• Title/Summary/Keyword: Building damage risk assessment

Search Result 66, Processing Time 0.023 seconds

Drought risk assessment considering regional socio-economic factors and water supply system (지역의 사회·경제적 인자와 용수공급체계를 고려한 가뭄 위험도 평가)

  • Kim, Ji Eun;Kim, Min Ji;Choi, Sijung;Lee, Joo-Heon;Kim, Tae-Woong
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.8
    • /
    • pp.589-601
    • /
    • 2022
  • Although drought is a natural phenomenon, its damage occurs in combination with regional physical and social factors. Especially, related to the supply and demand of various waters, drought causes great socio-economic damage. Even meteorological droughts occur with similar severity, its impact varies depending on the regional characteristics and water supply system. Therefore, this study assessed regional drought risk considering regional socio-economic factors and water supply system. Drought hazard was assessed by grading the joint drought management index (JDMI) which represents water shortage. Drought vulnerability was assessed by weighted averaging 10 socio-economic factors using Entropy, Principal Component Analysis (PCA), and Gaussian Mixture Model (GMM). Drought response capacity that represents regional water supply factors was assessed by employing Bayesian networks. Drought risk was determined by multiplying a cubic root of the hazard, vulnerability, and response capacity. For the drought hazard meaning the possibility of failure to supply water, Goesan-gun was the highest at 0.81. For the drought vulnerability, Daejeon was most vulnerable at 0.61. Considering the regional water supply system, Sejong had the lowest drought response capacity. Finally, the drought risk was the highest in Cheongju-si. This study identified the regional drought risk and vulnerable causes of drought, which is useful in preparing drought mitigation policy considering the regional characteristics in the future.

Bayesian Network-based Probabilistic Safety Assessment for Multi-Hazard of Earthquake-Induced Fire and Explosion (베이지안 네트워크를 이용한 지진 유발 화재・폭발 복합재해 확률론적 안전성 평가)

  • Se-Hyeok Lee;Uichan Seok;Junho Song
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.37 no.3
    • /
    • pp.205-216
    • /
    • 2024
  • Recently, seismic Probabilistic Safety Assessment (PSA) methods have been developed for process plants, such as gas plants, oil refineries, and chemical plants. The framework originated from the PSA of nuclear power plants, which aims to assess the risk of reactor core damage. The original PSA method was modified to adopt the characteristics of a process plant whose purpose is continuous operation without shutdown. Therefore, a fault tree, whose top event is shut down, was constructed and transformed into a Bayesian Network (BN), a probabilistic graph model, for efficient risk-informed decision-making. In this research, the fault tree-based BN from the previous research is further developed to consider the multi-hazard of earthquake-induced fire and explosion (EQ-induced F&E). For this purpose, an event tree describing the occurrence of fire and explosion from a release is first constructed and transformed into a BN. And then, this BN is connected to the previous BN model developed for seismic PSA. A virtual plot plan of a gas plant is introduced as a basis for the construction of the specific EQ-induced F&E BN to test the proposed BN framework. The paper demonstrates the method through two examples of risk-informed decision-making. In particular, the second example verifies how the proposed method can establish a repair and retrofit strategy when a shutdown occurs in a process plant.

Seismic vulnerability of old confined masonry buildings in Osijek, Croatia

  • Hadzima-Nyarko, Marijana;Pavica, Gordana;Lesic, Marija
    • Earthquakes and Structures
    • /
    • v.11 no.4
    • /
    • pp.629-648
    • /
    • 2016
  • This paper deals with 111 buildings built between 1962 and 1987, from various parts of the city of Osijek, for which, through the collection of documentation, a database is created. The aim of this paper is to provide the first steps in assessing seismic risk in Osijek applying method based on vulnerability index. This index uses collected information of parameters of the building: the structural system, the construction year, plan, the height, i.e., the number of stories, the type of foundation, the structural and non-structural elements, the type and the quality of main construction material, the position in the block and built-up area. According to this method defining five damage states, the action is expressed in terms of the macroseismic intensity and the seismic quality of the buildings by means of a vulnerability index. The value of the vulnerability index can be changed depending on the structural systems, quality of construction, etc., by introducing behavior and regional modifiers based on expert judgments. Since there is no available data of damaged buildings under earthquake loading in our country, we will propose behavior modifiers based on values suggested by earlier works and on judgment based on available project documentation of the considered buildings. Depending on the proposed modifiers, the seismic vulnerability of existing buildings in the city of Osijek will be assessed. The resulting vulnerability of the considered residential buildings provides necessary insight for emergency planning and for identification of critical objects vulnerable to seismic loading.

Fragility reduction using passive response modification in a Consequence-Based Engineering (CBE) framework

  • Duenas-Osorio, Leonardo;Park, Joonam;Towashiraporn, Peeranan;Goodno, Barry J.;Frost, David;Craig, James I.;Bostrom, Ann
    • Structural Engineering and Mechanics
    • /
    • v.17 no.3_4
    • /
    • pp.527-537
    • /
    • 2004
  • Consequence-Based Engineering (CBE) is a new paradigm proposed by the Mid-America Earthquake Center (MAE) to guide evaluation and rehabilitation of building structures and networks in areas of low probability - high consequence earthquakes such as the central region of the U.S. The principal objective of CBE is to minimize consequences by prescribing appropriate intervention procedures for a broad range of structures and systems, in consultation with key decision makers. One possible intervention option for rehabilitating unreinforced masonry (URM) buildings, widely used for essential facilities in Mid-America, is passive energy dissipation (PED). After the CBE process is described, its application in the rehabilitation of vulnerable URM building construction in Mid-America is illustrated through the use of PED devices attached to flexible timber floor diaphragms. It is shown that PED's can be applied to URM buildings in situations where floor diaphragm flexibility can be controlled to reduce both out-of-plane and in-plane wall responses and damage. Reductions as high as 48% in roof displacement and acceleration can be achieved as demonstrated in studies reported below.

How to Reflect Sustainable Development, exemplified by the Equator Principles, in Overseas Investment (해외투자(海外投資)와 지속가능발전 원칙 - 프로젝트 파이낸스의 적도원칙(赤道原則)을 중심으로 -)

  • Park, Whon-Il
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.31
    • /
    • pp.27-56
    • /
    • 2006
  • Today's financial institutions usually take environmental issues seriously into consideration as they could not evade lender liability in an increasing number of cases. On the international scene, a brand-new concept of the "Equator Principles" in the New Millenium has driven more and more international banks to adopt these Principles in project financing. Sustainable development has been a key word in understanding new trends of the governments, financial institutions, corporations and civic groups in the 21st century. The Equator Principles are a set of voluntary environmental and social guidelines for sustainable finance. These Principles commit bank officers to avoid financial support to projects that fail to meet these guidelines. The Principles were conceived in 2002 on an initiative of the International Finance Corporation(IFC), and launched in June 2003. Since then, dozens of major banks, accounting for up to 80 percent of project loan market, have adopted the Principles. Accordingly, the Principles have become the de facto standard for all banks and investors on how to deal with potential social and environmental issues of projects to be financed. Compliance with the Equator Principles facilitates for endorsing banks to participate in the syndicated loan and help them to manage the risks associated with large-scale projects. The Equator Principles call for financial institutions to provide loans to projects under the following circumstances: - The risk of the project is categorized in accordance with internal guidelines based upon the environmental and social screening criteria of the IFC. - For Category A and B projects, borrowers or sponsors are required to conduct a Social and Environmental Assessment, the preparation of which must meet certain requirements and satisfactorily address key social and environmental issues. - The Social and Environmental Assessment report should address baseline social and environmental conditions, requirements under host country laws and regulations, sustainable development, and, as appropriate, IFC's Environmental, Health and Safety Guidelines, etc. - Based on the Social and Environmental Assessment, Equator banks then make agreements with borrowers on how they mitigate, monitor and manage the risks through a Social and Environmental Management System. Compliance with the plan is included in the covenant clause of loan agreements. If the borrower doesn't comply with the agreed terms, the bank will take corrective actions. The Equator Principles are not a mere declaration of cautious banks but a full commitment of lenders. A violation of the Principles in the process of project financing, which led to an unexpected damage to the affected community, would not give rise to any specific legal remedies other than ordinary lawsuits. So it is more effective for banks to ensure consistent implementation of the Principles and to have them take responsible measures to solve social and environmental issues. Public interests have recently mounted up with respect to environmental issues on the occasion of the Supreme Court's decision (2006Du330) on the fiercely debated reclamation project at Saemangeum. The majority Justices said that the expected environmental damages like probable pollution of water and soil were not believed so serious and that the Administration should continue to implement the project seeking ways to make it more environment friendly. In this case, though the Category A Saemangeum Project was carried out by a government agency, the Supreme Court behaved itself as a signal giver to approve or stop the environment-related project like an Equator bank in project financing. At present, there is no Equator bank in Korea in contrast to three big banks in Japan. Also Korean contractors, which are aggressively bidding for Category A-type projects in South East Asia and Mideast, might find themselves in a disadvantageous position because they are generally ignorant of the environmental assessment associated with project financing. In this regard, Korean banks and overseas project contractors should care for the revised Equator Principles and the latest developments in project financing more seriously. It's because its scope has expanded to the capital cost of US$10 million or more across all industry sectors regardless of developing countries or not. It should be noted that, for a Korean bank, being an Equator bank is more or less burdensome in a short-term period, but it must be conducive to minimizing risks and building up good reputation in the long run.

  • PDF

A Study on Required Safe Egress Time (RSET) Comparison and Error Calculation in Relation to Fire Room Range Set Conditions of Performance Based Fire Safety Designers (성능위주설계자들의 화재실 범위 설정 방식에 따른 소요피난안전시간(RSET) 비교 및 오차산정에 관한 연구)

  • Baek, Sona;Choi, Jun-Ho;Hong, Won-Hwa;Jung, Jong-Jin
    • Fire Science and Engineering
    • /
    • v.30 no.3
    • /
    • pp.73-78
    • /
    • 2016
  • The Installation, Maintence, and Safety Control of Fire-fighting Systems Act of South Korea regulates that over 30-storey high-rise buildings including underground spaces should vitally perform the Performance-based Design to minimize property damage and personal injury as a fire risk assessment in advance. Therefore a PBD designer such as a fire safety professional engineer evaluate occupant's life safety by a scientific methodology. In order to evaluate the life safety, fire safety designers calculate the Required Safety Egress Time (RSET) which does not have the legal criteria regarding the standard method of calculation yet. So this way has been showing different results depending upon the designer's choice, knowledges and experiences. In this study, RSET calculation methods by six designers respectively were analysed from the thirteen reports of real performance based design projects conducted in Busan for a last five years. In particular, the Response Time calculation methods which have the most powerful effect for figuring the RSET are compared with the other designer's to deduce an error value.