Search Result 291, Processing Time 0.024 seconds

The Chosun Governor General Office's Administration regarding Official Documents (조선총독부 공문서(公文書) 제도 -기안(起案)에서 성책(成冊)까지의 과정을 중심으로-)

  • Lee, Seung-il
    • The Korean Journal of Archival Studies
    • /
    • no.9
    • /
    • pp.3-40
    • /
    • 2004
  • In this article, the elements usually included in the official documents issued by the Chosun Governor General office, the process of a certain document being put together and legally authorized, and its path of circulation and preservation are all examined. In order to create an official document of the Governor General office with legal authorization, a draft of a bill had to go through several discussions and a subsequent agreement before it was finally approved. Personnels involved in the discussion stage had the authority to ask for modifications and retouching of the draft, and the modifying process were all recorded in order to make clear who was responsible for a certain change or who objected to what at any given stage of the process. The approved version of an official document was called the 'Completed one(成案), and it was issued after the contents were turned into a fair copy by the office that originated the draft in the first place. With the original finalized version left in custody of that office, the fair copy was handed over to the Document department which was responsible for issuing outgoing documents. After the document was issued and the contained orders were carried out, the originally involved offices began to classify the documents according to their own standards and measures for safekeeping, but it was the Document department that was mainly responsible for document preservation. The Document department classified the documents according to related offices, nature of the documents(편찬류별), and most suitable preservation methods(보존종별). The documents were made into books, and documents to be permanently destroyed were handed over to the Account office where they would be demolished. The manners of document processing of the Chosun Governor General office was in fact a modified version of the manners of the Japanese government. Modifications were made so that the process would be more suitable to the situations and environment of the Chosun society. The office's managing process was inherited by the Chosun government after the Liberation, and cast a significant impact upon the document managing manners of the Korean authorities. The official document administration of the Chosun Governor General office marked both the beginning of the colony document administration, and also the beginning of a modernized document managing system.

Verification Study on the Treasure #634 of Silla Face-Inlaid Glass Bead: Focusing on the Design and Cultural Symbolic Elements (보물 제634호 신라 인면 상감 유리구슬의 검증 연구: 디자인과 문화 상징요소를 중심으로)

  • Misuk Choi;Hyo Jeong Lee;Youngjoo Na
    • Science of Emotion and Sensibility
    • /
    • v.26 no.4
    • /
    • pp.71-92
    • /
    • 2023
  • This study investigates the symbolism and meaning of the bead design, its relationship with the Silla culture, and the conditions of glass bead manufacturing to verify the theory of Silla's production of Silla face-inlaid glass beads with excellent artistry and technology. The research method includes investigating the design analysis, ancient documents, myths, relics, glass, and metal production techniques. Moreover, Hongshan cultural relics and other cases of inlaid glass beads were collected. There are records in the literature that the people of Makhan, Buyeo and Silla of ancient Korea people considered beads as treasures and used them for accessories. It was confirmed that all the design elements of the bead-patterned hair topknot, golden crown, birds, and flower trees were closely related to the myth of Kim Al-ji of Silla, the oviparous tales and the sacred birds and divine beasts of the north. Moreover, the pattern and arrangements were found to be similar in other Silla relics. The origin of beads and face pendants was Hongsan culture, and a stone cast for beads was discovered in Bukpyo of Gojoseon, the lower-level culture of Hajiajeom. In addition, excavating inlaid glass beads from Sik-ri tombs of Korea and a face-inlaid glass bead from Toganmori tombs in Japan confirms the theory of Silla's production. The fact that the Baekje people of ancient Korea had a glass bead manufacturing office in Japan in the fifth centuries suggests that the Silla people also had a manufacturing plant in Java, Indonesia, because this place was a crossroads of Silla's Sea Silk Road and a source of raw materials and labors with a close relationship to Silla. Therefore, the face-inlaid glass bead was indeed self-made by Silla, who possessed the tradition of bead myths and hair topknot, and the high-level skills such as gold crowns and metal inlays.

Behavior of Stud Shear Connectors in Precast Deck using Lightweight Concrete (경량콘크리트를 사용한 프리캐스트 바닥판에서 스터드 전단연결재의 거동)

  • Cho, Sun Kyu;Lee, Jong Min;Youn, Seok Goo;Choi, Yun Wang
    • Journal of Korean Society of Steel Construction
    • /
    • v.20 no.2
    • /
    • pp.227-236
    • /
    • 2008
  • The kind of concrete generally used in steel concrete composite bridges is normal-weight concrete whose unit weight is ${2,300kg/m^{3}}$. However, using lightweight concrete in composite bridges diminishes the sectional forces due to the self-weight of concrete decks. As a result, this will make the bridge design more economical. The type of concrete deck that could be adopted in composite bridges using lightweight con crete may be classified into Cast-In-Place (C.I.P.) concrete deck and precast concrete deck. These two types of decks have some differences with respect to structural behavior and constructional method, and hence,structural behavior of stud shear connectors that connect a concrete deck to a steel girder is changed with the type of deck used. In this study, push-out tests were conducted to evaluate the characteristics of static behavior of the stud shear connectors with a precast deck using lightweight concrete. Also, additional precast deck specimens with bedding layer that had shear keys and devices for transverse confinement of the bedding layer for the prevention of cracks occurring in the bedding layer were tested. These cracks The efficiency of these devices was then evaluated.

Semantic Network Analysis of Presidential Debates in 2007 Election in Korea (제17대 대통령 후보 합동 토론 언어네트워크 분석 - 북한 관련 이슈를 중심으로)

  • Park, Sung-Hee
    • Korean journal of communication and information
    • /
    • v.45
    • /
    • pp.220-254
    • /
    • 2009
  • Presidential TV debates serve as an important instrument for the general viewers to evaluate the candidates’ character, to examine their policy, and finally to make an important political decisions to cast ballots. Every words candidates utter in the course of entire election campaign exert influence of a certain significance by delivering their ideas and by creating clashes with their respective opponents. This study focuses on the conceptual venue, coined as ‘stasis’ by ancient rhetoricians, in which the clashes take place, and examines the words selection made by each candidates, the manners in which they form stasis, call for evidence, educate the public, and finally create a legitimate form of political argumentation. The study applied computer based content analysis using KrKwic and UCINET software to analyze semantic networks among the candidates. The results showed three major candidates, namely Lee Myung Bak, Jung Dong Young, and Lee Hoi Chang, displayed separate patterns in their use of language, by selecting the words that are often neglected by their opponents. Apparently, the absence of stasis and the lack of speaking mutual language significantly undermined the effects of debates. Central questions regarding issues of North Korea failed to meet basic requirements, and the respondents failed to engage in effective argumentation process.

  • PDF

Load Transfer Mechanism of Drilled Shafts in Weathered Rock (풍화된 암반에 근입된 현장타설말뚝의 하중전이기구)

  • ;Cho Sung-Min;Jung Sung-Jun;Kim Myoung-Mo
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.5
    • /
    • pp.187-196
    • /
    • 2005
  • Since the allowable bearing capacities of piles in weathered/fractured rock are mainly governed by settlement, the load-displacement behavior of pile should be known accurately. To predict pile head settlement at the design stage, the exact understanding of the load-transfer mechanisms is essential. Therefore, in this research, the load-transfer mechanism of drilled shaft socketed into weathered rock was investigated. For the investigation, five cast-in-place concrete piles with diameters of 1,000 mm were socketed into weathered gneiss. The static axial load tests and the load-transfer measurements were performed to examine the axial resistant behavior of the piles. A comprehensive field/laboratory testing program on weathered rock at the Held test sites was also performed to describe the in situ rock mass conditions quantitatively. And then, the effect of rock mass condition on the load transfer mechanism was investigated. The f-w (side shear resistance-displacement) curve of the pile in moderately weathered rock reached to yielding point at a for millimeter displacements, and after yielding point, the rate of resistance increment dramatically decreased. However, the f-w curve in the highly/completely weathered rock did not show the obvious yielding point, and the resistance gradually increased showing the hyperbolic pattern until relatively high displacement (>15 mm). The q-w (end bearing resistance-displacement) curves showed linear response at least until the base displacement of approximately 10 mm, regardless of rock mass conditions.

Characteristics of defect on segmental lining of TBM tunnel in operational subway (운용중인 국내 지하철 TBM터널의 세그먼트라이닝 결함특성 분석)

  • Choo, Jinho;Lee, DongHun;Noh, EunChul
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.1
    • /
    • pp.109-128
    • /
    • 2022
  • The precise inspection for safety and diagnosis (PISD) of tunnel has been conducted by the special act on safety control of public structures. However, the present assessment for the segmental lining of TBM tunnel has limitation such as: NDTs for integrity, segmental configuration for field inspection, and consideration for jacking system. Even if the number of TBM tunnel is less than 1% of enrolled facility in FMS, more attention to maintenance should be necessary due to its usage such as multi-use facility and national important facility. Compared to NATM tunnel, excavated by drilling and blasting and then installed lining by cast-in-place within 6~12 m, TBM tunnel is cut out ground by disk and cutter-bit and then assembled 7 pieces of precast segment, 1.2~1.4 m wide. Different features of design, construction, and maintenance should be considered to be more exact evaluation of TBM tunnel. The characteristics of defect is categorized and analyzed with 11 operational TBM tunnels in domestic subway. To be more comprehend various particular defects, foreign studies have been also adapted. Crack and leakage are categorized in 7 patterns. Breakage/spalling and corrosion are also grouped into 3 patterns. Patterned defects or damages are fed back in design, construction, and are useful guidelines for maintenance stage in future.

An Experimental Study of the Soil Nailed Wall Behavior with Front Plate Rigidity (전면벽체 강성에 따른 쏘일네일링 벽체의 거동특성에 관한 실험적 고찰)

  • Kim, Hong-Taek;Kang, In-Kyu;Kwon, Young-Ho;Park, Si-Sam;Cho, Yong-Hoon
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.3
    • /
    • pp.87-94
    • /
    • 2002
  • Recently, there have been numerous attempts to expand the traditional temporary soil nailing system into a permanent wall. Two reasons for this include the soil nailed system's advantage of efficient and economic use of subgrade space and its ability to decrease the total construction cost. However, the systematic and logical design approach has not been proposed yet. The permanent soil nailing wall system, which utilizes precast concrete from soil nailing system, is already used in many countries, but the study of cast-in-place concrete lacing or rigid walls in bottom-up construction of traditional soil nailing walls is imperfect and insufficient. In this paper, various laboratory model tests have been carried out to investigate the influence of parameters, including stiffness of the rigid wall to the soil nailing structure with respect to failure mode, displacement patterns and tensile forces at the nail head in several levels of load. Then, the variation of earth pressure distribution on the soil nailing wall, built with a rigid front plate, is sought through different levels of surcharge load and tensile forces at the nail head.

The Evaluation of flexure performance of SCP modules for LNG outer tank (LNG 외조탱크 적용을 위한 SCP 모듈의 휨성능 평가)

  • Park, Jung-Jun;Park, Gi-Joon;Kim, Sung-Wook;Kim, Eon;Shin, Dongkyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.1
    • /
    • pp.447-455
    • /
    • 2019
  • When constructing LNG storage structures using the cast-in-place method in extreme areas, the construction cost and time may be increased due to the poor working environments and conditions. Therefore, demand for modular energy storage tanks is increasing. In this study, we propose using an SCP module as an alternative for lighter-weight LNG storage tanks. The purpose of this study is to evaluate the feasibility of LNG storage outer tanks by performing bending tests on the thickness of composite steel plate concrete under field conditions. The loads on specimens with thicknesses of 100 mm and 200 mm were linearly increased to the design final loads of 413 kN and 822 kN, respectively. The slope was rapidly changed, and fracture occurred. The two test conditions showed linear behavior until the steel plate yielded, and after an extreme load behavior, sudden yielding of the steel plate yield occurred in the SCP bending test according to the INCA guidelines. The results satisfied the design flexural load and showed the possibility of using the specimens in a modular LNG outer tank. However, it is necessary to evaluate the structural performance of the SCP by performing compression and shear tests in future research.

A Study on Optimal Reinforcing Type of Precast Retaining Wall Reinforced by Micropiles (마이크로파일로 보강된 프리캐스트 콘크리트 옹벽의 최적보강형태에 관한 연구)

  • Kim, Hong-Taek;Park, Jun-Yong;Yoo, Chan-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.11
    • /
    • pp.89-99
    • /
    • 2006
  • The PCRW (Precast Concrete Retaining Wall) has many advantages compared with cast in place concrete retaining wall : shorter construction period, excellency of quality and minimum interference with the adjacent structure and traffics. However, shallow foundation type of PCRW, which has comparatively better ground condition, has some disadvantages such as difficulty in transportation and higher cost due to the size of PCRW being expanded by resisting only with self-weight if there is no other supplementary reinforcement. The presented study, in order to complement such disadvantages of PCRW, have applied the micropile method. The micropile method has advantages like low-cost and high-efficiency and does not require huge space, because it can be executed with small size equipment. However, the mechanical behavior characteristics of the PCRW reinforced by micropile, which is installed to improve the reinforcement effect, is not yet clearly identified and there is no suggested standard as to the length, diameter, install angle and install position of micropiles. Hence, this method is yet being designed depend on engineer's experience. In this study, various laboratory model tests as to sliding and overturning were performed in order to identify and present the optimum type of reinforcement and reinforcement effect of the PCRW reinforced by micropiles. In addition, it also executed numerical analysis for the purpose of verifying the optimum type of reinforcement for micropiles based on the results of laboratory model tests. The optimum reinforcement type of micropiles was estimated by model test and numerical analysis. The length of micropiles is 0.4 times wall height and the diameter is 0.04 times wall length.

Shear Strength of Prestressed PC-CIP Composite Beams with Vertical Shear Reinforcement (전단 철근 보강된 프리스트레스 PC와 CIP 합성보의 전단강도)

  • Suh, Jung-Il;Park, Hong-Gun;Hong, Geon-Ho;Kang, Su-Min;Kim, Chul-Goo
    • Journal of the Korea Concrete Institute
    • /
    • v.27 no.4
    • /
    • pp.399-409
    • /
    • 2015
  • Recently, the use of composite construction method using precast (PC) and cast-in-place (CIP) concrete is increased in modular construction. For PC members, pre-tensioning is used to improve efficiency of the structural performance. However, current design codes do not clearly define shear strength of prestressed PC-CIP composite members. In this study, 22 specimens were tested to evaluate shear strength of prestressed composite members with vertical shear reinforcement. The test variables were the area ratio of high-strength (60 MPa) to low-strength concrete (24 MPa), prestressing force of strands, shear span-to-depth ratio(a/d), and vertical shear reinforcement ratio. The test results showed the prestressing force did not completely restrain diagonal cracking of non-prestressed concrete in the web. Thus, the effect of prestress force was not insignificant in the effect for monolithic beams. The vertical shear strength and horizontal shear strength of the composite beams were compared with the strength predictions of KCI design method.