• Title/Summary/Keyword: Building cost

Search Result 2,762, Processing Time 0.034 seconds

Numerical Study on the Development of the Seismic Response Prediction Method for the Low-rise Building Structures using the Limited Information (제한된 정보를 이용한 저층 건물 구조물의 지진 응답 예측 기법 개발을 위한 해석적 연구)

  • Choi, Se-Woon
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.33 no.4
    • /
    • pp.271-277
    • /
    • 2020
  • There are increasing cases of monitoring the structural response of structures using multiple sensors. However, owing to cost and management problems, limited sensors are installed in the structure. Thus, few structural responses are collected, which hinders analyzing the behavior of the structure. Therefore, a technique to predict responses at a location where sensors are not installed to a reliable level using limited sensors is necessary. In this study, a numerical study is conducted to predict the seismic response of low-rise buildings using limited information. It is assumed that the available response information is only the acceleration responses of the first and top floors. Using both information, the first natural frequency of the structure can be obtained. The acceleration information on the first floor is used as the ground motion information. To minimize the error on the acceleration history response of the top floor and the first natural frequency error of the target structure, the method for predicting the mass and stiffness information of a structure using the genetic algorithm is presented. However, the constraints are not considered. To determine the range of design variables that mean the search space, the parameter prediction method based on artificial neural networks is proposed. To verify the proposed method, a five-story structure is used as an example.

An Experimental Study on the Mechanical and Durability Properties of Ductile Cement Panel Used Vacuum Extrusion Molding (진공압출성형 고인성 시멘트 패널의 역학 및 내구특성에 관한 실험적 연구)

  • Rho, Hyoung-Nam;Lee, Jong-Suk;Han, Byung-Chan;Kwon, Young-Jin;Lee, Sang-Soo;Song, Ha-Young
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.473-476
    • /
    • 2008
  • Due to the pursuit of high function and international price increase in the field of construction, the application of the secondary product using cement is on the increase gradually in the construction industry in the pursuit of economic cost reduction by the shortening of the construction time like Expediting and the dry construction method at the same time. However, it is in very urgent situation of measures to improve the structural performance or durable performance because it is limited for use in terms of panel in interior exterior building or functional repair reinforce as yet. Accordingly, this study is to investigate applicability of permanent Formwork like mould with the structural performance or excellent durable performance in the field of construction, and to derive optimum mixture in the performance and quality of manufacture. As a result of analysis comparison with the dynamic and durable properties of vacuum extrusion molding high toughness cement panel according to the mixture of four conditions, this study has found that the test body of mixing ECC-DP3 using small filler and large granulated blast furnace slag and powder flame retardant had excellent relative hardness and bending stress strain. The durable performance has shown excellent tendency by the decrease of porosity and enhancement of water-tightness.

  • PDF

An Extraction of Inefficient Factors and Weight for Improving Efficiency of the Curtain wall Life Cycle Process (커튼월 Life Cycle Process의 효율성 향상을 위한 비효율 요인 밑 중요도 도출)

  • Jung Soon-Oh;Kim Yea-Sang;Yoon Su-Won;Chin Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.101-112
    • /
    • 2005
  • Recently, a curtain wall construction is a exterior finishing components which is most used for shortening time in high-rise building as well as the class of key management factors in cost and schedule control. Also, it is recognized that an effective management for curtain wall process is a major subject to accomplish the project successfully. However, as the current management for curtain wall construction is focused on the construction stage, it makes problems such as errors in business performance, rework by mistakes and duplications, errors and omissions by ineffective information management and there has never been any efficient management from a view of the entire Curtain Wall Life-cycle process. Therefore, the aim of this study is to suggest a stage check point for process improvement in the curtain wall Life-cycle process through current curtain wall process analysis, and then to investigate the cause of waste factors using the Muda method from the Toyota Production System and extract the weighted effects of the waste factors using the analytical hierarchy process method. According to the result, Most of the inefficient factors happened in architectural design stage of the entire curtain wall Life-cycle process and my research identified that detail factors of them are a delay of decision making and an approval in changes, a deficit of engineering capacity and a delay of approval in architectural design drawings by owner, etc.

Study on the Application of Semi-open cut Top-Down Construction for Framework (세미 오픈컷 역타공법의 현장적용에 관한 연구)

  • Sho, Kwang-Ho
    • Journal of Korean Association for Spatial Structures
    • /
    • v.11 no.2
    • /
    • pp.129-138
    • /
    • 2011
  • Construction methods for underground structure are classified as bottom-up, up-up, and top-down methods depending on the procedure of construction related to a superstructure. In top-down construction methods, building's main structure is built from the ground level downwards by sequentially alternating ground excavation and structure construction. In the mean time, the main structure is also used as supporting structure for earth-retaining wall, which results in the increased stability of the earth-retaining wall due to the minimized deformation in adjacent structures and surrounding grounds. In addition, the method makes it easy to secure a field for construction work in the downtown area by using each floor slabs as working spaces. However top-down construction method is often avoided since an excavation under the slab has low efficiency and difficult environment for work, and high cost compared with earth anchor method. This paper proposes a combined construction method where semi-open cut is selected as excavation work, slurry as earth -retaining wall and CWS as top-down construction method. In the case study targeted for an actual construction project, the proposed method is compared with existing top-down construction method in terms of economic feasibility, construction period and work efficiency. The proposed construction method results in increased work efficiency in the transportation of earth and sand, and steel frame erection, better quality management in PHD construction, and reduced construction period.

Outsourcing in Hospital Services: Experience of Korean Hospitals (우리나라 대형 종합병원의 아웃소싱 실태)

  • Noh, Tae-Hoon;Lee, Hae-Jong;Park, Eun-Cheol;Kang, Hye-Young
    • Korea Journal of Hospital Management
    • /
    • v.8 no.4
    • /
    • pp.59-75
    • /
    • 2003
  • This study was conducted to investigate the degree of utilization of outsourcing in large hospitals in Korea. We also investigated the outcome and the level of satisfaction for adopting outsourcing in these hospitals. Types of work areas that were currently operated by outsourcing and were planned to adopt outsourcing in the future were identified. A total of 83 hospitals were eligible for this study, which had more than 500 beds, and were identified from the 2003 National Hospital List published by the Korean Hospital Association. A self-administered Questionnaire survey was conducted between April 25th and May 20th in 2003 with a personnel being charged of arrangement of outsourcing in each hospital. Among the 58 hospitals responding the survey(response rate=69.9%), 49 hospitals(84.5%) utilized outsourcing in at least one work field in their organizations. The largest proportion of the hospitals(85.7%) using outsourcing responded that the biggest outcome after introducing outsourcing were cost reduction(49.0%), followed by improved efficiency in operating the organization or human resources(34.7%) and the improved quality of the work(6.1%). The degree of satisfaction for outsourcing among the hospital managers(3.43) was significantly higher than that among the employees(3.l4) on a S-point Likert-type scale(p<0.05). Among the 7 work areas, the hospitals used outsourcing most frequently in facility management(housekeeping, building maintenance, hospital security and parking management), followed by non-medical profit business(funeral, convenient store, and cafeteria), logistics(provision of patient meal, in-house delivery, and purchasing), and information and computing system(hospital information system, maintenance of personal computers and printers). The work areas that the hospitals planned to adopt or expand the outsourcing in the future most frequently were facility management, non-medical profit business, logistics, and information and computing systems. In conclusion, outsourcing was highly diffused in large Korean hospitals, particularly in the work field of facility management and non-medical profit business. The satisfaction for outsourcing was not high yet in Korean hospitals.

  • PDF

A Study on the Theory and its Case Study of Production Design - Focused on the Japanese Construction Projects - (생산설계의 이론과 적용 사례연구 -일본의 건축공사 프로젝트를 대상으로-)

  • Kim, Jin-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.89-101
    • /
    • 2005
  • The early phase of construction projects, communication among the related participants has great influence on the further transaction of the projects. However, important decision making are made by the experience of the field managers in practice without the method for systematic analysis. For example, in building construction project, selection process for construction method has been executed by decision making of some architects dependent on their experience. As a result, there have been frequent construction method alterations during the construction process and delay of duration, addition of cost, etc have followed accordingly. The main reasons of such a mal-functional transaction are due to the absent of the reasonal procedure of decision making reflecting the characteristics of construction project. Therefore, there is a need for an supporting tool and production design for the selection of rational construction method. The objective of this study is to propose production design process and decision making model in relation to various influent factors at the early phase of construction projects. To achieve these objectives, this study 1)analyzes the prior theory about production design, 2)we have studied about selection process for optimal construction method through constraint analysis in structural works, 3)performs a case study to embody the problems of the production design, and 4)proposes a cooperative committee model for supporting production design by analyzing the results of case study and interviewing experts. It is anticipated that the effective tool of proposed model would be able to improve communication among the related participants and systematically accumulate data that might be used in similar construction projects.

Organizational Structures Re-Design for the Regional Construction Management Administrations of the Ministry of Land, Infrastructure and Transport for Improving Management Performance of Construction Projects (건설사업관리 활성화를 위한 국토교통부 지방청 조직 재설계)

  • Jeong, Keun-Chae;Park, Hyung Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.92-100
    • /
    • 2015
  • This study proposes measures to improve management performance of construction projects by re-designing the organizational structures of the Regional Construction Management Administrations of the Ministry of Land, Infrastructure and Transport. The re-designing measures are derived based on the three measures which were established by analyses on status of the Regional Construction Management Administrations, requirements from the current organizational structure, and domestic/overseas examples; the measures are: 1) organizational integration and scope expansion, 2) structural re-organization according to construction projects, and 3) building a knowledge management structure. In order to realize the re-designing measures, sixteen tasks are derived; a milestone is established according to importance, feasibility and lead-lag relationships of these tasks. If these tasks are to be carried out successfully, the management performance of the Regional Construction Management Administrations of the Ministry of Land, Infrastructure and Transport will be expected to improve. Ultimately, the Regional Construction Management Administrations can reduce cost and improve the quality of public service by outsourcing the non-core competence tasks and by concentrating on the construction management for the new infrastructure projects.

An Index for Measuring the Degree of Completeness of BIM-based Quantity Take-Off (BIM기반 물량산출 완성도 측정을 위한 지수 개발)

  • Lee, Chang-Hee;Kim, Seong-Ah;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.79-92
    • /
    • 2011
  • Quantity take-off is one of the critical tasks that determine the cost of a construction project, and its result should be accurate and reliable. BIM-based quantity take-off is a very attractive process for practitioners since the quantity take-off can be done automatically in a fast and accurate way. However, the result of BIM-based quantity take-off can be varied depending on how BIM was modeled. As a project progresses, more detailed design information is getting available, and it can be expected that the degree of completeness and accuracy for the BIMbased quantity take-off is going to be improved as well. However, when estimation is performed at each stage of a project life-cycle, there is no way to measure or forecast how accurate of the quantity take-off result from the BIM data given at the current stage. Therefore, this research derived factors that affect the BIM-based quantity takeoff and developed a methodology and framework to measure and forecast the completeness of BIM-based quantity take-off. The measurement framework and index that are proposed by this research was verified and validated for their consistency and feasibility through six pilot projects.

Comparison of the Construction Waste Generated by the Project and the Estimation of the Waste Generation Unit (건설공사 공정별 건설폐기물 발생량 비교 및 폐기물 발생 원단위 산정에 관한 연구)

  • Song, Tae-Hyeob;Seong, Jin-Uk
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.4
    • /
    • pp.427-434
    • /
    • 2017
  • The generation of construction waste can be divided into a decommissioning phase and a new construction phase, and most of the waste is generated at the decommissioning stage. However, recently, domestic new construction construction has expanded to 150 trillion yards per year, so construction work is increasing rapidly. Especially, as the size of the construction work with much waste of construction waste exceeds 100 trillion, the management of the amount of construction waste in the new construction site is required. Unlike the dismantling work site, the new construction site can separate waste generated by each property, and relatively low foreign matter content is generated. The purpose of this study was to investigate the amount of construction waste generated by new construction sites and to calculate the unit amount of construction waste based on this. In addition, since the existing unit cost is centered on concrete and mixed waste, we set the basic unit by setting synthetic resin, waste wood, and waste board as additional items. The basic unit survey was carried out to investigate the wastes according to the characteristics of each construction period. As a result of the survey, the new construction site showed that most wastes were discharged in the first 30% and after 70% of the process, and the ratio of mixed construction waste was as high as 45%. As a result of this study, it was found that about twice as much waste was produced as compared with the conventional standard product.

A Study on Organic-Inorganic Hybrid Sound Absorbing Materials Using by Recycling Gypsum (재활용 석고 부산물을 이용한 유무기 하이브리드 흡음재 개발 연구)

  • Shin, Hyun-Gyoo;Jeon, Bo-Ram;Ha, Joo-Yeon;Jeon, Chan-Soo
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.4
    • /
    • pp.481-487
    • /
    • 2017
  • The purpose of this study is to develop the hybrid sound-absorbing materials that is made from organic polyurethane sponge impregnated with inorganic binder solutions. The inorganic slurry which is made from ${\alpha}$-hemihydrate gypsum mixed with 60% water, and various additives including plasticizer are used as binder. The test specimens are prepared and tested for sound absorption performance by the impedance tube methods. From the test results, noise reduction coefficient(NRC) of development materials specimen bound by the inorganic binder slurry is 0.41. They are 2 times or more higher than commercial products specimens bound by organic materials only which have NRC values in the range of 0.14 to 0.28. The polyurethane sponge specimens impregnated with inorganic gypsum slurry binder have a good balance between performance and cost, and have proper properties in density, thermal conductivity, non-combustible, and absence of harmful substances as sound-absorbing internal boards for noise barrier wall. It is apparent that the good sound absorption materials can be produced according to the optimum mix design that is recommended from this study.