• 제목/요약/키워드: Capacity plan

검색결과 728건 처리시간 0.028초

패스트 패션의 재고비용 최적화를 위한 상품공급 물량 산정 모델 (A Computation Model of the Quantity Supplied to Optimize Inventory Costs for Fast Fashion Industry)

  • 박현성;박광호;김태영
    • 산업경영시스템학회지
    • /
    • 제35권1호
    • /
    • pp.66-78
    • /
    • 2012
  • This paper proposes a computation model of the quantity supplied to optimize inventory costs for the fast fashion. The model is based on a forecasting, a store and production capacity, an assortment planning and quick response model for fast fashion retailers, respectively. It is critical to develop a standardized business process and mathematical model to respond market trends and customer requirements in the fast fashion industry. Thus, we define a product supply model that consists of forecasting, assortment plan, store capacity plan based on the visual merchandising, and production capacity plan considering quick response of the fast fashion retailers. For the forecasting, the decomposition method and multiple regression model are applied. In order to optimize inventory costs. A heuristic algorithm for the quantity supplied is designed based on the assortment plan, store capacity plan and production capacity plan. It is shown that the heuristic algorithm produces a feasible solution which outperforms the average inventory cost of a global fast fashion company.

고객수요를 고려한 열차용량패턴에 관한 연구 (Evaluation of Train Capacity Pattern Considering Customer Demands)

  • 김동희;김성호;홍순흠
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.507-513
    • /
    • 2004
  • In the railway system, transportation plan corresponds to a m aster plan for transport services. This service plan must be constructed to minimize operational cost or maximize revenue considering transportation demands and resource capacities in the railway operation company, and it includes several sub-planning activities such as train operation frequency plan, train (schedule) plan, train capacity assignment plan, and rolling stock requirement plan. In these sub- planning processes, train can be con side red as a product for providing customer services, and customer demands and operational advantages must be considered. In this paper, we present an effect estimation system for the train capacity pattern in a train schedule, and the effect of capacity pattern can be expressed as minimum spilled demand, minimum train service cost, and maximum train revenue or profit.

  • PDF

반도체 Probe 공정에서의 생산 능력 계획 (Capacity Planning and Control of Probe Process in Semiconductor Manufacturing)

  • 정봉주;이영훈
    • 산업공학
    • /
    • 제10권1호
    • /
    • pp.15-22
    • /
    • 1997
  • In semiconductor manufacturing, the probe process between fabrication and assembly process is constrained mostly by the equipment capacity because most products pass through the similar procedures. The probe process is usually performed in a batch mode with relatively short cycle times. The capability of the probe process can be determined by the optimal combination of the equipments and the products. A probe line usually has several types of equipment with different capacity. In this study, the probe line is modeled in terms of capacity to give the efficient planning and control procedure. For the practical usage, the hierarchical capacity planning procedure is used. First, a monthly capacity plan is made to meet the monthly production plan of each product. Secondly, the daily capacity planning is performed by considering the monthly capacity plan and the daily fabrication output. Simple heuristic algorithms for daily capacity planning are developed and some experimental results are shown.

  • PDF

전력수급기본계획에서 발전소 준공 불확실성에 대한 고찰 (A Study on the Uncertainty of Additional Generating Capacity in Long Term Electricity Plan)

  • 김창수;이창호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.843-845
    • /
    • 2005
  • The uncertainty of long term electricity plan consists of the uncertainty of demand forecast and additional generating capacity. Demand forecast is clearly improved the accuracy than the past through improving forecasting methods. However, the uncertainty of additional generating capacity is increased due to the change of market environment. In an operation by a sole utility, additional generating capacity would be possible by the regulation of government. Currently the generation companies have spined off from KEPCO and some IPPs participate the electricity market. It increases the uncertainty due to weakened regulation. Also the environment movement by NGOs and occurrence of civil affairs cause the increase of uncertainty. This research would analyze the current situation on the uncertainty of additional generating capacity and construction delays. Furthermore this research would present the plan to reflecting it in long term electricity plan.

  • PDF

CAPP에서 공정계획 선정을 위한 유전 알고리즘 접근 (A Genetic Algorithm A, pp.oach for Process Plan Selection on the CAPP)

  • 문치웅;김형수;이상준
    • 지능정보연구
    • /
    • 제4권1호
    • /
    • pp.1-10
    • /
    • 1998
  • Process planning is a very complex task and requires the dynamic informatioon of shop foor and market situations. Process plan selection is one of the main problems in the process planning. In this paper, we propose a new process plan selection model considering operation flexibility for the computer aided process planing. The model is formulated as a 0-1 integer programming considering realistic shop factors such as production volume, machining time, machine capacity, transportation time and capacity of tractors such as production volume, machining time, machine capacity, transportation time capacity of transfer device. The objective of the model is to minimize the sum of the processing and transportation time for all parts. A genetic algorithm a, pp.oach is developed to solve the model. The efficiency of the proposed a, pp.oach is verified with numerical examples.

  • PDF

경쟁체제 도입기의 수급안정화를 위한 설비투자 인센티브 설정 연구 (Investment Incentive for Capacity Supply in a Period of Introduction of competition)

  • 김창수;이창호;진병문
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 A
    • /
    • pp.406-408
    • /
    • 2000
  • Recently, Korea's electric industry is in the midst of a period of profound changes in the structure and function, including the introduction of market competition in the generation sector. Therefore, it is difficult to promote long-term capacity planning and new generating capacity construction which have been driven by KEPCO so far, after the introduction of market competition, so new generating capacity construction and security of reserve margin is needed through self·regulation plan of private generation producers by market mechanism. According to the competition in the generation sector, a new paradigm is necessary to the long-term capacity planning driven by the Government. This paper analyzes the plan and the incentive level able to guide the new generation capacity construction considering the uncertainty risk in a period of introduction of competition. In addition, this paper analyzes the plan able to guide the new capacity construction by market function at the stage which market become established and Government's role to solve the anxiety about the capacity supply and demand.

  • PDF

시뮬레이션을 이용한 블록조립 공정 능력 분석 (A Simulation-Based Capacity Analysis of a Block-Assembly Process in Ship Production Planning)

  • 송영주;이동건;조성원;우종훈;신종계
    • 대한조선학회논문집
    • /
    • 제46권1호
    • /
    • pp.78-86
    • /
    • 2009
  • A capacity calculation and process analysis is a very important part for the entire ship production planning. Ship's production plan is set up with a concept that the product is produced based on the capacity achievable by the processes while general manufacturing sets up the production plan based on product lead-time. Therefore, in case the calculation of capacity for each process of shipbuilding yard is different from actual conditions, a series of production plan - ship table composition, dual schedule plan and execution schedule plan, etc - may accumulate errors, lose reliability of planning information and cause heavy cost deficit in this course. In particular, in case of new shipbuilding yard, stocks between processes are built up and half blocks are not supplied in timely manner, and that is sometimes due to the clumsiness of the operator but it is more often because of the capacity to execute each process is not logically calculated. Therefore, this paper presents the process to calculate the assembly leadtime and assembly process capacity for shipbuilding yard assembly factory. This paper calculated the block type for calculation of assembly lead time based on block DAP(detailed assembly procedure), and introduced cases that calculate production capacities by assembly surface plate by considering the surface plate occupied area of the blocks that change depending on assembly field area and assembly processes through assembly simulation.

전력수급기본계획에 열병합발전 설비 반영 방법론의 개발 (The Development of Methodology in order to consider Combined Heat and Power in the Basic Plan of Long Term Electricity Supply & Demand)

  • 김용하;김미예;우성민;조성린;임현성
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제55권12호
    • /
    • pp.570-575
    • /
    • 2006
  • This paper develops methodology in order to consider CHP(Combined Heat and Power) capacity in the Basic Plan of Long Term Electricity Supply & Demand. We develop generating cost of CHP considering electric and heat. Also we develop mixed load duration curve which includes the electric load and heat load and then apply CHP capacity to SCM(Screening Curve Method) considering CHP feature. Accordingly, it decide the optimal CHP capacity in the Basic Plan of Long Term Electricity Supply & Demand. Also, We perform the sensitivity analysis according to cost variation.

에너지사용계획 협의대상 시설여부를 판별하기 위한 간편한 기준에 관한 연구 (A Study on the Simple Criteria to distinguish being or not facilities of Consultation about Energy Use Plan)

  • 서광수
    • 한국산학기술학회논문지
    • /
    • 제12권10호
    • /
    • pp.4704-4710
    • /
    • 2011
  • 본 논문에서는 사업주관자, 건축 및 시설관련 종사자 또는 행정관청 담당자 등이 건축물 또는 공장시설이 에너지사용계획 협의대상 시설에 포함되는지를 판별할 수 있는 간편한 기준을 설정하기 위하여 자료 분석 및 사례 분석을 실시하였다. 분석결과 건축물은 공공사업인 경우 연면적 75,000 $m^2$ 이상 또는 수전용량 9,000 kVA 이상을, 민간 사업인 경우 연면적 100,000 $m^2$ 이상 또는 수전용량 11,500 kVA 이상을 협의대상이 되는 기준으로 제시한다. 또한 공장 시설은 민간사업인 경우 수전용량 6,000 kVA 이상 또는 보일러 용량 24 톤/h 이상을, 공공사업인 경우 수전용량 3,000 kVA 이상 또는 보일러 용량 12 톤/h 이상이면 협의대상이 됨을 알 수 있다.

수질오염총량관리계획의 시행단계에서 오염부하량 할당방안 개선에 관한 연구 (A Study on Improved Allocations of Permissible Water Pollution Load at the Implementing Stage of Tatal Water Pollution Load Management Plan)

  • 김시헌;임재명
    • 환경위생공학
    • /
    • 제20권3호
    • /
    • pp.51-56
    • /
    • 2005
  • Allocation of water pollution load from loading capacity can be much essential, controversial, and its standards can be applied case-by-case to the various situations. Allocation methods to point sources are generally 'Equal effluent concentration', 'Equal percent Treatment', Loading capacity at planning stage consists of basic pollution load, development pollution load, reserved pollution load and margin of safety. But at the implementing stage loading capacity can be consisted of allocatable load and margin of safety to give more flexibility in the total water pollution load management plan. In that case, we can re-adjust and altogether use the pollution load of point sources of series and non-point sources at the implementing stage.