• Title/Summary/Keyword: Busan No.1 fairway

Search Result 2, Processing Time 0.015 seconds

A Study on the Traffic Improvement at an Approach Area of Busan Harbor (부산항 제1항로 진입 해역의 통항 개선에 관한 연구)

  • Lee, Yun-Sok;Jung, Min;Song, Chae-Uk;Park, Jin-Soo;Park, Young-Soo;Cho, Ik-Soon
    • Journal of Navigation and Port Research
    • /
    • v.31 no.5 s.121
    • /
    • pp.345-351
    • /
    • 2007
  • In approaching sea area of Busan harbour, there are many traffic vessels and external forces such as strong seasonal wind and lateral flow are existed. Since the area caused the risk of navigation and ship operators feel hard to enter/depart on Busan port, we carried our the evaluation of traffic risk and propriety at Busan no.1 fairway. In order to assess the safety in the fairway, we analyzed ship's traffic stream based on the marine traffic survey and evaluated the traffic safety of present Traffic Separation Schemes(TSS) and suggest TSS in the research using full mission ship-handling simulators. As a result, the suggested TSS has an effect on improving the traffic safety. In addition, this paper was to suggest the dredging area of depth of water, the passage of towing vessels and control of warships for preventing of maritime accidents in the Busan no.1 fairway.

Improvement Plan on Operation of O-2 Anchorage at the Busan North Port (부산 북항 O-2 정박지의 운영개선 방안)

  • Song, Gye-Eui
    • Journal of Korea Port Economic Association
    • /
    • v.25 no.1
    • /
    • pp.29-46
    • /
    • 2009
  • According to construction work of No. 2 Lotte world, the alternative pier is under construction in Dongsam-dong Yeongdo-gu to accommodate small boats. As a result of that, in order to procure route of small boats passage,0-2 Anchorage used to bunkering or waiting for berth should be reduced, 220m. It is expected that the risk of passage and congestion around the anchorage could be increased because of the traffic of small boat using the alternative pier. Therefore, it is needed to enlarge the O-2 Anchorage 250m toward to inner breakwater. According to result of analyzing traffic circumstance and weather condition of anchorage near the Busan inner fairway, and to procure of alternative anchorage in order to resolve the problem caused by reduction of O-2 Anchorage, no problems incurred. In conclusion, reduction & enlargement of area of new O-2 Anchorage is expected to resolving of congestion & reducing of risk of traffic at O-2 Anchorage, and to operating O-2 Anchorage, efficiently.

  • PDF