• Title/Summary/Keyword: CM 수행능력 향상 모델

Search Result 2, Processing Time 0.019 seconds

The Basis research Developing Assessment tool for Construction Management through Check List of Critical Success Factor (CM의 핵심석공요인 체크리스트 개발을 통한 CM적용효과 평가기법 개발 기초연구)

  • Lee Tai Sik;Choi Jae-Ho;Kim Young-Hyun;Park Jang-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.337-340
    • /
    • 2003
  • Currently the number of project ordered as Construction Management is increasing. In advanced country, critical success factor of construction industry and case study is used for increasing productivity of construction project. This study presents the check list of critical success factor and analyzescase study of Construction management project in order to apply Construction Management Project in domestic industry.

  • PDF

Development of BIM Utilization Level Evaluation Model in Construction Management Company (건설사업관리기업의 BIM 활용수준 평가 모형 개발)

  • Jeong, Seo-Hee;Kim, Gwang-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.4
    • /
    • pp.24-33
    • /
    • 2024
  • Recently, as smart construction has become more active, construction companys are evaluating their smart construction capabilities in order to transform into smart construction companies. However, the revitalization of smart construction doesn't only apply to construction companies, the level of utilization of all participants, including owners, designers, construction project managers, and construction company, must be improved. Therefore, this study aims to present a model that evaluate the building information modeling (BIM) utilization level for measuring the BIM utilization level of construction management companies in executing construction project management. In this study, an AHP questionnaire survey targeting BIM practitioners to calculate the weight of each BIM utilization item and score it to construct evaluation model and evaluate it by applying it to construction management companies are conducted. As a result of the evaluation using model, there were differences between companies in the number of BIM users, and in the qualitative evaluation, it is mainly used for interference review, constructability review, and design change management. Therefore, in order to revitalize BIM, it is believed that it is necessary to strengthen BIM utilization ability through separate training for construction manager (CMr) and to present clear utilization standards and scope of work for BIM utilization in performing construction management tasks. Consequently, evaluating more construction management companies using the model presented in this study will result in the transition of CM companies to smart construction and revitalization of BIM adoption.