• Title/Summary/Keyword: Building structure

Search Result 4,844, Processing Time 0.029 seconds

Comparison of Hygrothermal Performance between Wood and Concrete Wall Structures using Simulation Program

  • Yu, Seulgi;Chang, Seong Jin;Kang, Yujin;Kim, Sumin
    • Journal of the Korean Wood Science and Technology
    • /
    • v.44 no.2
    • /
    • pp.283-293
    • /
    • 2016
  • Owing to an increase in the air tightness of recent buildings, the natural ventilation rate was significantly lowered and the removal of accumulated moisture became difficult in these buildings. The hygrothermal performance of these buildings should be carefully considered to provide comfortable indoor environment by removing the moisture condensation risk and the mold growth potential. In this study, hygrothermal performance of two selected wall structures was investigated based on WUFI simulation program. The results displayed that the indoor temperature had impact on the moisture accumulation in the insulation layer for both modeled walls, showing that lower indoor temperature resulted in higher moisture accumulation, especially in the wood frame structure. Also, the yearly moisture accumulation profile exhibited a downward shift throughout the year by adding a vapour retarder with a lower sd-value. In addition, both of the two walls have condensation risk in winter, due to low temperature level. The wood frame structure has a bigger fluctuation and higher condensation risk than the concrete structure.

A Study on the Unification of the Grounding System of SeoulMetro (서울메트로 접지설비 표준화 방안 연구)

  • Kim, Gyun-Sig;Park, Han-Yeong;Back, Yu-Ho
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1027-1036
    • /
    • 2007
  • Since the opening of the Seoul Metro in 1974, the electric railway passengers have been increased rapidly and as the advanced equipments(OC,PSD) were introduced, additional power facilities were built in a limited area for the comfortable transportation environment. Present grounding system were built according to old Electric equipment standards and all the electric signal, communication and electronic equipments were built only for the purposes of protecting building structure, people and electronic equipments. Grounding system which was additionally built in the limited area caused problems with the building structure and it caused secondary damages when earth fault happens. One of the problems is grounding system of the building structure; grounding system does not work properly since grounding equipments are not separated from each other. So, existing grounding system needs to be improved and unified grounding system in the building should be established. The purposed of this study is to analyze all the grounding systems that had been built in different year and to establish unified grounding system of Seoul Metro.

  • PDF

Improvement method of process management on new han-ok style public building project (신한옥형 공공건축물 실증구축사업의 작업진도 분석 및 공정개선 방안 - 신한옥형 공공건축물 실증구축 현장 3개를 중심으로 -)

  • Seo, Jung-Seung;Kim, Young-Hoon;Kwak, Dong-Yeob
    • KIEAE Journal
    • /
    • v.17 no.3
    • /
    • pp.133-140
    • /
    • 2017
  • Purpose: The construction of New Han-ok style public buildings is a construction that can not be seen in traditional Han-ok, and it is a construction that combines traditional wooden structure, RC structure, and steel structure. Therefore, construction different from general construction is complicated and complex. It is necessary to accurately understand the construction method of each field rather than the general construction management method and study the method suitable for New Han-ok style public buildings. Also, since the New Han-ok style public building business is the first business to be introduced in Korea, new process management is needed rather than general process management. Method: The research method is as follows. Analyze process management through theoretical considerations and analyze the differences from general construction projects. Next, we want to identify the characteristics and problems of the process control method applied to real cases. Finally, the results of this analysis suggest ways to improve process management. Result: Therefore, it is necessary to establish a precise plan from the basic design to the construction of the public building construction management. In addition, careful planning should be made so that the supply and demand of materials and the supply and demand of personnel can be achieved smoothly.

Integration of Ontology Model and Product Structure for the Requirement Management of Building Specification (건조사양서 요구사항의 추적을 위한 온톨로지 모델과 제품구조 통합 기초 연구)

  • Kim, Seung-Hyun;Lee, Jang-Hyun;Han, Eun-Jung
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.48 no.3
    • /
    • pp.207-214
    • /
    • 2011
  • Ship design requirements described in the building specification should be reflected in the design process. This paper identifies the configuration of requirements mentioned in the building specification using Ontology Representation Language (OWL). Ontology-based semantic search system specifies the requirement items. Through this extraction, building specifications mentioned for each entry are configured to the tree. Tracking requirements for ship design and a set of procedures to instruct is also used for the V model of systems engineering. The semantic search engine of robot agent and ontology can search the requirements specification document and extract the design information. Thereafter, design requirements for the tracking model that proposes the relationship between the associated BOM(bill of material) and product structure.

A Study of Identification Test Method for Fire Resistive Paint in Near-Infrared Spectroscopy (적외선분광법을 이용한 내화피복재 일치성 평가방법 연구)

  • Cho, Nam-Wook;Jeon, Soo-Min;Kang, Sung-Hun;In, Ki-Ho;Rie, Dong-Ho
    • Fire Science and Engineering
    • /
    • v.24 no.3
    • /
    • pp.20-24
    • /
    • 2010
  • When the fire occurred in building, the fire-resistance-structure has to be constructed to prevent collapse of building and to have a time for evacuation of peoples. because of the features of the fireresistance test is similar with real scale, there is no way to confirm quality of fire-resistive-structure in building construction site. Therefore the purpose of this study, a study by spectroscopic analysis using near-infrared spectroscopy (NIR), is to suggest of useful and scientific testing-methods in building construction site by identification-analysis-study for fire resistive paint.

Optimal Design of Tall Residential Building with RC Shear Wall and with Rectangular Layout

  • Jinjie, Men;Qingxuan, Shi;Zhijian, He
    • International Journal of High-Rise Buildings
    • /
    • v.3 no.4
    • /
    • pp.285-296
    • /
    • 2014
  • The objective of optimization is to present a design process that minimizes the total material consumption while satisfying current codes and specifications. In the research an optimization formulation for RC shear wall structures is proposed. And based on conceptual design methodology, an optimization process is investigated. Then optimal design techniques and specific explanations are introduced for residential buildings with shear wall structure, especially for that with a rectangular layout. An example of 30-story building is presented to illustrate the effectiveness of the proposed optimal design process. Furthermore, the influence of aspect ratio on the concrete consumption and the steel consumption of the superstructure are analyzed for this typical RC shear wall structure; and their relations are obtained by regressive analysis. Finally, the optimal material consumption is suggested for the residential building with RC shear wall structure and with rectangular layout. The relation and the data suggested can be used for guiding the design of similar RC shear wall structures.

The Architectural Structure of Seonjeong-jeon in Changdeok Palace as a Ceremonial Hall (창덕궁 선정전의 의례 공간적 건축 구조)

  • Lee, Jong-Seo
    • Journal of architectural history
    • /
    • v.29 no.2
    • /
    • pp.39-52
    • /
    • 2020
  • Seonjeong-jeon, the semi-great hall in Changdeok Palace, was constructed in a highly formal and conservative style and accommodated official ceremonies. However, the contemporary modification of the building has distorted or eliminated features including the two side doors on the front, the floor coverings, and the throne base (Jwa-tap) that consisted the most significant part of the throne. Seonjeong-jeon originally had three doors that stood between each pair of columns on the front side, respectively. The courtiers accessed the building through the side doors, while the central door was exclusively designated for the king. However, the renovation in 1999 ignored the political context of the architectural form of the building and changed the side doors into windows, damaging the traditional structure inherited from the early Joseon Dynasty. Although the building currently has traditional wooden floor structure (Woomul-maru), it was originally covered with square brick tiles (Bang-jeon) before the Japanese occupation, following the customs of early Joseon Dynasty. The throne was placed to the north of the central door and consisted of the throne base and a decorative roof (Dang-ga). A canvas (Jang-ja), which featured the royal symbolic painting of Sun, Moon, and Five Peaks, was also installed between the two columns that connected the base and the roof. Nevertheless, only the columns and the blank canvas remain nowadays after the removal of the base.

Effect of poorly-compacted backfill around embedded foundations on building seismic response

  • Kim, Yong-Seok
    • Earthquakes and Structures
    • /
    • v.3 no.3_4
    • /
    • pp.549-561
    • /
    • 2012
  • Many building foundations are embedded, however it is not easy to compact the backfill around the foundation especially for the deeply embedded ones. The soil condition around the embedded foundation may affect the seismic response of a building due to the weak contact between the soil and the foundation. In this paper, the response accelerations in the short-period range and at the period of 1 second (in the long-period range) for a seismic design spectrum specified in the IBC design code were compared considering perfect and poor backfills to investigate the effect of backfill compaction around the embedded foundation. An in-house finite-element software (P3DASS) which has the capability of horizontal pseudo-3D seismic analysis with linear soil layers was used to perform the seismic analyses of the structure-soil system with an embedded foundation. Seismic analyses were carried out with 7 bedrock earthquake records provided by the Pacific Earthquake Engineering Research Center (PEER), scaling the peak ground accelerations to 0.1 g. The results indicate that the poor backfill is not detrimental to the seismic response of a building, if the foundation is not embedded deeply in the soft soil. However, it is necessary to perform the seismic analysis for the structure-soil system embedded deeply in the soft soil to check the seismic resonance due to the soft soil layer beneath the foundation, and to compact the backfill as well as possible.

Organizational Transformation Strategies for Adopting Building Information Modeling in the Engineering-Construction Industry

  • Yong Han Ahn;Young Hoon Kwak;Sung Jun Suk
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.94-102
    • /
    • 2013
  • The architecture, engineering and construction (AEC) industry is beginning to utilize Building Information Modeling (BIM), benefiting from the resulting improved visualization and productivity, better coordination of construction drawings, building documents that contain embedded links to virtual information, faster delivery, and lower costs. However, construction firms often face challenges when reorganizing their company structure to take full advantage of these benefits. This paper proposes an organizational structure that will enable engineering-construction firms to successfully adopt and implement BIM for major construction projects. A case study research method is utilized based on in-depth interviews with four BIM directors and vice presidents charged with BIM adoption, implementation and education. Organizational transformation challenges and recommendations are discussed in detail for those considering implementing BIM in the engineering-construction industry. Topics such as organizational changes in the firm, costs and benefits of BIM implementation, strategies of BIM implementation (execution) plan, BIM education, risks and opportunities associated with BIM, BIM software, contract methods, human resource management and new hires, and the future implementation and direction of BIM are discussed in detail.

  • PDF

Fine Dust Adsorption of Cement Matrix Using Sepiolite (세피올라이트를 활용한 시멘트 경화체의 미세먼지 흡착 특성 )

  • Jeon, Eun-Yeong;Lee, Sang-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.71-72
    • /
    • 2023
  • As industrialization and urbanization accelerate, environmental issues have moved from local concerns to global issues. Among them, air pollution is the most important issue. Modern people spend more than 88% of their day indoors, but the concentration of fine dust and pollutants flowing indoors is increasing. The indoor environment has its own complexity, and various substances used indoors, such as building materials, furniture, electronics, and cleaning agents, emit chemical substances and cause various diseases. Therefore, when selecting building materials and interior finishing materials, the pollutant emission and adsorption capacity must be greatly considered. These considerations will ensure the construction of a sustainable future environment and a healthy life within that environment. Therefore, in order to reduce the generation of indoor air pollutants, this study aims to examine the fine dust adsorption properties of cement hardening materials using sepiolite, which has a porous structure and high absorption power among clay minerals. As a result of the experiment, it was found that the concentration of fine dust decreased as the addition rate of sepiolite increased. It is believed that the fine dust concentration was reduced due to the high porosity due to the microfibrous structure and large specific surface area of sepiolite, which has a porous structure among clay minerals. It is believed that these experimental results can be used as basic research for future use of sepiolite as a construction material.

  • PDF