• Title/Summary/Keyword: Building equipment

Search Result 1,181, Processing Time 0.025 seconds

A Study on the Designer's Demands of Building Equipment Systems and Eco-friendly Environment (생태환경·설비시스템 요구도에 관한 연구)

  • Lee, Shi-Woong;Chin, Kyung-Il;Lee, Kye-Byoung;Choi, Seung-Hee
    • KIEAE Journal
    • /
    • v.5 no.1
    • /
    • pp.59-65
    • /
    • 2005
  • Eco-friendly architecture, generally speaking, is considered as the activity of planting more and designing ponds, therefore many clients and constructors prefer to avoid building so due to initial construction costs. This paper aims to examine the cognition of environmental equipment systems and the applicability of echo-friendly building constructions. We examined the designer's demands of building equipment systems and eco-friendly environment and tried to deduce desirable suggestions for the system. We should solve the fundamentals of economical problems in the construction of eco-friendly buildings and we better think that government should make it a policy to advertise it and to reform the taxation system regarding environment friendly buildings.

Seismic performance of secondary systems housed in isolated and non-isolated building

  • Kumar, Pardeep;Petwal, Sandeep
    • Earthquakes and Structures
    • /
    • v.16 no.4
    • /
    • pp.401-413
    • /
    • 2019
  • The concept of base isolation for equipment is well known. Its application in buildings and structures is rather challenging. Introduction of horizontal flexibility at the base helps in proper energy dissipation at the base level thus reducing the seismic demand of the super structure to be considered during design. The present study shows the results of a series of numerical simulation studies on seismic responses of secondary system (SS) housed in non-isolated and base-isolated primary structures (PS) including equipment-structure interactions. For this study the primary structure consists of two similar single bay three-store reinforced cement concrete (RCC) Frame building, one non-isolated with conventional foundation and another base isolated with Lead plug bearings (LPB) constructed at IIT Guwahati, while the secondary system is modeled as a steel frame. Time period of the base isolated building is higher than the fixed building. Due to the presence of isolator, Acceleration response is significantly reduced in both (X and Y) direction of Building. It have been found that when compared to fixed base building, the base isolated building gives better performance in high seismic prone areas.

Analysis of Office Building HVAC System Drawings (사무용 건축물 공조설비 설계도서 분석)

  • Park, Jong-Il;Kim, Se-Hwan;Kim, Dong-Kyu
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.19 no.11
    • /
    • pp.776-781
    • /
    • 2007
  • Optimized capacity of equipments are essential for energy saving and low cost construction and operation. So we must use proper design data for HVAC system design. We investigated for architectural data, equipment capacity, cooling and heating load design criteria of 52 office buildings. Following research results were obtained by carrying out each task. Office building effective area rate is 63%. The average building cooling load of South Korea is $140W/m^2$ and average heating loads in Seoul and Pusan area are $120{\sim}130W/m^2$ and $70{\sim}80W/m^2$. We also analysised HVAC design criteria. Person ratio in effective building area is $0.2person/m^2$, sensitive and latent heat loads of a person are 60W and 65W, light and equipment loads of office buildings are $25W/m^2$ and $20W/m^2$.

Evaluation of Deterioration Grade for Remodeling Architectural Facilities in Old Schools (학교건물(學校建物) 건축설비(建築設備)시스템의 노후도(老朽度) 평가(評價) 기준(基準)마련을 위한 기초연구(基礎硏究))

  • Cho, Min-Kwan;Cho, Chang-Geun;Park, Jong-Soo
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.13 no.4
    • /
    • pp.15-23
    • /
    • 2006
  • The purpose of this study is to establish the objective deterioration grades and evaluation criteria of building equipment system of educational facilities available for reasonable maintenance and remodeling of them. For the purpose of it, the actual conditions of building equipment systems of the 148 buildings of 84 middle and high schools in Seoul 20 years after construction are investigated and surveyed through one-on-one interviews and questionnaires. And, deterioration grades of them are estimated by the evaluation criteria which is proposed in this study. As a result of this study, the 10 deterioration grades and the 4 evaluation criteria of the 6 performances of building equipment system, which are heating and cooling, water supply and drainage, hot water supply and electrical power performance, are suggested. And, as a result of the survey, it showed that 24% of the investigated school buildings were estimated C grade which needs partial remodelling, and 51% of the school buildings were estimated D grade which needs extensive remodelling. And, 25% of the school buildings were estimated E grade which needs overall remodelling or alteration of building equipment system.

Study on the Crack Control Effect of Moist Curing Equipment in Side Wall of Building (습윤양생 장치를 이용한 아파트 측벽 균열제어에 관한 연구)

  • Kim, Dae-Geon;Lee, Dong-Woon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.2
    • /
    • pp.127-134
    • /
    • 2017
  • In this study, moist curing equipment was used in the exist gang-form system. By achieving sufficient spray curing, the quality of the concrete was improved and the cracking occurred in building's side wall was decreased. The following results could be made as the conclusion. For the compressive strength, all zones showed the similar results. Comparing with the zone without using moist curing equipment, the zone used moist curing equipment showed higher rebound hardness results. For the cracking, the zone utilized moist curing equipment showed the cracking averaged as 6.6 m and the zone without using moist curing equipment showed the cracking averaged as 10.3m. The effectof reducing cracking by utilizing moist curing equipment is about 36 %. Using moist curing equipment is considered as a good solution to reduce the cracking in the structure. Considering all the factors analysed, using moist curing equipment improved the quality of the concrete and decreased the cracking. When this equipment was used in the construction site, it is expected that the construction periodcan be shrunk and the ratio of defect caused by drying shrinkage can be decreased. In this research conditions, The 0.3mm sized moist curing equipment provided the most desirable results on concrete quality and preventing cracking.

Evaluation of Cooling Energy Consumption Varying Economizer Control and Heat Generation Rates from IT Equipment in Data Center

  • Ahmin JANG;San JIN;Minho KIM;Hyoungchul KANG;Sung Lok DO
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.1010-1017
    • /
    • 2024
  • A data center stores and manages internet data. The data center is mainly comprised of IT equipment, cooling systems, and other components. IT equipment is used for storing and processing internet data, generating heat during use. If the heat generated by IT equipment is not removed, it can cause malfunctions, and cooling systems are used to remove this heat. Cooling systems account for more than 40% of the total energy consumption and reducing cooling energy can reduce the overall energy consumption of the data center. Therefore, analyzing the cooling energy consumption according to heat generation changes caused by IT equipment in the data center is necessary. This study analyzed the impact of heat generation changes in IT equipment on cooling energy consumption. Additionally, three different economizer control methods were applied to select the optimal economizer control method. To achieve this, a data center model with economizer systems applied was developed using data measured from IT equipment and cooling systems. As a result, as the operation rates of IT equipment increased from minimum to maximum, the annual energy consumption for each case increased by approximately 11.7%. The economizer analysis showed that the energy savings were greatest when dry bulb temperature control was applied, but it did not meet the operation environment of the IT equipment. Therefore, it was determined that economizer control to meet the operation environment of IT equipment is required to be enthalpy-based.

A Study on the Performance Measuring Methods and Standard for the Technical Package in Zero Energy Building (제로에너지빌딩의 기술 패키지 구성을 위한 성능 기준 및 성능 측정 방법에 관한 연구)

  • Sung, Uk-Joo;Rim, Min-Yeop;Kim, Seok-Hyun;Cho, Soo
    • Journal of Korean Institute of Architectural Sustainable Environment and Building Systems
    • /
    • v.12 no.6
    • /
    • pp.543-556
    • /
    • 2018
  • Zero energy building was attended for energy consumption minimization by the energy saving technology about building heating and cooling energy consumption and the renewable energy production facility. So the government has supported the zero energy building supply for decreasing green gas emissions. The study about inventory of zero energy building has many proceeding. That inventory need the information of material and equipment. So information of material and equipment about zero energy building must be included for the zero energy building realization. Actually the database of zero energy building inventory construction through the inventory established studies has difficult because the database need many information. In this study, author proposed the test methods and performance reference for upload at inventory. It was constructed to material - module - package. Also the author analyzed the construction of the technical package for zero energy building. The author separated performance category to the energy performance for energy analysis and other performance for confirmed the durability, stability and etc. This performance category proposed the table. The test methods of material and equipment in the passive package and active package proposed to the international standard and korea standard basically korea standard. Also the performance reference was proposed to korea legal standard and various standard by this study results. And the authors proposed the table of performance value, test methods, performance reference. By result of this study, the test methods and performance reference will be used the basic data for inventory of zero energy building.

The study on the multizone modeling for preventing transmission of air borne contagion (실내 미생물오염 전파방지를 위한 멀티죤 모델링에 관한 연구)

  • Choi, Sang-Gon;Lee, Hyun-Woo;Hong, Jin-Kwan
    • Proceedings of the SAREK Conference
    • /
    • 2006.06a
    • /
    • pp.429-435
    • /
    • 2006
  • In this study multi-zone modeling program CONTAM 2.4 which is developed by NIST is used for modeling the air disinfection system which is consist of dilution, filtration, ultra violet germicidal irradiation (UVGI) for removing the indoor microorganism such as bacteria and fungus. Developed models those protect occupants against indoor microorganism generated in our daily life are enable to use for immune building simulation tool. Also, results indicate that those models are enable to compute the real situation that is almost impossible of carrying out experiment and identify the disinfection rate with highly reliance. Results also suggest that engineers will use these models as a design tool for the immune building system.

  • PDF

Heavy Equipment Management Plan for BIM-Based Construction Project (BIM을 적용한 건설공사 중장비 투입 계획 방안)

  • Kang, Kyoung-Hwan;Kim, Sang-Hwan;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.171-174
    • /
    • 2010
  • Recently, our construction industry progress using the BIM system in the construction designing part. However, there are not preparing government policy about BIM even if there are many good things using BIM system on planning of heavy equipment. Therefore, planning for a input system of heavy equipment using BIM will be a kind of first challenge in this part. However, we've tried using strength point of BIM system to make better condition of our construction fields. So this study will be expected to shorten the construction time and using heavy equipment effectively.

  • PDF