• Title/Summary/Keyword: Building automation system

Search Result 293, Processing Time 0.023 seconds

Routing Algorithm of Wireless Sensor Network for Building Automation System (빌딩 자동화를 위한 무선 센서 네트워크 라우팅 프로토콜)

  • Lu, Delai;Hong, Seung-Ho
    • Proceedings of the IEEK Conference
    • /
    • 2009.05a
    • /
    • pp.45-47
    • /
    • 2009
  • Wireless Sensor Network(WSN) has been very popular in unattended surveillance systems recently. For Applying WSN into Building Automation system(BAS), a novel hierarchial network structure and static routing algorithm which eliminates the scalability limitation of Zigbee are proposed in this paper. The static routing algorithm relying on the hierarchial network address reduces the computational complexity to a great extent and has a real-time performance which satisfies urgent applications well.

  • PDF

A Study on the Performance Evaluation System for the Construction Factory System Applied to High-Rise Building Construction in Korea (우리나라 초고층용(超高層用) 건설(建設)팩토리 개발(開發)을 위한 성능평가체계(性能評價體系)에 관(關)한 기초적(基礎的) 연구(硏究))

  • Choi, Won-Jun;Kim, Chang-Kyu;Song, In-Shick;Lim, Sang-Chae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.11a
    • /
    • pp.105-108
    • /
    • 2007
  • This study aims to develop a performance evaluation system for the Construction Factory(CF). The CF is a kind of full automation system for building construction which consists of the lifting system for building materials, the built-up unit for steel structural components, the bolting robots, the control center for the site management, and the site covering system. The CF is developing now as a project of the construction automation and robotics. In this study we firstly reviewed the state-of-the-art of the construction automation and robotics in the foreign and the domestic, and investigated the precedent case of the CF such as the SMART System of Shimizu Co., Japan. We believe that without an objective evaluation of the results there won't be growth in technological R&D. Therefore, this study sees the developing CF as an new technology and method in building construction, and proposes the direction and frame of the appropriate evaluation which can be applied into the CF.

  • PDF

Automation of Architectural Design Process and Robotic System in Building Construction using Object-Oriented Design

  • Choo, Seung-Yeon;Park, Sang-Min
    • Journal of Korea Multimedia Society
    • /
    • v.12 no.12
    • /
    • pp.1787-1795
    • /
    • 2009
  • This paper describes an automation of architectural design processes and the direction between this automation and robotic system in building construction using the concept of the object-oriented design in architecture. The research starts from the premise that many computer-aided design systems are mostly aimed at serving as drawing tools which are used only after a design formal solution has already been established by the architect. If the computer is well applied to the architectural design process, many positive things such as standardization of design detail, increasing productivity and collaboration, minimizing construction costs etc. can be done. To support an early design solution in the computer-based environment, the proposed automation was developed and tested in a real building project, using the object-oriented design concept such as product model. This design automation gives various design alternatives from the early design phase to the final stage of design details, according to musical harmony. This paper shows how architectural design process can be automated and how the data of the applied architectural design can be integrated into product model environment, in relation to robotic system in building construction.

  • PDF

A Study on the Development of Building Control and management System -Focusing on the Lighting Control and Monitoring system- (빌딩 제어 및 관리 시스템 개발에 관한 연구 -조명 제어 관리 시스템 구축을 중심으로-)

  • Cho, Sung-O
    • Korean Institute of Interior Design Journal
    • /
    • v.16 no.4
    • /
    • pp.110-118
    • /
    • 2007
  • Technology has been viewed at various stages of civilization as leading to future progress. The building, its services systems and management of the work process all contribute to the well-being of people within an organization. Productivity relies on there being a general sense of high morale and satisfaction with the workplace. Now buildings are considered as providing a milieu for human creativity. Flexibility, adaptability, service integration and high standards of finishes offer an intelligence threshold. Building Automation System(BAS) - controlled lighting systems may offer incremental energy saving. Conventional Lighting control systems often control equipment in a single room or over the limited area, because they are centralized control systems, which means that all the controlled circuits must be wired to a single control panel. The computers used by these systems are typically dedicated microprocess that perform only lighting control functions. By comparison, modern Building automation systems are distributed control system, which means that their computing hardware and software are distributed as a network that microprocessor-based control modules and standard PC. PLC(Programmable Logic controller) is extensible virtually without limits, so that all the lighting in a facility can be controlled by single, unified system - the same system that also can control and monitor the building's HVAC, security, and manufacturing processed, elevators, and more. A Building automation system can control light using schedules, manual controls, occupancy sensors, and photosensors, either singly or in combination. Building Lighting control and monitoring system will be for a energy saving and efficient building management system.

BACnet/ZigBee-based Lighting Control System (BACnet/ZigBee 프로토콜 기반의 조명제어시스템)

  • Chon, Y.J.;Park, T.J.;Park, D.K.;Hong, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 2006.10c
    • /
    • pp.117-119
    • /
    • 2006
  • BACnet(Building Automation and Control networks) is a standard data communication protocol designed specifically for building automation and control systems. BACnet provides five options for datalink layer protocols and these five datalink layer options can be applied with various transmission media. Recently wireless technology prevails in automation area. ZigBee is a standard protocol based on IEEE 802.15.4 for low-speed wireless communication network. In this study, we propose a BACnet/ZigBee model that uses ZigBee wireless technology in a BACnet communication network system as a wireless datalink layer protocol. We also applied this model to a lighting control system to evaluate the feasibility of proposed technology. The technology proposed in this paper can extend the application of BACnet not only for building automation but also for home automation by taking the advantages of ZigBee wireless communication technology in BACnet communication network systems.

  • PDF

Drive Performance Analysis of Climbing Hydraulic Robots System for Construction Automation (시공자동화를 위한 크라이밍 유압시스템의 구동성능 분석)

  • Kang, Go-Une;Lee, Myung-Do;Lee, Kyu-Won;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.33-36
    • /
    • 2010
  • The attention in construction Automation is getting higher since it could be the answer to the lack of skilled labor by decrease in construction population and aging which adversely affects productivity and quality in the construction site. We are on the way to develop a construction automation system adequate for domestic circumstances in Korea; it is called RCA(Robotic-crane based Construction Automation)system. Climbing hydraulic robots system is a part of RCA system and makes Construction factory(CF) climb through the guide rail on the core wall. The safety of climbing hydraulic robots system is at issue due to the overloaded weight of CF. Preventing this issue, present study did the design verification through the structural analysis and the simulation. Mock-up test also was done to analyze the drive performance of climbing hydraulic robots system.

  • PDF

건물자동화장비(BAS)

  • 강인구;이봉훈
    • Journal of the Korean Professional Engineers Association
    • /
    • v.16 no.1
    • /
    • pp.48-54
    • /
    • 1983
  • Building management cost increases enormously as modern buildings become complicated. Lost of building eveners or managers feel the need to cut down the cost not sacrifying Comfort building environment and building safety, The ways to achieve such goal are maintaing with a few person, proper HVAC scheduling to save energy BAS's i.e the building automation system or building maintenance system, are designed to meet the goal. In korea, imported BAS's have been installed past several years. Difficulties arised in several aspects. One is extra high cost in installing BAS's because of marginal coat. Another is long settling time because it is originated from abroad. GSC/85/30 is the first trial as a korean BAS to minimize such difficulties. Even though it is a primitive system, it is a mileston of korean BAS the technics gained from developing GSCI/85/30 can be utilized to develop higher version and is now. As modern buildings become more complicated and hugy, managers owner of buildings seek for the system to manage building properly. BAS(Building Automation System or Building management system) is designed to meet the need.

  • PDF

Facade Cleaning Process Analysis For Construction Robot System Design of High-rise Building External wall Maintenance (고층건물 외벽 유지보수 건설로봇 시스템 개발을 위한 청소공정 작업절차 분석)

  • Kim, Dae-Geon;Kim, Bok-Kyu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.77-79
    • /
    • 2011
  • As residents and building owners demand maintenance that is required to achieve sustainable building performance, efficient building management methods are required. Even though the demand for maintenance systems is increasing, current maintenance work for high-rise buildings mostly uses conventional ropes and gondolas that pose a high risk of accidents and exhibit poor performance and efficiency. Thus, there is an urgent need to develop an automation robot system that can reduce accidents and improve the maintenance efficiency of the conventional high-rise building façade maintenance system. As a preceding work for the development of an automation robot system, this study classified and analyzed the work processes of actual construction sites and proposed basic techniques for the work mechanisms of the robot system by investigating the motions of cleaning workers.

  • PDF

Derivation of Work to be Automated in Reinforced Concrete Construction (철근 콘크리트 공사의 자동화 대상작업 도출)

  • Jeon, Eun-Bi;Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.293-294
    • /
    • 2021
  • For the successful introduction of the construction automation system, it is necessary to define the consideration factors and target tasks for the necessity of automating the conventional methods. In this study, the factors for automation were derived through brainstorming and questionnaires, and calculated the relative importance through the pairwise comparison using the AHP analysis method. In addition, the detailed type of concrete work was classified into 32 detailed works, and the automation score for each work was calculated by investigating the factors considering the necessity of automation. As a result of the automation score analysis, it was concluded that the need for automation of concrete placing work was the highest. Based on this study, we will consider the strategy of a concrete construction automation system.

  • PDF

The Study on the Suggestion of Development Guideline for Automated Building Construction System (건물 자동화 시공 시스템 개발 방향에 관한 연구)

  • Lee, Ung-Kyun;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.3
    • /
    • pp.67-73
    • /
    • 2007
  • Increasing wages and decreasing skilled labors are problems awaiting solution. The development of automatic technologies contributes to accelerating the one of construction automation. Thus, this study is to suggest the way to develop the automated building construction system base on one performed in Japan in order to solve urgent problems of construction industry in Korea. Therefore interviews and questionnaires were performed based on experts who work for the automated building construction system field and analyzed through analytic hierarchy process. In doing so, it was the most important factor to develop a branch of automatic, mechanical or machine technologies for the automated building construction system. Especially the study indicated the importance of the technologies to substitute skilled labors such as a robot. This research could contribute to developing the automated building construction which is very unique and suitable for construction industry in Korea.