• 제목/요약/키워드: COST MODEL

검색결과 7,831건 처리시간 0.04초

의료보험 의약품 관리원가의 정의 및 산정모형 개발 (Definition of Medical Drug Administration Cost and Development of Its Costing Model under the Korean Medical Insurance Fee-for-Service System)

  • 황인경
    • 보건행정학회지
    • /
    • 제9권1호
    • /
    • pp.1-29
    • /
    • 1999
  • The Government has recently planned to improve the medical insurance drug price systems by removing the drug margin occurring from the difference between the official and purchasing prices, and instead by setting prices through adding drug administration casts calculated to the purchasing costs. In the circumstances, the major policy and implementing issues are how to define the drug administrance cost and how to calculate them. This study attempts to provide for the conceptional and operational definitions and thereby develop a costing model for the cost. The relationship between the current systems of medical services costs and prices were reviewed to define the concept of the costs. The study defined the costs from the narrow and wide prospective of meaning, and three operational definitions were provided. The costing model was developed applying the departmental costing principles. Finally, several prerequisites that have to be considered for the implementation of the definition and the model from the practical viewpoint.

Object oriented generic cost modeling for integrated CAD system

  • Lee, Chang-Ho
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1994년도 춘계공동학술대회논문집; 창원대학교; 08월 09일 Apr. 1994
    • /
    • pp.715-725
    • /
    • 1994
  • The objective of this research is to develop a cost model for integrated CAD system. A computerized system realizing this model then is used to aid designers. The first area is to propose a conceptual framework of a multilevel cost model. The methodology of constructing the model is discussed. Then suggestion of an object oriented programming technique for implementing the model is presented. Complicate estimation procedure can be systematically handled by this technique. Interval analysis to deal with the uncertainty of information and decision during design process is used. An experimentation algorithm for calculating the cost distribution is proposed to overcome the shortcoming of interval analysis. Major focus of this research is on net shape manufacturing processes including die casting, injection molding, and metal forming.

Decision Support Tool for Excavation Operation using Genetic Algorithms

  • Lee, Ung-Kyun;Kang, Kyung-In;Cho, Hun-Hee
    • Architectural research
    • /
    • 제8권2호
    • /
    • pp.43-48
    • /
    • 2006
  • The appropriate fleet estimation of the excavation equipment is a major factor in the determination of the cost and time requirements of a project. But the decision of what kind of equipment selected is often based on heuristic methods or trial and error in Korea. Thus, this study proposes a prototype model that uses genetic algorithms to select fleet estimation of loaders (backhoe) and trucks used in excavation work. To verify the applicability of this model, the case study was performed. And the result of the genetic model was compared with that of the trial & error method. The use of the genetic model suggested this study required 44days, 2 units of backhoes, 7 units of trucks, and a total cost of 171,839,756 won. With the estimated fleet number of equipment, the minimum cost of excavation work can be calculated, taking account of the time-cost trade-off. By utilizing this prototype model, the efficiency of excavation work can be improved.

교량 유지관리 의사결정 지원을 위한 개축비용 산정모델 개발 (Development on Reconstruction Cost Model for Decision Making of Bridge Maintenance)

  • 선종완;이동열;이민재;박경훈
    • 한국산학기술학회논문지
    • /
    • 제17권9호
    • /
    • pp.533-542
    • /
    • 2016
  • 교량의 유지관리 비용은 교량 건설 후 주기적으로 발생하게 되며 교량의 상태, 환경 조건 등 여러 요인들이 복합적으로 고려되어야 한다. 개축은 유지관리 단계에서 발생하는 조치 중 가장 최종적이며 대규모 비용이 투입되는 조치로서 교량 유지관리 의사 결정 지원을 위해서는 기본적인 개축 비용 산정 모델의 수립이 필수적이다. 본 연구에서는 교량의 개축 비용 산정을 위한 회귀 모델을 개발하였다. 이를 위해 교량관리시스템(Bridge Management System) 데이터베이스(database) 상의 교량 기본 제원을 분석하여 교량 형식별, 구성 요소별 대표 표본과 주요 영향 인자들을 정의하였다. 각 표본별 비용 산정변수를 고려하여 내역 작업을 수행하였다. 비용 산정 변수에 따른 대표 표본의 적산 결과를 회귀분석하여 상부구조, 하부구조, 기초 등의 신설 비용과 가교 설치 비용, 해체 폐기 비용에 대한 비용 모델을 도출하였다. 개발된 비용 모델을 활용하여 공용 중인 교량 형식별 개축 비용을 도출하고 단가를 산출하여 기존 문헌과의 비교 검토를 수행하였으며, 유지관리 의사결정에 효과적으로 활용될 것으로 기대된다.

Cost Estimation for ISO 9000 Certification in Japanese Companies

  • Yamada, Shu
    • International Journal of Quality Innovation
    • /
    • 제2권1호
    • /
    • pp.117-128
    • /
    • 2001
  • It is widely recognized that ISO 9000 certification bring some profits, such as enhancement of quality system and some concerns. Since one of the major concerns is cost for certification, this paper considers the cost for ISO 9000 certification in Japanese companies through review some winning reports and case studies. Specifically, a model that describes the certification activities and their cost is derived through reviewing some winning reports in order to give a framework of cost estimation. Based on the model, we estimate the certification cost in an electric division of a company through an interview survey. Furthermore, we focused on the cost for promotion and administration as a cost for the sake only certification, because these activities will not be needed if a company does not implement ISO certification. It is concluded that this cost may vary approximately 300,000-700,000 (US$) per certification by the interview and telephone surveys to Japanese steel companies.

  • PDF

공공업무시설의 수선비 조사를 통한 연차별 비용변화 패턴 및 수선비 항목별 발생빈도와 평균비용 분석 (A Study on cost expenditure characteristics and importance level of each maintenance item of public office buildings by conducting cost surveys)

  • 최석규;김갑열
    • KIEAE Journal
    • /
    • 제8권1호
    • /
    • pp.111-118
    • /
    • 2008
  • To maintain the public office buildings, the related government employee uses cost under the limited budget. it is difficult to execute the budget as is assigned to maintenance items with contemplating the characteristics such as frequency, cost/item, weighting factor, and etc. As a precedent study about this cost-efficiency model, this study is intended to show the expenditure trends, frequencies, and cost distributions of maintenance items for the development of cost-efficiency model by analyzing time series data from the surveys on maintenance costs of the selected public office buildings.

중저진 지역에서의 지진격리교량의 경제적 효율성에 관한 연구 (Cost Effectiveness of Bse-Isolation for Bridges in Low and Moderate Seismic Region)

  • 고현무
    • 한국지진공학회:학술대회논문집
    • /
    • 한국지진공학회 1999년도 춘계 학술발표회 논문집 Proceedings of EESK Conference-Spring
    • /
    • pp.178-185
    • /
    • 1999
  • Minimum life-cycle cost helps to evaluate cost effectiveness of base-isolated bridges under specific condition. Life-cycle cost mainly consists of the initial construction cost and the expected damage cost. Damage cost estimation needs proper model of input ground motion failure probability evaluation method and limit states definition. We model the input ground motion as spectral density function compatible with the response spectra defined at each seismicity and site condition. Spectrum analysis and crossing theory is suitable for reseating calculation of failure probabilities in the process of cost minimization. Limit states of base-isolated bridges re defined for superstructure isolator and pier respectively The method is applied to both base-isolated bridges and conventional bridges under the same conditions to investigate cost effectiveness of base isolation in low and moderate seismic region. the results show that base-isolation of bridges are more effective in low and moderate seismic region and that the site effects on the economical efficiency may not be negligible in such a region.

  • PDF

개인여행비용법(Individual Travel Cost Model)에 의한 금정산 방문객의 경제적 가치추정 (A Study on the Estimating Visitor's Economic Value of the Mt. Kumjung by Using Individual Travel Cost Model)

  • 주수현;이동철;허윤정
    • 경영과정보연구
    • /
    • 제33권2호
    • /
    • pp.301-315
    • /
    • 2014
  • 부산의 금정산은 도시 숲의 중요성이 부각되면서 시민들의 방문이 증가하고 있으며 이로 인해 생태계 보전을 위한 비용은 증가하고 있다. 도시 숲에 대한 보전과 이용의 양 측면을 고려하면서 지속가능한 환경자원으로서 금정산을 보호하기 위해서는 비용편익 관점에서 정책적 판단이 중요해지고 있다. 이와 관련하여 도시 숲의 편익을 화폐적 가치로 측정하여 환경정책의 경제적 효율성을 확보하자는 취지에서 금정산의 가치를 추정하였다. 본 연구에서는 금정산을 당일 방문한 20세 이상의 성인 남녀를 개인면접의 방식으로 설문을 조사하여 개인여행비용법(ITCM)으로 가치를 추정하였다. 종속변수인 여행횟수가 특성상 비음정수이므로 가산자료모형인 포아송 모형, 음이항 모형, 절단된 포아송 모형 및 절단된 음이항 모형을 사용하였다. 분석결과를 바탕으로 추정된 금정산의 1회 여행에서 얻은 경제적 가치는 60,669원이고, 총경제적 가치는 252,383원으로 계산되었다. 여행비용(COST)을 적용하였을 때 절단된 음이항 모형으로부터 관광수요모형을 추정하여 보니 예상했던 바와 같이 여행비용(COST)이 적을수록 여행 횟수가 증가하였고, 연령(AGE), 결혼여부(MAR), 그리고 경관 만족도(SATI)는 방문수요에 영향을 미치지 못하는 것으로 분석되었다.

  • PDF

표준단면을 이용한 터널 공사비 예측모델 개발 (I) - 공사비 영향요인 분석 - (Tunnel Cost Estimating Model Based on Standard Section and Cost Variance Index (I) - Analysis Of Critical Cost Factors -)

  • 조정연;김경주;김경민;김상귀
    • 대한토목학회논문집
    • /
    • 제28권5D호
    • /
    • pp.665-675
    • /
    • 2008
  • 본 연구는 터널공사를 대상으로 사업 초기단계에서 터널공사의 설계 대안에 대한 공사비를 신속히 추정하고, 사업이 진행되면서 상황변화에 따른 사업비 측면에서의 영향을 파악할 수 있도록 함으로써, 적정한 의사결정을 지원하기 위한 개략적 터널공사비 추정모델 제시를 목적으로 한다. 이를 위해 터널공사의 수행에 있어 공사비에 영향을 미치는 요인을 분석하고, 공사비 영향요인별 공사비 변화의 정도를 분석하였다. 공사비 영향요인은 천공방식, 굴착방법, 기폭장치, 적재장비 용량, 버력의 단위중량 및 토량환산계수, 터널 연장을 포함하는 7개의 요인을 대상으로 하여 각 영향요인의 변화에 따른 공사비 변동 크기를 분석하였다. 분석결과는 기획단계에서 사업의 기본적인 조건을 바탕으로 사업비를 추정하고, 설계 및 시공단계에서 설계 대안에 대한 공사비의 영향을 효율적으로 평가하는데 필요한 공사비 추정모델의 구축을 위한 기초정보를 제공할 것으로 기대된다.

경사제 피복재의 예방적 최적 유지관리를 위한 추계학적 기대비용모형의 개발 (Development of Stochastic Expected Cost Model for Preventive Optimal- Maintenance of Armor Units of Rubble-Mound Breakwaters)

  • 이철응
    • 한국해안·해양공학회논문집
    • /
    • 제25권5호
    • /
    • pp.276-284
    • /
    • 2013
  • 비선형 누적피해모형과 경제성 모형을 결합하여 경사제 피복재를 예방적으로 최적 유지관리할 수 있는 추계학적 기대비용모형을 제안하였다. 기존 모형과의 비교를 통해 만족스럽게 검증되었으며, 관련 변수들의 민감도 분석도 자세히 수행하였다. 구조물의 중요도, 피해강도함수 그리고 저항한계에 따른 단위시간당 기대비용이 최소가 되는 최적의 보수 보강 시간을 산정할 수 있었다. 마지막으로 개발된 추계학적 기대비용모형을 경사제 피복재에 적용하였다. 구조물의 유지관리 비용과 편익을 최적화하여 어느 시점에 설계 당시 수준으로 보수 보강이 이루어져야 하는지를 정량적으로 결정할 수 있었다.