Journal of the Korea Institute of Building Construction
/
v.12
no.6
/
pp.664-673
/
2012
Determining the layout of temporary facilities that support construction activities at a site is an important planning activity, as layout can significantly affect cost, quality of work, safety, and other aspects of the project. The construction site layout problem involves difficult combinatorial optimization. Recently, various artificial intelligence(AI)-based algorithms have been applied to solving many complex optimization problems, including neural networks(NN), genetic algorithms(GA), and swarm intelligence(SI) which relates to the collective behavior of social systems such as honey bees and birds. This study proposes a site facility layout optimization algorithm based on self-organizing maps(SOM). Computational experiments are carried out to justify the efficiency of the proposed method and compare it with particle swarm optimization(PSO). The results show that the proposed algorithm can be efficiently employed to solve the problem of site layout.
Journal of the Korean Institute of Educational Facilities
/
v.12
no.4
/
pp.5-16
/
2005
The objective of this study is to analyze the layout types by the characteristics of 24 high school sites in Gyeonggi-do. These 24 high schools were built to establish the learner-oriented education in high schools to comply with the 7th Curriculum of the Ministry of Education. The 7th Curriculum has been altered from the supply-oriented to the demand-oriented and learner-oriented one since the year of 2000 to meet the demands of the fast moving society. For this study, the following researches have been conducted; 1) Literature were reviewed to examine the educational systems that supported architectural planning of existing high schools. 2) The environment and characteristics of the high school sites were investigated and current move in planning of high school site was examined. 3) Layout types were classified by the configurations of existing high school buildings. The output of this study was used to find the architectural data such as building site, building coverage, floor area ratio, the number of floors, site shape, direction and front of building.
This study is to analyze the building layout of traditional government office building in Chungchong province with Chungchong-do regional maps and Eupjis(邑誌) being compiled in the late Chosun dynasty. The building layout of government office in Chungchong-do is followed in the wake of the spatial structure, Sam-Jo(三朝, three reign) and Oejeon-Naejeon(外殿-內殿), of Chosun dynasty palace. The planning principle of Sam-Jo at government office, Dongheon(東軒) territory for rule administration corresponds to Chijo(治朝) with a local governor who is the ruler, as for the Naea(內衙) territory which a family of him and he lives in, it is corresponded to Yeonjo(燕朝), and in the job space of Ajeon(衙前), it is corresponded to Oejo(外朝). As for the application of the inside and outside principle of provincial government office, Dongheon is corresponded to Oejeon and Naea to Naejeon. A compositive and an approach axis of government office in Chungchong-do is correspond with Dongheon in the center, and these axes form an central axis and an entry space of government office included Oesammun(外三門) Naesammun(內三門) Dongheon or Naea. Because an essential performance of provincial government office is provincial administration, the layout configuration of government office is a function, which is an expression of an official institution.
Cho, Eun Kil;Kim, Young Hoon;Kim, Won Cheon;Park, Joon Young
Land and Housing Review
/
v.10
no.4
/
pp.1-12
/
2019
The purpose of this study is to set the direction of development of the design guideline of the New-Hanok-Style public building in apartment complex and to use it as basic data for future architecture plans. The existing Hanok architecture standards and guidelines were analyzed and the characteristics of New-Hanok-Style Public Building in apartment complex were applied. The planning direction of the design guideline was derived. First, although the criteria and guidelines related to the Hanok produced and distributed were classified differently according to the purpose of production, the details and contents were similar. Second, the general planning criteria items were divided into layout, external space plan, building plan, and performance plan. Third, the elements of 'creative inheritance of traditional architecture' and 'modern building technology', which are the characteristics of New-Hanok-Style Public Building, were applied. In addition, we analyzed elementary welfare facility guidelines and applied elements such as layout type and zoning setting. Fourth, a special planning standard for applying the building system required for the New-Hanok-Style Public Building in apartment complex was added. In the future, it is expected to revitalize New-Hanok-Style Public Building containing the unique identity(genetic factor; DNA) of the nation by developing and disseminating relevant building standards, design guidelines, and maintenance manuals.
International conference on construction engineering and project management
/
2017.10a
/
pp.42-51
/
2017
Due to the high degree of mechanization and the good environmental benefits, the prefabricated buildings are being promoted in China. The construction site layout of the prefabricated buildings has important influence on its safety benefit. However, few scholars have studied the safety problem on it. Firstly, in order to give a follow-up study foreshadowing the characteristics of prefabricated buildings are analyzed, the research assumptions are given and three types of safety buffers are established. And then a mult-objective model for the prefabricated buildings site layout is presented: taking into account the limits of noise, the coverage of the tower crane and the possibility of exceeding boundaries and overlapping, the constraints are and designed established respectively; Based on the improved System Layout Planning (SLP) method, the efficiency\cost\safety interaction matrices among the facilities are also founded for objective function. For the sake of convenience, a hypothetical facility layout case of the prefabricated building is used, the optimal solution of that is obtained in MATLAB with particle swarm algorithm (PSO), which proves the effectiveness of the model presented in this paper.
Journal of the Korean Institute of Educational Facilities
/
v.20
no.2
/
pp.3-14
/
2013
The purpose of this study is to analyze patterns of public school building layout types, open space and relationship with communities in the Manhattan grid plan. The study illustrates how building layout patterns of school facilities are influenced by societal demands in the urban grid environment. During the nineteenth century, the Island of Manhattan was transformed into a physical representation of the Cartesian coordinate system via the development of the grid street plan. In order to take advantage of streets as urban space, it is quite important to understand characteristics of communities and open space relationships between buildings and streets. Moreover, the strategic planning of schools' outdoor space vitalizes public streets as a critical community anchor. This research reviews 118 Manhattan public schools and categorizes them by (1) building layout type, (2) site type, (3) circulation and public open space, which are the biggest factors that determine the layout patterns of the public schools in Manhattan. As a result of analysis, the layout patterns are classified into seven types : "ㅡ", "L", "ㄷ", "ㅁ", "H", "T" and "other" type. Of these, "ㅡ" type and "L" type occur most frequently, because these configurations most flexibly fit into the limited grid-locked blocks, the various types of site & topography, and adapt most dynamically to the open spaces created by using avenues and streets. The ultimate objective of this study is to provide a case study for future efforts to plan open spaces for campuses that effectively utilize the streets in proximity.
Journal of the Korean Institute of Educational Facilities
/
v.24
no.2
/
pp.3-10
/
2017
This study compared evacuation effectiveness between the conventional school auditorium plan and a suggested hypothetical plan that was generated by a mathematical model, which is commonly applied in the field of industrial engineering. Recent school buildings became much more complicated in floor planning due to new social needs and modern curriculum than the old days. Nevertheless, architect's approach to floor composition in terms of fire emergency evacuation planning, still has no relation to optimized effective but relies more on an conventional school planning. Therefore, since school buildings are much more likely to be exposed to any fire related events than any other building types, emergency exit effectiveness based on spatial composition has to be seriously evaluated with a scientific method. The algorithm, which acquires the number of persons in each spatial type(node) per floor and the minimum physical distance between spatial types(arc), can propose the most optimized spatial layout per floor regarding emergency evacuation event. Consequently, this study evaluated school's fire exit effectiveness focusing on auditorium area with the scientific tool and suggested the most reliable spatial layout regarding possibile emergency evacuation event.
International conference on construction engineering and project management
/
2009.05a
/
pp.747-753
/
2009
Planning the construction for a system of bored piles in building foundation engineering is (1) to predict the time duration required to complete all the bored piles with due consideration of relevant engineering factors and site constraints; then (2) to predict the total project time generally by aggregating the predicted working duration for construction of each bored pile. The duration for construction of an individual bored pile results from analyzing various working sequences and different activity duration (such as predrilling, excavation, steelfixing, air-lifting, and concreting, etc.), which is informed by experiences and site records of previous projects. However, determining the project duration for constructing many bored piles on one site is much more complicated than adding up the time duration for individual piles. In practice, project schedules are often found to be unrealistic and incorrect during the construction stage. This is because construction planning is not based on a exhaustive and comprehensive evaluation of site factors, such as site layout plan, site constraints, quality control, environmental control, safety control and logical relationships between different trades. In this paper, we identify those factors based on a foundation engineering site in Hong Kong with ninety-seven bored piles and address their effects on uncertainties in activity time and project time.
The subjects of this study were limited to Silla buddhist temple remains in the 6~8th century, where the excavation survey report was published and the details of the remains of the corridor are revealed. Since the corridor completes the structure of temple and is involved in formation of the space, the building plan for corridors is thought to have an intention linked to the entire temple. Thus, more closer study is required for this construction plan to identify the role of corridors. The corridor is a building that has a low architectural hierarchy and completes the layout and composition of the temple. In the unit planning of the corridor, unit were designed to be of a certain size in the temple layout. Then, the overall scale was made by adding the fixed size of unit. The combination of corridors are the combined points of paths and were used as visual points. The structure of the corridor was constructed to be adjusted according to the size of the main compartment of the building to which it was connected and inserted under the roof of the building. The adjustment of the unit changed in the range of 0.5 to 2 of Silla's system of measurement. The usage of embedded pillar in the corridor presents a new perspective on Silla architecture.
Journal of the Korea Academia-Industrial cooperation Society
/
v.15
no.10
/
pp.6344-6353
/
2014
According to the changes in society, the knowledge industrial center, which is a factory related to the manufacturing industry, is now including various programs, such as information and communication knowledge. This study defined the knowledge industrial center related law into three periods: deduct layout planning type and outside space composition elements by previous research; case analysis; and suggestions of the direction of layout planning and outside space plan. As a result of the analysis, first, before 1999, the layout of the building is made mainly with a car, but depending on the form of the site, it is configured as a centered, side layout. Second, in the case of distribution, the support facility on the lower part is integrated and the factory on the higher part is distributed, so it is partly integrated and the building is unified. Third, beginning with the activation of privately owned public space in a semi-industrial district according to architecture regulations in 1999, the outside space is wider but the construction area is reduced, so the outside space composition has been changing in a similar manner to the planning methods of business facilities, such as office buildings.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.