• Title/Summary/Keyword: Business Process Monitoring

Search Result 195, Processing Time 0.028 seconds

A Study on the Web Based Monitoring System for the BIPV (BIPV에 적용된 웹기반 모니터링 시스템에 대한 연구)

  • Kang Byung-Bog;Yoon Jeong-Phil;Park Se-Jun;Yoon Pil-Hyun;Lim Jung-Yeol;Cha In-Su
    • Proceedings of the KIPE Conference
    • /
    • 2003.11a
    • /
    • pp.252-255
    • /
    • 2003
  • Digital environment that is represented to internet is displacing business way of industry and business achievement way with the fast speed being giving great change on life whole, improve existence business process utilizing internet and Web connection technology, information superhighway to tradition industrialist manufacture and e-transformation's propulsion that wish to maximize productivity and administration efficiency is spread vigorously. In this paper, we wish to accomplish generation equipment's heighten stability and believability through remote monitoring and control of BIPV system. This paper describes the design of the monitoring system for sensing the monitoring data and indirect controlling of the BIPV system. Most of the conventional monitoring system depend on the special hardware and software. Basic design goal of monitoring system is to provide the convenience for the user and the portability for the system. In order for the system to fulfill its requirements, it was designed using Labview GUI facility based on the Windows 2000 environment of IBM PC compatible and Add-on card based on the TCP/IP protocol. Advantage of the monitoring system are a personnel expenses curtailment effect, free of the place restriction and unmanned system of the generation plants, etc.

  • PDF

Collaboration Management Architecture of construction process for Decision Support based on PLM (Project Life-cycle Management) (PLM 기반의 건설프로세스 의사결정을 위한 협업관리체계 개발)

  • Lim, Hyoung-Chul;Choi, Cheol-Ho;Chin, Sang-Yoon;Kim, Jae-Jun;Lee, Kwang-Myung;Yoon, Su-Won
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.165-169
    • /
    • 2007
  • In order to develop VirtuAlmighty system, CPDM (construction project data management) and CPLM (construction project lifecycle management) model must be settled beforehand. Because most of information systems based on 3D-Design have its own database and business process. So, our team will develop collaboration management architecture of construction process for Decision Support based on PLM (Project Life-cycle Management). This architecture with business processes and Database can be used in process develop, process monitoring with many stakeholders of project, process change management, and so on.

  • PDF

Research on Using Six Sigma Tool to Reduce the Core Process Time

  • Chung, Yi-Chan;Yen, Tieh-Min;Hsu, Yau-Wen;Tsai, Chih-Hung;Chen, Ching-Piao
    • International Journal of Quality Innovation
    • /
    • v.9 no.1
    • /
    • pp.94-102
    • /
    • 2008
  • When facing the global severe competition, the enterprises all try their best to upgrade the quality, reduce the costs to reach the goal of customer satisfaction. Motorola was the earliest firm creating the term Six Sigma (6 ${\sigma}$); GE was the enterprise successfully fulfilling Six Sigma. The success of these two firms revealed the prominent effects and became the world-class model enterprises. The main purpose of promoting Six Sigma activity was to reduce the possible defects in the business process to the least through designing and monitoring business process in order to reach the goals such as the best quality and efficiency, the lowest costs, the shortest circular process time, maximum profits and customer satisfaction. This research used the Six Sigma technique to improve the business process of ceramics manufacturing plant and find out the major factors of slower core task time by the analytical process of Process Mapping, Pareto Chart, Simu18 simulation software and figures and proposed the improvement measures. Through the confirmation of the case companies, it successfully reduced the core process time and the organizational costs and increased the capacity.

Correlationship with Selecting Business Process and Strategy for BPM of Construction Company (건설기업의 BPM도입 대상 업무선정과 기업전략의 상관성)

  • Cho, Hang-Min;Song, Young-Woong;Lim, Hyung-Chul;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.28-39
    • /
    • 2009
  • Recently, it has been an issue on BPM(Business Process Management, below BPM), which is a sort of business management methods that secures agility and flexibility through sustainable improving and monitoring in a rapid-changing environment. To introduce BPM to construction company we need to set up a procedure for objective, define criteria according to the business structure defined by BPA(Business Process Architecture, below BPA) and analyze works and then select targets. Those BPM target works need to have a close relationship with corporate strategy and to support realizing corporate value. Therefore, this paper will study BPM Target works of construction companies for an effective introduction BPM through questioning from working-level staff. In addition, it will analyze their types and corporate core strategy and BPM target works, then study the main strategy according to BPM target types. And also, this study is expected to help construction companies to choose the business for BPM adoption through analyzing current situation and strategy for business selection when adopting BPM.

Case Prediction in BPM Systems : A Research Challenge

  • Reijers, Hajo A.
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.33 no.1
    • /
    • pp.1-10
    • /
    • 2007
  • The capabilities ofBusiness Process Management Systems (BPMS's) are continuously extended to increase theeffectiveness of the management and enactment of business processes. This paper identifies the challenge ofcase prediction, which for a specific case under the control of a BPMS deals with the estimation of the remaining time until it is completed. An accurate case prediction facility is a valuable tool for the operationalcontrol of business processes, as it enables the pre-active monitoring of time violations. Little research has beencarried out in this area and few commercial tools support case prediction. This paper lists the requirements onsuch a facility and sketches sonae directions to reach a solution. To illustrate the depth of the problem, a smallaspect of the problem is treated in more detail. It involves the complex relations between tasks and resources inbusiness processes, which makes an exact analytical approach mfeasible.

Fielding a Structural Health Monitoring System on Legacy Military Aircraft: a Business Perspective

  • Bos, Marcel J.
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.35 no.6
    • /
    • pp.421-428
    • /
    • 2015
  • An important trend in the sustainment of military aircraft is the transition from preventative maintenance to condition based maintenance (CBM). For CBM, it is essential that the actual system condition can be measured and the measured condition can be reliably extrapolated to a convenient moment in the future in order to facilitate the planning process while maintaining flight safety. Much research effort is currently being made for the development of technologies that enable CBM, including structural health monitoring (SHM) systems. Great progress has already been made in sensors, sensor networks, data acquisition, models and algorithms, data fusion/mining techniques, etc. However, the transition of these technologies into service is very slow. This is because business cases are difficult to define and the certification of the SHM systems is very challenging. This paper describes a possibility for fielding a SHM system on legacy military aircraft with a minimum amount of certification issues and with a good prospect of a positive return on investment. For appropriate areas in the airframe the application of SHM will reconcile the fail-safety and slow crack growth damage tolerance approaches that can be used for safeguarding the continuing airworthiness of these areas, combining the benefits of both approaches and eliminating the drawbacks.

Integration of Six Sigma and BPM for Continuous Process Improvement (지속적 프로세스 개선을 위한 6시그마와 BPM 통합 모형)

  • Yoon, Ji Hyun;Jung, Jae-Yoon
    • The Journal of Bigdata
    • /
    • v.2 no.1
    • /
    • pp.5-15
    • /
    • 2017
  • Six Sigma has been adopted for the last two decades in many industries of manufacturing and service business to implement processs improvement. The methodology has difficulties in discovering target projects in the Define step and in controlling continuous measure and control in the Control step. To address the problem, more advanced system is required to support continuous control and management, and business process management (BPM) can be an effective solution for this problem. In this research, we introduce integrated models of Six Sigma and BPM for the purpose of realizing continuous process improvement, and explain the procedure of analyzing, improving, and monitoring the processes based on the data which has been accumulated in business process execution. It is expected that this integrated approach can maximize business performance by improving and managing business continuously on the integrated platform of two business innovation strategies, Six Sigma and BPM.

  • PDF

Monitoring and Tracking Model of Logistics Based on ICT network

  • Cho, Sokpal;Chung, Heechang
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2016.10a
    • /
    • pp.489-492
    • /
    • 2016
  • Transportation in the logistics, many business organizations are engaged in monitoring and tracking the vehicles in order to improve logistics services, reduce expenses and secure security in cargo transportation. It is saving time and money by tracking and monitoring vehicles which transport cargo in supply chain of logistics. Therefore the main issue of delivery flow is to improve services, and ensure the safety in transportation system. This article suggests the tracking and monitoring model to keep safety transports on ICT network. It focuses on precise delivery control by monitoring and tracking vehicles to save time and costs. The status of product movement is analyzed for proper decision making. The vehicle embedded with RFID is automatically tracked in the movement process by tracking and monitoring model. The main role keeps safety tracking to reduce costs and to deliver products at proper time and location.

  • PDF

BPM-based Six Sigma : Concepts and Procedural Model (BPM 기반의 6 시그마 : 개념 및 절차 모델)

  • Kim, Kwang-Jae;Yook, Jin-Bum;Kim, Kwang-Soo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.32 no.4
    • /
    • pp.314-322
    • /
    • 2006
  • Despite its brilliant success, Six Sigma has suffered from two shortcomings, namely, the lack of a systematic method to identify the right projects in the "Define" stage and to sustain the improvement in the "Control" stage. The integration of Six Sigma and Business Process Management(BPM) seems to be a promising way to overcome the shortcomings of Six Sigma. This paper first reviews the existing efforts on this issue, and then proposes a framework for an effective integration of Six Sigma and BPM. The framework consists of five phases - DEFINE, EXECUTE, MONITOR, ANALYZE, and IMPROVE(DEMAI). A detailed description on the procedural model is also presented.

Development of OPC UA based Smart Factory Digital Twin Testbed System (OPC UA 기반 스마트팩토리 디지털 트윈 테스트베드 시스템 개발)

  • Kim, Jaesung;Jeong, Seok Chan;Seo, Dongwoo;Kim, Daegi
    • Journal of Korea Multimedia Society
    • /
    • v.25 no.8
    • /
    • pp.1085-1096
    • /
    • 2022
  • The manufacturing industry is continuously pursuing advanced technology and smartization as it converges with innovative technology. Improvement of manufacturing productivity is achieved by monitoring, analyzing, and controlling the facilities and processes of the manufacturing site in real time through a network. In this paper, we proposed a new OPC-UA based digital twin model for smart factory facilities. A testbed system for USB flash drive packaging facility was implemented based on the proposed digital twin model and OPC-UA data communication scheme. Through OPC-UA based digital twin model, equipment and process status information is transmitted and received from PLC to monitoring and control 3D digital models and physical models in real time. The usefulness of the developed digital twin testbed system was evaluated through usability test.