The Basis research Developing Assessment tool for Construction Management through Check List of Critical Success Factor (CM의 핵심석공요인 체크리스트 개발을 통한 CM적용효과 평가기법 개발 기초연구)

  • Lee Tai Sik;Choi Jae-Ho;Kim Young-Hyun;Park Jang-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.337-340
    • /
    • 2003
  • Currently the number of project ordered as Construction Management is increasing. In advanced country, critical success factor of construction industry and case study is used for increasing productivity of construction project. This study presents the check list of critical success factor and analyzescase study of Construction management project in order to apply Construction Management Project in domestic industry.

  • PDF

Best Practice in CM Application: Muju Waterways Flood Recovery CM Case (CM 적용 모범선행사례: 무주군 지방하천 1,2급 수해복구 공사)

  • Yu Jae-Hee;Choi Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.27-31
    • /
    • 2003
  • 최근 해외시장에서는 Single Point Responsibility 개념의 선호와 프로세스사업관리능력의 중요성으로 건설사업관리 (Construction Management: 이하 CM)방식이 프로젝트 조달의 중요한 방안으로 사용되며 국내에서도 최근 CM 발주량의 획기적인 증가추세로 사업수행능력 향상을 위한 도구 개발이 절실하다. 가장 유용한 도구로는 국내${\cdot}$외 CM 수행사례 분석을 통해 이에 저해되는 요인과 모범사례 등을 파악하여 산업계로 하여금 체계적 점검과 벤치마킹을 통해 수행능력을 제고할 수 있는 핵심성공요인과 Best Practice의 보급 발간이다. 따라서 본 논문은 최근 감사원에 의해 모범선행사례로 선정된 무주 하천 1,2급 수해복구 건설사업관리 용역에 대한 CM성과를 분석하여 핵심성공요인과 Best Practice를 제공하는 것을 주요 목표로 한다. 본 CM용역에서는 무엇보다도 무주군내 수해복구공사에 CM 사업방식을 도입한 것은 현명하고 진취적이며 시기 적절한 일이라고 판단되며 이러한 선도적 기자체의 의욕적인 시도가 지방에서 수행되는 공공공사의 수준을 한 차원 높이는 계기가 됨은 물론 항구적인 복구공사기법의 하나로 정착하기를 기대한다. 또한 산업계는 CM관련 중심기관을 통하여 이러한 모범사례의 연속적인 분석과 보급을 통해 산업계 전반적인 CM수준을, 제고하여 국내외 CM확대 적용의 기반을 조속히 조성할 수 있기를 바란다.

  • PDF

Linking Critical Success Factors, Implementation Attitudes and Performance of Cellular Manufacturing Systems (셀 제조시스템의 핵심성공요인, 수용태도, 성과간의 관련성에 관한 연구)

  • 육근효
    • Korean Management Science Review
    • /
    • v.18 no.1
    • /
    • pp.89-105
    • /
    • 2001
  • The performance of Cellular Manufacturing (CM) systems has been rigorously investigated during the last two decades, but the extent of empirical research on CM is limited. A major objective of this study is to examine the relationship between critical success factors, employees' implementation attitudes and performance of CM systems. Two hypothesis were formulated &d Tested: (1) The impact of critical success factors on performance and to what extent does certain critical success factors correlate with performance\ulcorner (2) How does the relationship between critical success factors and performance differ by employees' implementation attitudes\ulcorner Results from the study provide partial support for relationship between critical success factors (infrastructure, organizational immersion, autonomous management) and performance. The results also show that differences in performance of organizations grouped by degree of employees' attitudes could be found.

  • PDF

CSFs Extraction and AHP Importance Analysis for Construction Technology Services Evaluation in terms of Construction Manager (건설사업관리자(CMr) 측면에서 건설기술용역 평가의 CSFs 추출 및 AHP 중요도 분석)

  • Yang, Jin-Kook;Hong, Seong-Wook
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.129-134
    • /
    • 2020
  • The current evaluation time period for the construction management service is the project completion or after project completion. Therefore, the construction manager has the following problems. First, it is difficult to prepare the evaluation due to the new field movement of the existing participating engineer. Next, the CM work is complex as well as extensive. Therefore, the critical success factors of the construction technology services evaluation are required as a systematic performance standard of CM work. In this study, we extracted the critical success factors that can systematically prepare the evaluation from the early stage of the project through in - depth interviews with experts. And, this study was analyze the priority of each factor by using AHP technique. As a result, the most important factors were related to the systemization of the preparation process, the construction manager work capabilities and practical construction management. And the priorities of all factors were analyzed high in the factors suggested by the owner groups. The results of this analysis are expected to provide the standards that construction management service performer carry out structured management of construction management throughout the project.