A Study on the SE Cost Estimating for Smart UAV System using COSYSMO (COSYSMO를 이용한 SUAV 체계에 대한 SE 비용추정에 관한 연구)

  • Jung, Sung-Yong;Park, In-Kyoung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2008.10a
    • /
    • pp.448-452
    • /
    • 2008
  • Organization wishes to develop newer and more complex system according as social structure is more complex and a technology develops more. Therefore, field of system engineering in development of new system is realized by all-important essential boundary. However cost of SE have considered restrictively being not about SE cost having applied SE. About this problem, this study provides COSYSMO as model for SE cost estimation, as the application example, estimate SE cost for smart UAV system applying COSYSMO in PRICE Trueplanner.

  • PDF

A Study on the Cost Model for Implementation of SE for the Light Rail Transit Project (경량전철 사업의 SE 적용을 위한 비용 추정 모델 연구)

  • Kim, Chul Whan;Han, Myeong-Deok;Lee, Jae Hong;Lee, Chang Young
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.1
    • /
    • pp.1-7
    • /
    • 2012
  • This research aims to propose a model to estimate the appropriate SE Cost rate to the total project cost when systems engineering applied to light rail transit project. In this research an investment cost estimation model is proposed with reference to COSYSMO (Constructive System Engineering Cost Model). This model includes four input factors such as requirement numbers, interface numbers, algorithm numbers, and scenario numbers. When 2600 requirement numbers are considered on a proposal document with 350 pages in a light rail transit specification of 500 billion~trillion won scale, COSYSMO demo version estimates 42.5 billion won of SE cost (about 5% of total project cost or about 10% of E&M cost).

SE, CM, EVM 통합을 통한 사업 관리 향상 방안

  • Seok, Yeon-Suk;Gang, Seong-Jin;Park, In-Gyeong;Gwon, Yong-Su
    • 한국경영정보학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.1023-1029
    • /
    • 2007
  • 우리는 국가 경쟁력의 한 분야인 사업관리에 있어 계획, 수행, 성과관리, 개선에 최적의 프로세스 보유가 요구된다. 그러나 Project관리체계의 현 실태는 일정관리, 범위관리, 비용관리에 초점을 맞춘 일정관리체계, WBS(Work Breakdown Structure) 및 OBS(Organizational Breakdown Structure)관리, 비용관리체계의 부분 통합 혹은 서로의 연계 정도이다. 본 연구는 최적의 사업관리를 위하여 계약관리에 체계공학을 연계하여 계약 전에 WBS, IMP/IMS(Integrated Master Plan)/(Integratcd Master Schedule), TPM(Technical Performance Measurement) 등의 SEP(Systems Engineering Plan)와 계약 후의 이행을 검증 할 수 있는 과정의 Guideline을 제시하고, IEEE 1220, ANSI/EIA 632 순기 의거 개념설계부터 통합시험에 이르는 체계공학 순기에 따른 비용예측이 가능한 USC(University of Southern CalIfornia) 대학의 COSYSMO (Constructive Systems Engineering Cost ModeI)를 소개하고 적용 가능성을 고찰하며, Project의 전순기에 걸쳐 TPM 혹은 Quality를 비용과 일정에 통합하여 관리하는 PBEV(Performance Based Earned Value)모델을 소개하고 적용 가능성을 제시한다. Project 관리에 있어 System 차원을 강조한 SE(Systems Engineering), 비용예측의 CM(Cost Management), 성과관리를 위한 EVM(Earned Value Management)의 통합은 사업 관리에 역량을 강화하며 경쟁력을 향상 시킬 수 있는 적절한 접근으로 사료된다.