• Title/Summary/Keyword: Cast-In-Place

Search Result 292, Processing Time 0.027 seconds

Shear Strength of PC-CIP Composite Beams with Shear Reinforcement (횡 보강된 프리캐스트와 현장타설 콘크리트 합성보의 전단강도)

  • Kim, Chul-Goo;Park, Hong-Gun;Hong, Geon-Ho;Kang, Su-Min
    • Journal of the Korea Concrete Institute
    • /
    • v.26 no.2
    • /
    • pp.189-199
    • /
    • 2014
  • Currently, in the precast concrete construction, Precast Concrete (PC) and Cast-In-Place (CIP) concrete with different concrete strengths are frequently used. However, current design codes do not specifically provide shear design methods for PC-CIP hybrid members using dual concrete strengths. In the present study, simply supported composite beams with shear reinforcement were tested. The test variables were the area ratio of the two concretes, spacing of shear reinforcement, and shear span-to-depth ratio. The shear strengths of the test specimens were evaluated by current design codes on the basis of the test results. The results showed that the shear strength of the composite beams was affected by the concrete strength of the compressive zone and also proportional to the flexural rigidity of un-cracked sections. Furthermore, the contribution of shear reinforcements varied according to the concrete strength of the compressive zone.

Shear Strength of Prestressed PC-CIP Composite Beams without Vertical Shear Reinforcements (수직전단보강이 없는 PS 콘크리트와 현장타설 콘크리트 합성보의 전단강도)

  • Kim, Chul-Goo;Park, Hong-Gun;Hong, Geon-Ho;Kang, Su-Min;Suh, Jung-Il
    • Journal of the Korea Concrete Institute
    • /
    • v.26 no.4
    • /
    • pp.533-543
    • /
    • 2014
  • Currently, composite construction of prestressed Precast Concrete (PC) and Cast-In-Place (CIP) concrete with different concrete strengths are frequently used in the modular construction. However, current design codes do not clearly define shear design methods for such composite beams. In this present study, simply supported prestressed PC-CIP composite beams without vertical shear reinforcement or only with horizontal shear reinforcement were tested to evaluate the effect of prestressing on the shear strength and the shear design method for such composite members. The test variables were the area ratio of PC and CIP concretes, prestressing force, shear span-to-depth ratio, and shear reinforcement ratio. The results showed that the shear strength was increased by the increase of prestressing force and prestressed PC area, and the decrease of shear span-to-depth ratio.

Behavior of Steel-Concrete Composite Decks for PSC Girder Bridge with Various Shear Span Lengths (전단 지간의 변화에 따른 PSC 거더용 강-콘크리트 합성 바닥판의 역학적 거동)

  • Kim, Tae-Hyup;Park, Jun-Myung;Hong, Sung-Nam;Park, Sun-Kyu;Kim, Hyeong-Yeol
    • Journal of the Korea Concrete Institute
    • /
    • v.19 no.3
    • /
    • pp.275-281
    • /
    • 2007
  • Recently, steel-concrete composite structures are widely used in bridge and building constructions. In this paper, a new type of steel-concrete composite deck with profiled steel sheeting is proposed to replace the conventional cast-in-place reinforced concrete deck. Perfobond rib shear connectors were utilized to provide horizontal shear resistance between the profiled sheeting and the concrete. To validate the effectiveness of the proposed deck system, 8 full-scale deck specimens for PSC girder bridge were fabricated. The specimens were tested with four different shear span lengths to determine the horizontal shear resistance of the deck under a static monotonic loading. For comparison purpose, two reinforced concrete decks were also fabricated and tested. The horizontal shear resistance of the proposed deck system was calculated using the m-k method.

Experimental Study on Lateral Pressure Characteristics of a Formwork for High-Flowable and High-Strength Concrete (고유동 고강도 콘크리트용 거푸집의 측압 특성에 관한 실험적 연구)

  • Ko, Young-Kon;Kim, Cheol-Hwan;Hwang, Jae-Woong;Yi, Seong-Tae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.19 no.3
    • /
    • pp.130-138
    • /
    • 2015
  • In this study, to examine the application of cast-in-place of high-flowable and high-strength concrete, an experimental study on the lateral pressure of a formwork was preformed. The experiment specimens, which have different casting height and casting speed were prepared. The lateral pressure and the change of temperature from test specimens were obtained. The maximum lateral pressure was shown to lateral pressure of fresh concrete. Immediately after placing, the lateral pressure starts to decrease and, after 12 hours, it showed a stabilization. The decreased tend of the lateral pressure was similar with normal-strength concrete, which appears stabilization after 3~4 hours from casting completion. The more casting speed is fast, the more maximum lateral pressure is high, but pressure reduction with the lapse of time was nearly similar. In addition, it was found that there was no direct relation between the hydration heat and the lateral pressure reduction.

Study on critical buckling load calculation method of piles considering passive and active earth pressure

  • Chen, Yong-Hui;Chen, Long;Xu, Kai;Liu, Lin;Ng, Charles W.W.
    • Structural Engineering and Mechanics
    • /
    • v.48 no.3
    • /
    • pp.367-382
    • /
    • 2013
  • Different types of long slender pile shall buckle with weak soil and liquefied stratum surrounded. Different from considering single side earth pressure, it was suggested that the lateral earth pressure can be divided into two categories while buckling: the earth pressure that prevent and promotes the lateral movement. Active and passive earth pressure calculation model was proposed supposing earth pressure changed linearly with displacement considering overlying load, shaft resistance, earth pressure at both sides of the pile. Critical buckling load calculation method was proposed based on the principle of minimum potential energy quoting the earth pressure calculation model. The calculation result was contrasted with the field test result of small diameter TC pile (Plastic Tube Cast-in-place pile). The fix form could be fixed-hinged in the actual calculation assuring the accuracy and certain safety factor. The contributions of pile fix form depend on the pile length for the same geological conditions. There exists critical friction value in specific geological conditions that the side friction has larger impact on the critical buckling load while it is less than the value and has less impact with larger value. The buckling load was not simply changed linearly with friction. The buckling load decreases with increased limit active displacement and the load tend to be constant with larger active displacement value; the critical buckling load will be the same for different fix form for the small values.

Damage and deformation of new precast concrete shear wall with plastic damage relocation

  • Dayang Wang;Qihao Han;Shenchun Xu;Zhigang Zheng;Quantian Luo;Jihua Mao
    • Steel and Composite Structures
    • /
    • v.48 no.4
    • /
    • pp.385-403
    • /
    • 2023
  • To avoid premature damage to the connection joints of a conventional precast concrete shear wall, a new precast concrete shear wall system (NPSW) based on a plastic damage relocation design concept was proposed. Five specimens, including one monolithic cast-in-place concrete shear wall (MSW) as a reference and four NPSWs with different connection details (TNPSW, INPSW, HNPSW, and TNPSW-N), were designed and tested by lateral low-cyclic loading. To accurately assess the damage relocation effect and quantify the damage and deformation, digital image correlation (DIC) and conventional data acquisition methods were used in the experimental program. The concrete cracking development, crack area ratio, maximum residual crack width, curvature of the wall panel, lateral displacement, and deformed shapes of the specimens were investigated. The results showed that the plastic damage relocation design concept was effective; the initial cracking occurred at the bottom of the precast shear wall panel (middle section) of the proposed NPSWs. The test results indicated that the crack area ratio and the maximum residual crack width of the NPSWs were less than those of the MSW. The NPSWs were deformed continuously; significant distortions did not occur in their connection regions, demonstrating the merits of the proposed NPSWs. The curvatures of the middle sections of the NPSWs were lower than that of the MSW after a drift ratio of 0.5%. Among the NPSWs, HNPSW demonstrated the best performance, as its crack area ratio, concrete damage, and maximum residual crack width were the lowest.

Cyclic loading test for concrete-filled hollow PC column produced using various inner molds

  • Chae-Rim Im;Sanghee Kim;Keun-Hyeok Yang;Ju-Hyun Mun;Jong Hwan Oh;Jae-Il Sim
    • Steel and Composite Structures
    • /
    • v.46 no.6
    • /
    • pp.793-804
    • /
    • 2023
  • In this study, cyclic loading tests were conducted to assess the seismic performance of cast-in-place (CIP) concrete-filled hollow core precast concrete columns (HPCC) constructed using steel ducts and rubber tubes. The outer shells of HPCC, with a hollow ratio of 47%, were fabricated using steel ducts and rubber tubes, respectively. Two combinations of shear studs & long threaded bars or cross-deformed bars & V-ties were employed to ensure the structural integrity of the old concrete (outer shell) and new CIP concrete. Up to a drift ratio of 3.8%, the hysteresis loop, yielding stiffness, dissipated energy, and equivalent damping ratio of the HPCC specimens were largely comparable to those of the solid columns. Besides the similarities in cyclic load-displacement responses, the strain history of the longitudinal bars and the transverse confinement of the three specimens also exhibited similar patterns. The measured maximum moment exceeded the predicted moment according to ACI 318 by more than 1.03 times. However, the load reduction of the HPCC specimen after reaching peak strength was marginally greater than that of the solid specimen. The energy dissipation and equivalent damping ratios of the HPCC specimens were 20% and 25% lower than those of the solid specimen, respectively. Taking into account the overall results, the structural behavior of HPCC specimens fabricated using steel ducts and rubber tubes is deemed comparable to that of solid columns. Furthermore, it was confirmed that the two combinations for securing structural integrity functioned as expected, and that rubber air-tubes can be effectively used to create well-shaped hollow sections.

Study on seismic performance of shaking table model of full light-weight concrete utility tunnel

  • Yanmin Yang;Qi Yuan;Yongqing Li;Jingyu Li;Yuan Gao;Yuzhe Zou
    • Computers and Concrete
    • /
    • v.32 no.1
    • /
    • pp.15-26
    • /
    • 2023
  • In order to study the anti-seismic performance of full light-weight concrete utility tunnel, EL Centro seismic waves were input, and the seismic simulation shaking table test was carried out on the four utility tunnel models. The dynamic characteristics and acceleration response of the system consisting of the utility tunnel structure and the soil, and the interlayer displacement response of the structure were analyzed. The influence law of different construction methods, haunch heights and concrete types on the dynamic response of the utility tunnel structure was studied. And the experimental results were compared with the finite element calculation results. The results indicated that with the increase of seismic wave intensity, the natural frequency of the utility tunnel structure system decreased and the damping ratio increased. The assembling composite construction method could be equivalent to replace the integral cast-in-place construction method. The haunch height of the assembling composite full light-weight concrete utility tunnel was increased from 30 mm to 50 mm to enhance the anti-seismic performance during large earthquakes. The anti-seismic performance of the full light-weight concrete utility tunnel was better than that of the ordinary concrete utility tunnel. The peak acceleration of the structure was reduced by 21.8% and the interlayer displacement was reduced by 45.8% by using full light-weight concrete. The finite element simulation results were in good agreement with the experimental results, which could provide reference for practical engineering design and application.

Evaluation on Thermal Performance Along with Constructability and Economic Feasibility of Large-diameter Cast-in-place Energy Pile (대구경 현장타설 에너지파일의 열교환 성능과 시공성 및 경제성 분석)

  • Park, Sangwoo;Sung, Chihun;Lee, Dongseop;Jung, Kyoungsik;Choi, Hangseok
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.5
    • /
    • pp.5-21
    • /
    • 2015
  • An energy pile is a novel type of ground heat exchangers (GHEX's) which sets up heat exchange pipes inside a pile foundation, and allows to circulate a working fluid through the pipe for exchanging thermal energy with the surrounding ground stratum. Using existing foundation structure, the energy pile can function not only as a structural foundation but also as a GHEX. In this paper, six full-scale energy piles were constructed in a test bed with various configurations of the heat exchange pipe inside large-diameter cast-in-place piles, that is, three parallel U-type heat exchangers (5, 8 and 10 pairs), two coil type heat exchangers (with a 500 mm and 200 mm pitch), and one S-type heat exchanger. During constructing the energy piles, the constructability of each energy pile was evaluated with consideration of the installation time, the number of workers and any difficulty for installing. In order to evaluate the thermal performance of energy piles, the thermal performance tests were carried out by applying intermittent (8 hours operating-16 hours pause) artificial cooling operation to simulate a cooling load for commercial buildings. Through the thermal performance tests, the heat exchange rates of the six energy piles were evaluated in terms of the heat exchange amount normalized with the length of energy pile and/or the length of heat exchange pipe. Finally, the economic feasibility of energy pile was evaluated according to the various types of heat exchange pipe by calculating demanded expenses per 1 W/m based on the thermal performance test results along with the market value of heat exchange pipes and labor cost.

Evaluation on Flexural Performance of Precast Bridge Decks with Ribbed Connection (요철형 이음단면을 갖는 프리캐스트 교량 바닥판의 휨성능 평가)

  • Shin, Dong-Ho;Park, Se-Jin;Oh, Hyun-Chul;Kim, In-Gyu;Kim, Young-Jin
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.19 no.3
    • /
    • pp.1-9
    • /
    • 2015
  • Due to the increasing number of deteriorated bridges worldwide, the importance of maintenance and replacement of existing bridges are being emphasized. Cast-in-place concrete deck which is mainly applied to deck replacement of existing bridges have problems such as deterioration concerns by initial crack, labor cost increase, difficulties of maintenance and replacement, construction time increase, and indirect cost increase by traffic congestion. On the contrary, a precast concrete deck is considered as an effective alternative because of its quality assurance and accelerated construction. The connection method ensuring the required strength and durability is especially important, because the connection part of the precast concrete deck is vulnerable to cracks and leakage. Therefore, this study proposes precast bridge decks with ribbed connection which are more improved than existing bridge deck joints, and flexural performance is verified through various parameter tests.