The Case of CM Type Supervision Apartment House Construction Work - Focused on the Case of Baekseok-Cheonan 2BL Construction Work - (공동주택건설공사의 CM형 책임감리 사례 - 천안백석 2BL 아파트건설공사 사례를 중심으로 -)

  • Lee, Kab-Weon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.41-48
    • /
    • 2004
  • The objective of the CM model projects is to achieve gradually the development of Domestic Construction, Industry with function, effects, problems and improvement which are the results after assessing tills finished project on the basis of CM Plan. The result is very useful of being activated CM and giving good orders continuously. Therefore this study describes work scope, organization, performance and management process for Baekseok-Cheonan 2BL project and picks out practical problems about CM and then suggests CM technical development directions and institutional improvements.

  • PDF

A Review of the Improvement of Construction Management (CM) System and the CM Policy for the Public Construction Works (공공사업의 CM제도 개선 및 정책방향)

  • Jang Kie-Chang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.207-212
    • /
    • 2002
  • The Construction Management(CM) System in Korea is systematized both in name and reality by being prescribed in Construction Industry Act('97) and Construction Management Act('01) through various discussions considering reformation of construction industry structure and enhancement of construction technology competitiveness. Specially in the public construction works, CM Pilot Project is promoted by central government for the activation of CM system introduced for efficiency of public construction project. The promotion of Pilot Project is not only the settlement and activation of CM system but also the process to embody and diversify the CM system. Now we should develop various CM application type such as Owner type, PM type and type for private capital project in doing so. And with this efforts, we could expect that CM system should play an important role to enhance the efficiency of public construction works and should affect private construction sector.

  • PDF

Performance Analysis of Pre-Construction Phase of CM at Risk Project in Public Sector (공공부문 시공책임형 CM 사업의 시공이전단계 성과분석)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.97-105
    • /
    • 2021
  • The CM at Risk project, which started with the aim of strengthening the global competitiveness of the domestic construction industry through innovation of ordering system, is being implemented in the form of pilot projects in the public sector. However, it seems that it is necessary to enact related laws and regulations to move to the formal ordering system, and the performance analysis of the project is still insufficient. In this paper, the effectiveness and reliability of the project were verified through the performance analysis of the Pre-Construction Service of the four pilot projects currently being implemented. The results of the study were analyzed in five areas including Team Building, Design Book, Construction Period, VE, and BIM. Through the interview survey, the problems were confirmed and improvement plans were presented. The results of this study are expected to be used as basic data for the legalization of ordering system to be implemented in the future.

Major Risk Factors to Implement CM at Risk Pilot Project on the Public Sector (시공책임형 CM 발주방식 공공부문 시범사업 사례를 통한 리스크 도출)

  • Han, Jonghoon;Kim, Kyungtae;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.61-69
    • /
    • 2018
  • The buildings are getting enormous and more complex as well as the requirement of the owner which wants diverse and efficient. Moreover advanced management is necessary for construction services and a new method of delivering project is now required. In order to expand the delivering method and the construction industry, we have to introduced the CM at Risk method. However, despite the fact that six years have passed already the CM at Risk regulation was introduced, the contract amount in significantly lower than that of the CM for fee, and also there is no CM at Risk project in the public sector. As a result, three pilot projects are currently underway for the LH(Korea Land & Housing Corporation) in order to set up a CM at Risk for the public sector. However, detailed regulations related to CM at Risk have not yet been implemented in Korea. Therefore, in this study, I am trying to understand the risks that could incur when practitioners participate in the three pilot projects that are currently underway and employed in the public sector wherein the CM at Risk is normally introduced. Based on the results of this study, It will be able to utilize as a basic data for future CM at Risk delivery system improvement and enactment.

The Construction Management Plan of Dong Myoung Service Area (동명휴게소 건설사업관리 수행계획)

  • In Chi-Sung;Kim Jeong-Won;Jung Soon-Gil;Park Gwon-su;Lee Sung-Gak;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.40-47
    • /
    • 2003
  • The main purpose of Construction Management(CM) is the improvement of efficiency and effectiveness of the project with construction methodologies systematically and technically. This pilot project Dong Myeong Service Area and Gas Station project among 5 projects designated and supervised by Ministry of Construction and transportation(MOCT), is to reduce cost, to maintain and control schedule, to keep proper quality, Claim and Risk through Partnering, Design Review, Constructability, Value Engineering and Project Management Information System(PMIS) and so on. Major factors of CM Plan are introduction of the phased and classified Construction Management Services from initiation of project to completion and adaptation of CM technologies and guide the implementation methodologies of the CM Pilot Project in CM construction market.

  • PDF

A Study on the Application of Design VE Process in Pre-Construction Phase for GMP Determination of CM at Risk Project (시공책임형 CM 사업의 GMP 결정를 위한 시공이전단계 설계VE 프로세스 적용방안 도출)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.56-64
    • /
    • 2022
  • Although pilot projects have been actively carried out from 2017 to present to institutionalize CM at Risk, one of the major tasks for innovation in the construction industry, standards and processes related to Design VE, a key tool for determining GMP in the pre-construction phase, have not yet been established. Therefore, through research and operation status related to CM at Risk and Design VE, and survey on project participants' perception, the problem of the existing design VE process was derived, and the design VE process suitable for the CM at Risk project was proposed. The application plan was proposed in three aspects: Schedule, Cycle, and Process, and the appropriateness and applicability were verified through FGI. The results of this study are expected to be used as basic data on the establishment and legislation of order standards to be made in the future.

A Study on the Role of Construction Management in the Construction Turn-Key Projects (턴키사업과 CM의 역할)

  • Kim Kyung-Nam;Kim Jong-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.223-232
    • /
    • 2002
  • The government, in order to settle and activate the use of Construction Management (CM) method, clarified the legal Issues pertaining to infrastructure development and is taking an active role to promote CM through government sponsored pilot projects. However, when a CM method is applied to a turn-key protect, many applicational difficulites are expected. With design and construction are performed under the simple responsibility in a turn-key method, roles of CM's is overlapped. Also, the characteristics of turn-key method are not reflected to the present $\lceil$CM Work Guideline$\rfloor$. Over the years, various problems have been identified from turn-key projects. Korea's $\lceil$CM Work Guideline$\rfloor$ is more inclusive compared to the CM services of CMAA and overlooks the importance of CM's roles in pre-design phase. In this study, CM's roles of pre-construction phase (pre-bidding, bidding, detail design, contracting) in construction turn-key projects were identified and complementary policy for institution was suggested. We further look into dividing the roles of the CM at turn-key project Into professional role and emotional role. Also, we speculate problems of the existing experience in turn-key projects and suggest a rough methodology on how these concepts can be adjusted for improve the turn-key method.

  • PDF

Identifying the perception on the introducing of Construction Management(CM) in the civil infrastructure project delivery system (사회간접자본 프로젝트의 CM제도 활성화방안에 대한 인식분석 연구)

  • Jang, Won-Suk;Lee, Sang-Uk;Lee, Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.91-100
    • /
    • 2013
  • Current environment in civil and construction industry has changed to actively adopt construction management (CM) in various areas. While it is found that exemplary CM projects have been carried out in many civil engineering sectors, concrete system framework has not been suggested due to ambiguous boundary between CM and supervision system, unclear perception of CM's role, and inexperienced organization and regime. This paper investigated the challenges faced in civil and construction industry, and analyzed the strategy that could improve the current immature CM system by conducting questionnaire survey from experts in various construction sectors. The results could provide valuable information that can involve diverse opinions and view points in project participants.

Evaluation of Capability for Practicing CM at Risk in Korea (국내 시공책임형 건설사업관리 수행을 위한 기업 역량 평가)

  • Ryu, HanGuk;Lee, Sangwon;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.79-87
    • /
    • 2020
  • The Korean domestic construction management at risk (CMAR) market is in the process of completing the pilot project execution under the leadership of the Ministry of Land, Infrastructure and Transport as of December 2019. The government starts practicing CMAR an alternative delivery method widely in order to diversify delivery methods and enhance construction technology. The CMAR market is thus expected to grow. This study was conducted to improve CMAR firms' capability by developing self-assessment tools for them to evaluate current capability more effectively. As a result of defining standard core capability and additional elements categorized by project execution phase and management area, and performing evaluation from the CMAR project participants, it was found that the general project management capability in the pre-design and procurement phase and quality management area was lower compared to the construction phase and other areas. In addition, the capability of cost management area was lower in spite of its high importance. Communication and coordination, process optimization, and target values achievement were at the initial level of capability and continuous improvement was required.