• Title/Summary/Keyword: CPM 모델

Search Result 28, Processing Time 0.033 seconds

A Connection of Information in the Ubiquitous Space (유비쿼터스 공간에서의 정보 연결)

  • Ko Sung-Bum
    • Journal of Internet Computing and Services
    • /
    • v.5 no.2
    • /
    • pp.1-15
    • /
    • 2004
  • The current Internet space is evolving to the so called Ubiquitous space. Unlike the Internet space, the information in the Ubiquitous space is distributed evenly in the places like computer's memory, human's brain and physical machine. The 'hypertext', the connection model of the information, which is originally designed for the Internet space doesn't suit well to the Ubiquitous space. From this point of view, we proposed the CPM model in this paper. The CPM model is designed for comprising the such three computing mechanism as analog computing, digital computing and human computing. In this paper, we showed that the characteristics of the CPM model might answer the such purpose as the connection of information in the Ubiquitous space.

  • PDF

Procedures of Transform IDEF3 Model into CPM Precedence Network Model for Process Analysis (프로세스 분석을 위한 IDEF3 모델을 CPM Network 모델로 변환하기 위한 절차)

  • 강동진;김경표;이상용;정용식
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 1999.05a
    • /
    • pp.135-144
    • /
    • 1999
  • A major concern in Concurrent Engineering is the control and management of workload in a period of process. As a general rule, leveling the peak of workload in a certain period is difficult because concurrent processing is comprised of various processes, including overlapping, paralleling and looping. Therefore, workload management with resource constraints is so beneficial that effective methods to analyze design process This study presents a procedure to transform the IDEF3 process model into the precedence logic network model for more useful assessment of the process. This approach is expected to facilitate resolving resource constrained scheduling problems more systematically in Concurrent Engineering environment.

  • PDF

Dongeui Visual-PERT/CPM for R&D Project Management (연구개발 프로젝트관리를 위한 시각화모델)

  • 황흥석
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.10a
    • /
    • pp.268-271
    • /
    • 2000
  • In these days, the technical advances and complexities have generated much of the difficulties in managing the project resources, both time and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgements concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a two-step approaches :in the step 1, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning, In the second step, we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. Computer implementation of this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of visual graphical. Also developed GUI-type program, Dongeui Visual-PERT/CPM. The results of this research will provide the project managers with an efficient management tool.

  • PDF

Procedures of Transform the IDEF3 Process Model of Concurrent Design into CPM Precedence Network Model (동시공학적 설계의 IDEF3프로세스 모델을 CPM Network 모델로 변환하기 위한 절차)

  • 강동진
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.4 no.2
    • /
    • pp.73-80
    • /
    • 1999
  • A major concern in Concurrent Engineering is the control and management of workload As a general rule, leveling the peak of workload in a period is difficult because concurrent processing is comprised of various processed, including overlapping, paralleling and looping and so on. Therefore workload management with resource constraints is so beneficial that effective methods to analyze design process are momentous. This paper presents a procedure to transform the IDEF3 process model into the precedence network model for more useful assessment of the process. This procedure is expected to facilitate resolving resource constrained scheduling problems more systematically in Concurrent Engineering environment.

  • PDF

Advanced Time-Cost Trade-Off Model using Mixed Integer Programming (혼합정수 프로그래밍 기법을 이용한 진보된 Time-Cost Trade-Off Model)

  • Kwon, Obin;Lee, Seunghyun;Son, Jaeho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.53-62
    • /
    • 2015
  • Time-Cost Trade-Off (TCTO) model is an important model in the construction project planning and control area. Two types of Existing TCTO model, continuous and discrete TCTO model, have been developed by researchers. However, Using only one type of model has a limitation to represent a realistic crash scenario of activities in the project. Thus, this paper presents a comprehensive TCTO model that combines a continuous and discrete model. Additional advanced features for non-linear relationship, incentive, and liquidated damage are included in the TCTO model. These features make the proposed model more applicable to the construction project. One CPM network with 6 activities is used to explain the proposed model. The model found an optimal schedule for the example to satisfy all the constraints. The results show that new model can represent more flexible crash scenario in TCTO model.

Evaluation of Conversion Action Data Mechanisms in Cost- Per-Action Advertising (Cost-Per-Action 광고 방법을 이용한 Conversion Action Data 메커니즘의 평가)

  • Li, Tian;Lee, Kyoung-Jun
    • Information Systems Review
    • /
    • v.10 no.2
    • /
    • pp.123-135
    • /
    • 2008
  • The online advertising industry's business model undertakes the change from CPM (cost-per-mille)-based to CPC(cost-per-click)-based. However, due to the problem of 'Click Fraud', CPA (cost-per-action) has been regarded as a new step. For CPA, publishers need to get information after a user clicks an advertisement. Therefore, in CPA, the key is to get Conversion Action Data (CAD). This paper introduces two existing mechanisms for getting CAD, compare their characteristics, and analyze their limitations. Then the two new mechanisms are introduced and their requirements and feasibility are analyzed. Lastly, we compare the existing two and the new two mechanisms, and point out each mechanism's business possibility, value and Application Area. This paper will help publishers choose the most appropriate mechanism on the basis of their situation.

Design and Analysis of Online Advertising Expenditure Model based on Coupon Download (쿠폰 다운로드를 기준으로 하는 온라인 광고비 모델의 설계 및 분석)

  • Jun, Jung-Ho;Lee, Kyoung-Jun
    • Journal of Intelligence and Information Systems
    • /
    • v.16 no.4
    • /
    • pp.1-19
    • /
    • 2010
  • In offline environment, unlike traditional advertising model through TV, newspaper, and radio, online advertising model draws instantaneous responses from potential consumers and it is convenient to assess. This kind of characteristics of Internet advertising model has driven the growth of advertising model among various Internet business models. There are, conventionally classified, CPM (Cost Per Mile), CPC (Cost Per Click), and CPS (Cost Per Sales) models as Internet advertising expenditure model. These can be examined in manners regarding risks that stakeholders should stand and degree of responsibility. CPM model that is based on number of advertisement exposure is mechanically exposed to users but not actually recognized by users resulting in risk of wasted expenditure by advertisers without any advertising effect. While on aspect of media, CPS model that is based on conversion action is the most risky model because of the conversion action such as product purchase is determined by capability of advertisers not that of media. In this regard, while there are issue of CPM and CPS models disadvantageously affecting only one side of Internet advertising business model value network, CPC model has been evaluated as reasonable both to advertisers and media, and occupied the largest segment of Internet advertising market. However, CPC model also can cause fraudulent behavior such as click fraud because of the competition or dishonest amount of advertising expenditure. On the user aspect, unintentionally accessed advertisements can lead to more inappropriate expenditure from advertisers. In this paper, we suggest "CPCD"(Cost Per Coupon Download) model. This goes beyond simple clicking of advertisements and advertising expenditure is exerted when users download a coupon from advertisers, which is a concept in between CPC and CPS models. To achieve the purpose, we describe the scenario of advertiser perspective, processes, participants and their benefits of CPCD model. Especially, we suggest the new value in online coupon; "possibility of storage" and "complement for delivery to the target group". We also analyze the working condition for advertiser by a comparison of CPC and CPCD models through advertising expenditure simulation. The result of simulation implies that the CPCD model suits more properly to advertisers with medium-low price products rather than that of high priced goods. This denotes that since most of advertisers in CPC model are dealing with medium-low priced products, the result is very interesting. At last, we contemplate applicability of CPCD model in ubiquitous environment.

Groundwater Flow Characterization in the Vicinity of the Underground Caverns by Groundwater Level Changes (지하수위 변화에 따른 지하공동 주변의 지하수 유동특성 해석)

  • 강재기;양형식;김경수;김천수
    • Tunnel and Underground Space
    • /
    • v.13 no.6
    • /
    • pp.465-475
    • /
    • 2003
  • Groundwater inflow into the caverns constructed in fractured rock mass was simulated by numerical modeling, NAPSAC (DFN, discrete fracture network model) and NAMMU (CPM, continuous porous media model), a finite-element software package for groundwater flow in 3D fractured media developed by AEA Technology, UK. The input parameters for modeling were determined on surface fracture survey, core logging and single hole hydraulic test data. In order to predict the groundwater inflow more accurately, the anisotropic hydraulic conductivity was considered. The anisotropic hydraulic conductivities were calculated from the fracture network properties. With a minor adjustment during model calibration, the numerical modeling is able to reproduce reasonably groundwater inflows into cavern and the travel length and times to the ground surface along the flow paths in the normal, dry and rainy seasons.

Analysis of Boundary Conditions for Activities' Relationships in Linear Scheduling Model (선형 공정계획 모델의 액티비티 관계의 경계조건 분석)

  • Ryu, Han-Guk;Kim, Tae-Hui
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.23-32
    • /
    • 2011
  • Domestic leading construction companies has been establishing and performing TACT scheduling method, similar to linear scheduling model such as line of balance and repetitive schedule, and etc. in which repetitive construction works are involved like high-rise building. Linear scheduling model has been researched as a visual scheduling method presenting the work space and time information. Likewise scheduling constraints of CPM network such as finish-to-finish, start-to-start, finish-to-start, start-to-start, linear scheduling model also has the relationships constraints, namely boundary conditions, between activities. It is especially necessary to define the boundary conditions of the activities' relationships in order to apply the linear scheduling model to be compatible with the network schedule. Therefore, this research considers the boundary conditions between activities for establishing the linear scheduling model. This paper also applies the proposed boundary conditions to TACT schedule and then deduces the main considerations in order to establish and perform TACT schedule.

An Administration Model for Causation of the Schedule Delays in Construction Projects (건설공사 공기연장사유 관리모델)

  • Kim, Jong-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.125-133
    • /
    • 2007
  • If project time extension were required in the construction projects, either liquidated damages or extension costs should be applied according to causation of the schedule delays. However, in actual cases it is not applied so far according to the contract conditions. The reason why this situation happened Is that function of the present planning and scheduling is not working feasibly. The CPM schedule could not provide a proper solution for apportioning responsibility for the schedule delays. This situation could be considered as breach of contract and will cause potential disputes for schedule delay. Therefore, in this research process based contract administration model for construction delay claim is proposed to prevent schedule delay and solve the claims. The model is based on pro-active management for causation of delay to provide apportionment of responsibility and written evidences.