• Title/Summary/Keyword: Building permit

Search Result 67, Processing Time 0.033 seconds

A Proposal for Partial Automation Preparation System of BIM-based Energy Conservation Plan - Case Study on Automation Process Using BIM Software and Excel VBA - (BIM기반 에너지절약계획서 건축부문 부분자동화 작성 시스템 제안 - BIM 소프트웨어와 EXCEL VBA를 이용한 자동화과정을 중심으로 -)

  • Ryu, Jea-Ho;Hwang, Jong-Min;Kim, Sol-Yee;Seo, Hwa-Yeong;Lee, Ji-Hyun
    • Journal of KIBIM
    • /
    • v.12 no.2
    • /
    • pp.49-59
    • /
    • 2022
  • The main idea of this study is to propose a BIM-based automation system drawing up a report of energy conservation plan in the architecture division. In order to obtain a building permit, an energy conservation plan must be prepared for buildings with a total floor area of 500m2 or more under the current law. Currently, it is adopted as a general method to complete a report by obtaining data and drawings necessary for an energy conservation plan through manual work and input them directly into the verification system. This method takes a lot of effort and time in the design phase which ultimately increases the initial cost of the business, including the services of companies specialized in the environmental field. However, in preparation for mandatory BIM work process in the future, it is necessary to introduce BIM-based automatic creation system that has an advantage for shortening the whole process to enable rapid permission of energy-saving designs for buildings. There may be many methods of automation, but this study introduces how to build an application using Dynamo of Revit, in terms of utilizing BIM, and write an energy conservation plan by automatic completion of report through Dynamo and Excel's VBA algorithm, which can save time and cost in preparing the report of energy conservation plan compared with the manual process. Also we have insisted that the digital transformation of architectural process is a necessary for an efficient use of our automation system in the current energy conservation plan workflow.

Outline History of Corporation Yudohoi(儒道會) via 『Cheongeumrok(晴陰錄)』 by Hong Chan-Yu: "Volume of Materials" (『청음록(晴陰錄)』으로 본 (사(社))유도회(儒道會) 약사(略史))

  • Chaung, hoo soo
    • (The)Study of the Eastern Classic
    • /
    • no.55
    • /
    • pp.265-291
    • /
    • 2014
  • Cheongeumrok is the journal of Gwonwoo(卷宇) Hong Chan-yu(1915-2005) during the period of January 9, 1969~January 14, 1982. He was personally involved in the foundation of a corporation called Yudohoi and also all of its operation, which makes him the most knowledgeable person about its history. His Cheongeumrok thus seems worthy enough as a proper material to arrange its history. Cheongeumrok consists of total 19 books, amounting to approximately 3,300 pieces of squared manuscript paper containing 200 letters per piece. He wrote it in Chinese and sometimes followed the Hangul-style word order while writing in Chinese. Many parts of the manuscript were written in a cursive hand with many Chinese poems embedded throughout it. The manuscript offers major information related to the corporation Yudohoi extracted from his journal. 1. There was a meeting of promoters to commemorate the foundation of the corporation in November, 1968, and it was in January, 1969 that it was established after getting a permit from the Ministry of Culture and Communication in January, 1969(Permit No. of Ministry of Culture and Communication: Da(다)-2-3(Jongmu(宗務)1732.5)). 2. Its office was moved from the original location of the 3rd floor of Wonnam Building, 133-1 Wonnam-dong, Jongro-gu, Seoul(currently Daekhak Pharmacy in front of Seoul National University Hospital) to Room 388 of Gwangjang Company, 4 Yeji-dong, Jongro-gu(office of Heungsan Social Gathering) and to second floor of KyungBo building, 21 Kyansu-dong, and to 3rd floor of Geongguk Building in Gyeongwoon-dong. 3. Its operational costs were covered by the supports of Seong Sang-yeong, the eldest son of Seong Jong-ho, the chairman of the board, later Kim Won-tae and Gwon Tae-hun, next chairmen of the board, and Hong Chan-yun, a director, since 1979. 4. His Confucian activities include participating in Seonggyungwan Seokjeonje (成均館 釋奠), joining in the erection of the Parijangseo(巴里長書) Monument and the publication of its commemorative poetry book, compiling the biographies(not completed) of Confucian patriotic martyrs for independence, and participating in the establishment of family rituals and regulations as a practice member. 5. His Yudohoi had a dispute with Seonggyungwan and lost a suit at the High Court in July, 1975 and Supreme Court in February, 1976. 6. There were discussions about its unification with Seonggyungwan Yudohoi, but there was hardly any progress. 7. Yudohoi started to provide full-scale courses on Confucian and Chinese classics under the leadership of Director Hong Chan-yu in 1979, and they have continued on today. Its courses for scholarship students including those for common citizens boast a history of 29 years and 220 graduates.

A Study on Legal and Regulatory Improvement Direction of Aeronautical Obstacle Management System for Aviation Safety (항공안전을 위한 장애물 제한표면 관리시스템의 법·제도적 개선방향에 관한 소고)

  • Park, Dam-Yong
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.31 no.2
    • /
    • pp.145-176
    • /
    • 2016
  • Aviation safety can be secured through regulations and policies of various areas and thorough execution of them on the field. Recently, for aviation safety management Korea is making efforts to prevent aviation accidents by taking various measures: such as selecting and promoting major strategic goals for each sector; establishing National Aviation Safety Program, including the Second Basic Plan for Aviation Policy; and improving aviation related legislations. Obstacle limitation surface is to be established and publicly notified to ensure safe take-off and landing as well as aviation safety during the circling of aircraft around airports. This study intends to review current aviation obstacle management system which was designed to make sure that buildings and structures do not exceed the height of obstacle limitation surface and identify its operating problems based on my field experience. Also, in this study, I would like to propose ways to improve the system in legal and regulatory aspects. Nowadays, due to the request of residents in the vicinity of airports, discussions and studies on aviational review are being actively carried out. Also, related ordinance and specific procedures will be established soon. However, in addition to this, I would like to propose the ways to improve shortcomings of current system caused by the lack of regulations and legislations for obstacle management. In order to execute obstacle limitation surface regulation, there has to be limits on constructing new buildings, causing real restriction for the residents living in the vicinity of airports on exercising their property rights. In this sense, it is regarded as a sensitive issue since a number of related civil complaints are filed and swift but accurate decision making is required. According to Aviation Act, currently airport operators are handling this task under the cooperation with local governments. Thus, administrative activities of local governments that have the authority to give permits for installation of buildings and structures are critically important. The law requires to carry out precise surveying of vast area and to report the outcome to the government every five years. However, there can be many problems, such as changes in the number of obstacles due to the error in the survey, or failure to apply for consultation with local governments on the exercise of construction permission. However, there is neither standards for allowable errors, preventive measures, nor penalty for the violation of appropriate procedures. As such, only follow-up measures can be taken. Nevertheless, once construction of a building is completed violating the obstacle limitation surface, practically it is difficult to take any measures, including the elimination of the building, because the owner of the building would have been following legal process for the construction by getting permit from the government. In order to address this problem, I believe penalty provision for the violation of Aviation Act needs to be added. Also, it is required to apply the same standards of allowable error stipulated in Building Act to precise surveying in the aviation field. Hence, I would like to propose the ways to improve current system in an effective manner.

Application of Seismic Isolation and Vibration Control in Korea (우리나라의 면진 및 진동제어)

  • Lee, Dong-Guen;Kim, Tae-Ho
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.10 no.6 s.52
    • /
    • pp.67-77
    • /
    • 2006
  • Seismic activity of Korea is not so high as that of Japan or California and most of the structures were designed without considering the influence of earthquakes until the first seismic design code was enforced in 1988. Therefore, it was very hard to find seismically isolated structures in Korea until 1980's. Korean engineers assumed that the seismic isolation or vibration control would be useful only in a high seismicity region while such technologies can be quite useful in a low seismicity region for the efficient reduction of earthquake damages. Recently, Korean engineers began to have interest in the seismic isolation or vibration control and applied it to some important structures such as LNG storage tanks, many bridges and several buildings. However, design codes are not defining such useful advanced technologies for the design of building structures and several projects employing seismic isolation or vibration control in the design of structures had difficulties in obtaining construction permit from the local government. Therefore, it is an urgent requirement to introduce these advanced technologies in the seismic design code.

A Study of Collaboration between GIS and Census Data for Urban Analysis and Location Analysis (도시현황분석과 시설물 입지분석의 과학화를 위한 센서스와 GIS의 연계 활용방안 연구)

  • Koo, Chamun
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.3 no.3
    • /
    • pp.31-44
    • /
    • 2000
  • The purpose of this study is to show how could GIS along with digital maps and census data be used for scientific urban analysis and location analysis for a proposed project. Results are summarized as follows. First. after digital maps being completed, the census tract system being adopted, and major urban data being inputted in the computer file, GIS could be used intensively for various reliable urban analysis. With graphic statistical, and overlay functions of GIS, various physical and socio-economic characteristics of urban areas could be presented for analysis in the form of thematic and datapoint maps on the computer screen. Second, the locational analysis for a proposed project is a major part in the building permit review process, which tends to become disputable and time consuming as society become pluralized. Along with various GIS functions scientific decision-making methods could be developed, and the methods could play an important role for faster and scientific location analysis. As such, GIS would play an important role for faster and reliable urban analysis and location analysis and these functions finally would play important roles to improve public services and administration of local governments.

  • PDF

Analysis of the Restoration Actual Conditions on the Quarries (토석채취지의 복구 실태 분석)

  • Park, Jae-Hyeon;Park, Chong-Min;Lee, Joon-Woo
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.13 no.3
    • /
    • pp.128-142
    • /
    • 2010
  • This study examined the actual conditions of quarries. aiming to offer preliminary data to help with restoration efforts of quarries after extracting rock material. The results are as follows. As for the current state of business, a classification of all sites surveyed showed the ratio of ceased operations: ongoing operations: quarries under restoration to be 58:5:37. Classified by the permit area, the ratio of the number of quarries with areas less than $20,000m^2$ (2ha) : between $20,000m^2$ (2ha) and $50,000m^2$ (5ha) : $50,000m^2$ (5ha) or more was 15:60:25. The classification by use of the rocks showed the ratio of construction aggregate (such as civil construction material) : building material : craft material to be 60:28:12. The ratio of quarrying methods of bench cut : slope quarry : vertical quarry wall is 40:18:42. It is indicated that 85% of all quarries surveyed are difficult to reclaim while 15% seem to be easier to restore. Among all surveyed, 34 sites were considered to be extremely difficult to restore. 17 of the 34 sites (50%) were quarry walls almost vertical that have been neglected after extraction. 16 of them (47%) were underground quarries that have left quarry walls deep under the ground. For the remaining 1 site, there doesn't seem to be any need for reclamation as it became totally flat after the extraction.

A Study on the Applications of Shielding Theory (차폐이론의 적용에 관한 연구)

  • 양한모
    • Journal of Korean Society of Transportation
    • /
    • v.20 no.5
    • /
    • pp.55-66
    • /
    • 2002
  • In many countries the principle of shielding is employed to permit a more logical approach to restricting new construction and prescribing obstacle marking and lighting. It also reduces the number of cases of new construction requiring review by authorities. Shielding principles are employed when some object, an existing building or natural terrain, already penetrates above one of the obstacle limitation surfaces described in Annex 14. If it is considered that the nature of an object is such that its presence may be permanent, then additional objects within a specified area around it may be permitted to penetrate the surface without being considered as obstacle. The shielding effect of immovable obstacles laterally in final approach and missed approach areas is more uncertain. In certain circumstances, it nay be advantageous to preserve existing unobstructed cross section areas, particularly when the obstacle is close to the runway. This would guard against future changes in either approach or take-off climb area specifications or the adoption of a turned take-off procedure.

Case Study: Record Management & Maintenance System Implementation with Architectural Drawings on GIS Platform (GIS 플렛폼을 활용한 건축도면 및 자료 유지관리시스템 적용 사례연구 - 미국 버지니아주 리치몬드시청 건축도면 및 자료 유지관리시스템 사례연구 -)

  • Chong, K. Chul;Sho, Kwang-Ho
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.1
    • /
    • pp.163-172
    • /
    • 2020
  • This study is a case study for in-house developed Record Maintenance and Management (RMMS) which is a digital data storage/retrieval system in a GIS-enabled solution. RMMS is designed for reorganizing submitted architectural drawings associated with scanned drawings files & geodatabase, managing metadata/table and geometric features in ArcSDE/Enterprise geodatabase format. The birth of the RMMS was borne out of a necessity for a modernized approach in digital file basis to provide improved customer services for various architectural drawings and associated with geo-spatial and its attribute information. Through a case study for building permit & review practice implemented on an internet-based Electronic Architectural administration Information System (EAIS) at the local governments in Korea, this study is able to derive differences between GIS-enabled RMMS system implemented in the Richmond City and internet-based EAIS system implemented in the local government in Korea. In an effort to be the most effective, it presents meaningful ways of maximizing efficiency in record maintenance & management system derived from the case studies that looked into in ways of a method in RMMS' operation, implementation on GIS platform, mutual interface among various programs with various digital files and finally technical supports and system development /upgrade.

Strategies for Acceleration of Damaged Area Restoration Project in the Development Restriction Zone

  • Park, Seong Yong;Jung, Sung Ae;Lee, Sang Jo;Chung, Jae Woo
    • Journal of People, Plants, and Environment
    • /
    • v.22 no.6
    • /
    • pp.641-651
    • /
    • 2019
  • The purpose of this study is to derive institutional improvement methods for promoting the Damaged Area Restoration Project in greenbelts. The current status of greenbelts in Gyeonggi-do, where greenbelts are extensively distributed was analyzed, and the relevant laws and regulations were reviewed to suggest measures to promote the restoration project. The area of damaged areas within greenbelts in Gyeonggi-do was 6,121,024 m2, accounting for about 0.52% of the total area of greenbelts, and more than 80% was found to be located in Namyangju (55.49%), Hanam (16.48%), and Siheung (8.68%). Various measures to improve the policy were examined as follows: reducing the minimum size of the restoration project area; adjusting baseline of recognizing range of damaged areas; introducing the right of claim for land sale; allowing long-term unexecuted urban parks to be replaced as alternative sites for parks and green spaces; simplifying administrative procedures; and allowing public participation. All of them are expected to promote the restoration project within greenbelts. In results, when the minimum size of area for the restoration project was reduced from 10,000 m2 into 5,000 m2, 3,000 m2 and 2,000 m2, the ratio of the number of combinable lots to the total number of lots increased from 4.4% to 18.8%, 38.8%, and 55.9% respectively in Namyangju. Morever, when the recognizable ranges of the restoration project were extended to the structures obtaining building permit as of March 30, 2016 and obtaining use approvals before December, 2017, the number of applicable lots increased by 5.1% and 9.2% respectively.

Long-Term Wildfire Reconstruction: In Need of Focused and Dedicated Pre-Planning Efforts

  • Harris, William S.;Choi, Jin Ouk;Lim, Jaewon;Lee, Yong-Cheol
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.923-928
    • /
    • 2022
  • Wildfire disasters in the United States impact lives and livelihoods by destroying private homes, businesses, community facilities, and infrastructure. Disaster victims suffer from damaged houses, inadequate shelters, inoperable civil infrastructure, and homelessness coupled with long-term recovery and reconstruction processes. Cities and their neighboring communities require an enormous commitment for a full recovery for as long as disaster recovery processes last. State, county, and municipal governments inherently have the responsibility to establish and provide governance and public services for the benefit and well being of community members. Municipal governments' comprehensive and emergency response plans are the artifacts of planning efforts that guide accomplishing those duties. Typically these plans include preparation and response to natural disasters, including wildfires. The standard wildfire planning includes and outlines (1) a wildfire hazard assessment, (2) response approaches to prevent human injury and minimize damage to physical property, and (3) near- and long-term recovery and reconstruction efforts. There is often a high level of detail in the assessment section, but the level of detail and specificity significantly lessons to general approaches in the long-term recovery subsection. This paper aims to document the extent of wildfire preparedness at the county level in general, focusing on the long-term recovery subsections of municipal plans. Based on the identified challenges, the researchers provide recommendations for better longer-term recovery and reconstruction opportunities: 1) building permit requirements, 2) exploration of the use of modular construction, 3) address through relief from legislative requirements, and 4) early, simple, funding, and the aid application process.

  • PDF