• Title/Summary/Keyword: Building Maintenance

Search Result 1,534, Processing Time 0.028 seconds

Developing Stochastic Long-Term Maintenance Cost Estimating Method for Apartment Housing (추계적 공동주택 장기수선충당금 산출 및 분석 방법론 개발)

  • Gwak, Han-Seong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.243-244
    • /
    • 2015
  • This paper presents a Stochastic Long-Term Maintenance Costs Estimating Method for the Apartment Housing (SLCE). A simulation approach is used for generating the stochastic long-term maintenance cost, and it is based on the defined variability in repair cycle of the individual maintenance elemental within the process. SLCE provides the probability distribution of the budget required to maintain the apartment housing. A case study is presented to demonstrate and to validate the system.

  • PDF

Applying BIM and GIS to Railway Maintenance Works in Taiwan

  • Liu, Li-Shih;Shr, Jin-Fang
    • International Journal of Aerospace System Engineering
    • /
    • v.2 no.1
    • /
    • pp.18-23
    • /
    • 2015
  • Based on real jobs, this study was carried out the Railway maintenance works in Taiwan. It hopes to use Geographic Information System(GIS) and Building Information Modeling(BIM) for changing the maintenance model from "post-damage repair" to "preventive maintenance". Accordingly, this research will build a Railway Repairing Database that installs all repair data. This database will also connect to GIS so that can be the source of analysis and statistic for repair paln. The main results of research are as follows: I. All data stored on cloud space that raises the ability to manage and plan on repair. II. Simplify the file work and increase the quantity of case data to the manager who can get more reliable source. III. The data offer objective judgment to avoid subjective argument. IV. Add the GIS information to improve the maintenance because of good analisis.

Development of Nexus for BIM and Documents based on Maintenance Process (유지보수공사 프로세스기반 BIM-문서 넥서스 구축)

  • Han, Ji-Ho;Park, Sang-Hun;Yoon, Sun-Jae;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.168-169
    • /
    • 2021
  • Maintenance is carried out over a long period of time, and various documents are utilized in the maintenance work. In maintenance work which is progressed simultaneously in a short period of time, it is important to provide relevant information to the parties in a timely manner. As the types of work increase, manager needs more time and effort to select and utilize the documents. It is necessary to have an information system that supports the person in charge by grasping work procedures for each construction and providing the necessary documents and information for that step. This paper proposes an process based nexus model that can provide necessary documents to the parties to the work steps by linking the maintenance work process and BIM. Through the nexus model presented, manager can efficiently acquire the necessary documents and utilize them for the construction works currently being carried out.

  • PDF

A Study on the Changing Factors in Cost Estimate Standard for Reinforced Concrete Structure Maintenance (철근콘크리트 구조물 유지보수 공사비산정기준 개정요인에 관한 연구)

  • Song, Tae-Seok;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.315-316
    • /
    • 2021
  • The proportion of maintenance work has been increasing due to the recent aging of the infrastructure, but the standardized construction cost estimation standards are insufficient for this. In particular, reinforced concrete structures are being applied to many structures such as buildings and bridges, and various construction methods for maintenance of reinforced concrete structures are being developed and applied. In this study, we surveyed about the current status of the construction method for the maintenance work of reinforced concrete structures and analyze the factors of the revision of the construction cost estimate standard for the reinforced concrete structure maintenance.

  • PDF

A Study on the System Improvement Plan for an Efficient Market Maintenance Project (시장정비사업의 효율적 실시를 위한 제도개선방안 연구)

  • Kim, Seung-Hee;Kim, Young-Ki
    • Journal of Distribution Science
    • /
    • v.11 no.4
    • /
    • pp.23-35
    • /
    • 2013
  • Purpose - This paper attempts to identify the problems and limitations of a market maintenance project conducted according to the 「Special Act for the Development of Traditional Markets and Shopping Street」 and to present a revised direction for the special law and lay the groundwork for market maintenance projects to be promoted smoothly. Research design, data, and methodology - The revised direction for the legislation and the proposal were written based on an investigation of the problems and the legal system, and proposed measures for market maintenance operation and system improvements to derive the improvements needed for market maintenance projects. Results - A market maintenance project has been conducted as a means to reinvigorate traditional markets that are economically depressed, and to revive the local economy. It was largely conducted in the form of reconstruction and redevelopment and represents the interests of landowners and merchants. Thus, it is most likely to contribute to the gradual disappearance of traditional markets. First, as part of a market maintenance project, many companies are building multipurpose buildings or high-rise residential buildings to increase profits. In these high-rise buildings, they can raise rents, which may not be affordable for some existing small businesses. To solve such problems, the large-scale store registration requirement needs to be relaxed or abolished once the market maintenance project is completed. If the large-scale store registration requirement is to be abolished, the term 'large retail store' should be changed in the 「Special Act for the Development of Traditional Markets and Shopping Street」. After registration, the Small and Medium Business Administration should train merchants, offer consultations, and support events, to the extent that the existing traditional market management modernization project permits, and further continue to manage and support its ongoing activities. However, unless large-scale store registration is abolished, adding an exception clause in the special law to relax large-scale store registration criteria, and permitting changes to building use is another option. At the end of a market maintenance project, empty stores should be purchased by the Small and Medium Business Administration, and local government, etc., at the actual construction cost, to utilize them as public rental shopping areas, which in turn may be re-utilized as a temporary market for another market maintenance project. The second problem in market maintenance projects is merchant-protection. Currently, the special law prescribes that a temporary market be created for merchants to conduct business during the rental period of a market maintenance project. Conclusions - In reality, a market maintenance project is conducted usually in big metropolitan cities with 500,000 residents or more. The main building type created under these projects is a multipurpose building. For this reason, it is very difficult to secure a location for a temporary market in the surrounding area of such a project. To solve this problem, this study suggests 'public rental shopping areas' as mentioned above.

  • PDF

A Development of the On-line Maintenance and Management System for the HVAC Systems and the Evaluation of Its Effects (공조설비 온라인 유지관리시스템 개발 및 효과분석)

  • Lee, Tae-Won;Kim, Yong-Ki;Woo, Nam-Sub
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.21 no.11
    • /
    • pp.591-598
    • /
    • 2009
  • The service quality with the various building equipments tends to depend on the individual superintendent's capability and efforts generally and this often lead to poor maintenances and managements of them. N-BMS(Networked Building Management System), proposed in this study, is a new type of building management method, which links principal equipments within many buildings into a communication network and carries out several significant missions such as fault detection, deterioration diagnosis and control the equipments and so on, as well as monitoring which is the main and unique purpose of the conventional BMS. How to construct the N-BMS was considered to keep performance of equipments high and thus to save energy and resource. LCC(Life Cycle Cost) based analysis was also performed in order to verify the effects of some maintenance and management works for the building HVAC systems.

Preliminary Analysis on Artificial Intelligence-based Methodology for Selecting Repair and Rehabilitation Methods of Bridges (인공지능 기반의 교량 보수공법 선정 기술 개발을 위한 선행 분석)

  • Kim, Jonghyeob;Jung, In-Su;Yun, Won-Gun;Kim, Jung-Yeol;Park, In-Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.6_2
    • /
    • pp.861-872
    • /
    • 2021
  • An efficient cost management is important for the domestic social overhead capital(SOC) based on a long lifecycle after 30 years since completion. Maintenance in South Korea have had the restrictions of consistency and suitability of decision-making by the establishment of a budget plan based on the company estimate and repair and reinforcement methods determined by the inspection and diagnosis engineers' subjective determination for each facility. To resolve this issue, the Korea Institute of Civil Engineering and Building Technology is currently in development of a methodology to propose an optimum maintenance method according to the damage of components by artificial intelligence. This study has deduced the primary factors by analyzing information generated during bridge maintenance and management as a prior step for the development of technologies, and conducted a preliminary analysis to select the optimum artificial intelligence technology.

COBie Based Maintenance Document Generation of Railway Track (COBie 기반 철도 선로유지관리 문서 생성)

  • Seo, Kyung-Wan;Kwon, Tae-Ho;Lee, Sang-Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.4
    • /
    • pp.307-312
    • /
    • 2017
  • In this study, we proposed a method to generate a maintenance documents for railway track through Construction Operations Building information exchange(COBie) which is a subset of Industry Foundation Classes(IFC), a data model for Building Information Modeling(BIM). In order to define the items necessary for railway track maintenance document generation, we analyzed the guideline of maintenance and management to track by the Ministry of Land, Infrastructure and Transport(MLTM), and defined the way to refer to the information items in the COBie spreadsheet. The additional properties not supported in IFC, were created for generation of an Information model that reflecting maintenance information items of railway track by applying user-defined property set within the IFC framework. An IFC-based Information model reflecting the user-defined property was implemented through BIM software, and rail track maintenance information items were transferred to COBie spreadsheet according to the defined approach. It is tested that the information can be transferred from the IFC-based as-built model to the COBie spreadsheet, which can be used to generate the necessary documents for railway facility maintenance work.

Development of a Vertically Moving Scenario of Robotic Exterior Wall Cleaning for High-rised Building (고층 건축을 위한 수직외벽 청소로봇의 작업 시나리오 개발)

  • Kim, Kyoon-Tai;Kim, Chang-Han;Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.195-196
    • /
    • 2011
  • Recently, the number of high-rise buildings has been on the rise, which has meant that maintenance cost has increased by two and three times, along with the increase in the construction cost. It is suggested that the use of an auto-cleaning robot could increase the productivity and safety of cleaning work, which is mostly done outside of a building. In particular, the guide rail on a high-rise building could be useful in this capacity, as it has the advantage of not being significantly influenced by factors of the external environment, including wind pressure. For this reason, this research is preliminary research into a cleaning automation for a high-rise building, and aims to draw up a scenario for the vertically moving robot.

  • PDF

Factor Analysis for Environment Improving Budget of Facilities - Focused On School Facility In Gyeongsangnamdo - (시설물 환경개선 예산편성을 위한 항목분석 - 경상남도 학교시설물 중심으로 -)

  • Hong, Kang-Min;Yu, Hyeon-Ju;Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.255-256
    • /
    • 2015
  • House supplying rate of building facilities is over 100% in 2008. In modern society, many people are thus interested in maintenance phase of building facilities by environment improvement budget because 20 years or more of building facilities are increasing rapidly. Maintenance of building facilities is depending on various factors that impact on the environment improvement budget of building facilities. However, Various methods and factors are made up complex relationships. I will analyze that environment improvement budget associated with floor, gross area, local, school type, service life and other elements.

  • PDF